PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UP-0383/2021
1. Location of the project/Scheme : Uttar Pradesh
 (i) State / Union Territory : Uttar Pradesh  (ii) District : Gorakhpur  (iii) Forest Division : Forest Division Gorakhpur  (iv) Area of forest land proposed for diversion (in ha.) : 8.3746  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Forest Division Gorakhpur8.3137Reserved Forest
2Forest Division Gorakhpur0.0609Unclassed Forests
Total 8.3746
Division 1. : Forest Division Gorakhpur
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Gorakhpur8.3746
Total8.3746
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
18.37460.4Eco 1
Total. 8.3746


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Shorea RobustaShakhu77934000
2Terminalia Arjunaarjun16573000
3Syzigium CuminiJamun1147000
4Ficus BengalensisBargad021000
5Mangifera IndicaAam848000
6Ficus ReligiosaPeepal003000
7Dalburgia SisooSisham1830000
8Tectona GrandisSagon68311000
9Melotus PhilippensisRohni240000
10OthersBel1541000
11OthersBadhar002000
12OthersKadam010000
13Diasporus MelanoxylonTendu3170000
14Ficus RacemosaGular101000
15Albizzia lebbeckSiras28190000
16Adina cordifoliaHaldu010000
17EucalyptusEcua;yptus7275000
18OthersChid640000
19OthersBabul020000
20OthersJangle Jalebi400000
21Madhuca indicaMahua023000
22Artocarpus Heterophylluskathal001000
23Bombox CeibaSemal523000
24Azadirachta IndicaNeem310000
25Saraca AsocaAshok8700000
26Ficus LacorPadad110000
27OthersNariyal050000
28Bauhinia ParvifloraKachnar300000
29embelica officinalisAmla3500000
30OthersAsna1100000
31OthersGulchaman010000
32OthersGutel36110000
33OthersAkesiya1610000
34OthersKanji420000
35OthersKhanjhi020000
36OthersSali35130000
37OthersMolandi1330000
38OthersTekui010000
39OthersKokat2180000
Total 444 33273 00 0
Sub Total (No of Trees.) 849


5. Working plan prescription for the forest land proposed for diversion : The area is covered under Planting Working Circle of the Working Plan
6. Brief note on vulnerability of the forest area to erosion : aria is not vulnerable to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : nil
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 59.45
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1116.75RFcampierganj4    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Part 2
2 Joint Inspection Report
3 DFO Inspection Report
4 NPV Calculation sheet
5 Land Suitable for CA Plantation
6 Land Ownership Related Certificate
7 Undertaking of Bachanbaddhta
8 Toposheet for CA Land
9 CA scheme

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Gorakhpur3484.005713.00166.69841338.2631/08/20228.26132.94
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Forest Division GorakhpurGorakhpur Circle GorakhpurDFOYesOne13/08/2022
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Forest Division GorakhpurGorakhpur Circle GorakhpurDFO RecommendedPublic Interest
Gorakhpur Circle GorakhpurCF Recommended RecommendedYes
Nodal Officer RecommendedRecommended for Approval.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Uttar PradeshState SecretaryRecommended07/10/2022RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/UP/06/285/2022/FC30/12/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UP/ROAD/138464/2021ROAD138464202194317,976,537.0017,976,537.0003/02/2023868272Union Bank Of IndiaNEFT/RTGS (Challan)11/01/202312/01/2023
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 16.75   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)16.75
  Status of CA Land so identified : Forest Area   Site Name : campierganj   Location Details : campierganj   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
campierganjRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UP/ROAD/138464/202116 Nov 2023No DataApproved.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/UP/ROAD/138464/202114 Aug 2024
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/UP/ROAD/138464/202105 Aug 2024EDS: eds letter attached.05 Aug 2024
FP/UP/ROAD/138464/202120 Jun 2024EDS: EDS letter attached.05 Aug 2024
FP/UP/ROAD/138464/202109 Aug 2024EDS: EDS Reply letter has not been uploaded.09 Aug 2024
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UP/ROAD/138464/202121 Jun 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UP/ROAD/138464/202104 Sep 2024APPROVED