PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UP-0201/2019
1. Location of the project/Scheme : Uttar Pradesh
 (i) State / Union Territory : Uttar Pradesh  (ii) District : Lucknow  (iii) Forest Division : Awadh Forest Division Lucknow  (iv) Area of forest land proposed for diversion (in ha.) : 0.044014  (v)

Category of the Proposal: Others
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Awadh Forest Division Lucknow0.044014Protected Forest
Total 0.044014
Division 1. : Awadh Forest Division Lucknow
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Lucknow0.044014
Total0.044014
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.0440140.1Eco 3
Total. 0.044014


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Pongamia PinnataKanji010000
2Holoptelia integrifoliaChilbil000100
3Ficus ReligiosaPipal010000
4Terminalia ArjunaArjun000001
5Delonix RegiaGold Mohar001000
Total 0 21 10 1
Sub Total (No of Trees.) 5


5. Working plan prescription for the forest land proposed for diversion : The area is covered under plantation working circle of working plan.
6. Brief note on vulnerability of the forest area to erosion : Area is not vulnerable to soil erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Not Present
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 1.16220
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.10PFSarojanainagar1    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Certificate
2 FRA
3 Binduwaar akhya
4 Certificate of benefiting from the project
5 Area Calculation Sheet
6 Certificate of not having wildlife Bihar
7 Certificate regarding payment of increased amount
8 compensatory afforestation certificate
9 Gazat
10 Non-commencement certificate
11 Task Force related certificate
12 Layout related certificate
13 NPV Certificate
14 Alternate land Certificate
15 Pccf letter no 1017 dt. 11.11.2011 related certificate
16 mac Disposal Certificate
17 schedule rate
18 Joint Report
19 NPV Prakklan

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Lucknow25280010327.12254.4896293.4815/10/2020282.975.27
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
 Lucknow Circle LucknowCFNoNo Data
Awadh Forest Division LucknowLucknow Circle LucknowDFOYesOne21/09/2020
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Awadh Forest Division LucknowLucknow Circle LucknowDFO RecommendedProtected Forest Land to be diverted for entryIexit to BPGL Retail Outlet on Bani Mohanlalganj Road MDR 89C , ln KM Stone No. 4.00 , At Khasra No.268, Village Dhawapur, Tehsil Sarojini Nagar, Dist Lucknow
Lucknow Circle LucknowCF RecommendedProtected Forest Land to be diverted for entryIexit to BPGL Retail Outlet on Bani Mohanlalganj Road MDR 89C , ln KM Stone No. 4.00 , At Khasra No.268, Village Dhawapur, Tehsil Sarojini Nagar, Dist LucknowYes
Nodal Officer RecommendedRecommended for Approval.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Uttar PradeshState SecretaryRecommended21/01/2021Recommended for Approval. State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/UP/06/32/202119/07/2021
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UP/Others/42191/2019OTHERS421912019389159,786.00159,786.0009/08/2021P221210121498169Union Bank Of IndiaNEFT/RTGS (Challan)06/08/202106/08/2021
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 0.1   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)0.1
  Status of CA Land so identified : Forest Area   Site Name : Protected Forest Land to be diverted for entryIexit to BPGL Retail Outlet on Bani - Mohanlalganj Road (MDR- 89C), ln KM Stone No. 4.00 , At Khasra No.268, Village: Dhawapur, Tehsil: Sarojini Nagar, Di   Location Details : Forest Block:Kuroni,Range:Sarojninagar   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Forest Block:KuroniRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UP/Others/42191/201923 Aug 2021No DataApproved.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/UP/Others/42191/201908 Sep 2021
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UP/Others/42191/201909 Sep 2021
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UP/Others/42191/201911 Oct 2021APPROVED