PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UP-024/2022
1. Location of the project/Scheme : Uttar Pradesh
 (i) State / Union Territory : Uttar Pradesh  (ii) District : Bijnor  (iii) Forest Division : Social Forestry Division Bijnor  (iv) Area of forest land proposed for diversion (in ha.) : 0.1847  (v)

Category of the Proposal: Others
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Social Forestry Division Bijnor0.1847Protected Forest
Total 0.1847
Division 1. : Social Forestry Division Bijnor
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Bijnor0.1847
Total0.1847
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.18470.1Eco 3
Total. 0.1847


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1EucalyptusEucalytus000001
2Terminalia ArjunaArjun000001
Total 0 00 00 2
Sub Total (No of Trees.) 2


5. Working plan prescription for the forest land proposed for diversion : Working plan prescription for the forest land proposed for diversion.
6. Brief note on vulnerability of the forest area to erosion : The Proposed Area is Not Vulnerablyto erasion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 10
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No. Wildlife present in and around the forest land proposed for diversion
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : NIL
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 4.05500
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.3694RFDhampurRainy forest block    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 CA undertaking.
2 Undertaking SPWD condition.
3 Alternative land certificate.
4 Standard condition.
5 Undertaking 10km radius.
6 Joint inspection report.
7 Benefitted for public.
8 Calculation of NPV levies.
9 GIO letter.
10 Justification.
11 Land owner ship.
12 Land shedule.
13 Minimum land certificate.
14 No start of work.
15 NPV deposite.
16 Tree falling list.
17 Undertaking ETP.
18 Undertaking non forester work on forest land.
19 Vansawroop.
20 Area calculation.
21 Task force.
22 Muck disposal.
23 No violation.

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Bijnor45610087815.69227.0084017/10/2023227.000
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Social Forestry Division BijnorMoradabad Circle MoradabadDFOYesOne22/09/2023
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Social Forestry Division BijnorMoradabad Circle MoradabadDFO Recommended The requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project
Moradabad Circle MoradabadCF RecommendedI Agree with the recommendation of DFO Bijnor.Yes
Nodal Officer RecommendedRecommended for approval.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Uttar PradeshState SecretaryRecommended14/11/2023RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/UP/06/184/2023/FC19/03/2024
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UP/Others/150354/2021OTHERS1503542021167582,402.00582,402.0001/05/2024SBINR52024050119602402Union Bank Of IndiaNEFT/RTGS (Challan)04/04/202405/04/2024
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 0.38   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)0.38
  Status of CA Land so identified : Forest Area   Site Name : Rainy forest block-I Range dhampur Division Bijnor   Location Details : Rainy forest block-I Range Dhampur Division Bijnor   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Rainy forest block-IRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UP/Others/150354/202105 Jun 2024No DataApproved.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/UP/Others/150354/202106 Jun 2024
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UP/Others/150354/202110 Jun 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UP/Others/150354/202129 Jul 2024APPROVED