PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UP-06/2020
1. Location of the project/Scheme : Uttar Pradesh
 (i) State / Union Territory : Uttar Pradesh  (ii) District : Bareilly  (iii) Forest Division : Social Forestry Division Bareilly  (iv) Area of forest land proposed for diversion (in ha.) : 0.4368  (v)

Category of the Proposal: Others
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Social Forestry Division Bareilly0.4368Protected Forest
Total 0.4368
Division 1. : Social Forestry Division Bareilly
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Bareilly0.4368
Total0.4368
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.43680.2Eco 3
Total. 0.4368


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Cassia FistulaAmaltas200000
2OthersKadamb700000
3OthersChakresiya600000
4Terminalia ArjunaArjun500000
5OthersKanji2200000
6Dalburgia SisooSheesham200000
7Albezzia LabbeckSiras600000
8OthersBeri100000
9OthersKanju100001
Total 52 00 00 1
Sub Total (No of Trees.) 53


5. Working plan prescription for the forest land proposed for diversion : Area is covered under plantation working circle of the working plan
6. Brief note on vulnerability of the forest area to erosion : Area is not vulnerable to soil erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 50
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No Wildlife Present
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : Yes
  (a)Details of violation(s): Construction of Approach Road
   (b) Period of Work done(year) : 6
   (c) Area of forest land involved in violation (in ha.) : 0.095
S. No. Name of person responsible for violation Designation & Address of person responsible for violationAction taken against the person responsible for violation
1Neeraj GoelDirector Neo Star Reality Pvt Ltd Krishna Janki Place Rampur Garden BareillyDestroyed Approach access and raised hcase
12. Whether work in violation is still in progres(Yes/No) : No
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 13.94394
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.88Delhi-Lucknow Road KM 282-284FaridpurDelhi-Lucknow Road KM 282-284    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 CA Undertaking
2 Pollution NOC 4
3 Penalty Calculation
4 Effected Trees
5 FRA
6 Non Commencement of Work
7 Standard Conditions
8 Task Force
9 Vanya Jeev Abhyaran
10 Joint Inspection
11 Violation Details
12 Muck Disposal
13 NPV Calculation
14 NPV Undertaking
15 Van Swaroop
16 NHAI NOC Undertaking
17 Pollution NOC 3
18 Pollution NOC 1
19 Pollution NOC 2

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Bareilly412000410.84374.115442100.808531/12/2018100.80850
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Social Forestry Division BareillyBareilly Circle BareillyDFOYesOne12/10/2020
 Bareilly Circle BareillyCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Social Forestry Division BareillyBareilly Circle BareillyDFO RecommendedRecommended
Bareilly Circle BareillyCF RecommendedRECOMMENDEDYes
Nodal Officer RecommendedRecommended for approval.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Uttar PradeshState SecretaryRecommended02/11/2021Recommended for approval.State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/UP/06/250/2021/FC15/03/2024
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UP/Others/26336/2017OTHERS2633620175702,868,226.002,868,230.0016/04/2024BARBR52024041600989011Union Bank Of IndiaNEFT/RTGS (Challan)NANA
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 0.88   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Strip(Avenue)0.88
  Status of CA Land so identified : Forest Area   Site Name : Delhi-Lucknow Road KM 282-284   Location Details : Delhi-Lucknow Road KM 282-284   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Delhi-Lucknow Road KM 282-284PF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UP/Others/26336/201703 May 2024No DataApproaved.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/UP/Others/26336/201729 Jan 2025
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/UP/Others/26336/201711 Nov 2024EDS: eds letter upload.23 Dec 2024
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UP/Others/26336/2017Compliance uploaded.13 Nov 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UP/Others/26336/201711 Apr 2025APPROVED