PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UP-0194/2021
1. Location of the project/Scheme : Uttar Pradesh
 (i) State / Union Territory : Uttar Pradesh  (ii) District : Bijnor  (iii) Forest Division : Social Forestry Division Bijnor  (iv) Area of forest land proposed for diversion (in ha.) : 0.1954  (v)

Category of the Proposal: Others
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Social Forestry Division Bijnor0.1954Protected Forest
Total 0.1954
Division 1. : Social Forestry Division Bijnor
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Bijnor0.1954
Total0.1954
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.19540.1Eco 3
Total. 0.1954


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Pongamia PinnataKanji000050
Total 0 00 05 0
Sub Total (No of Trees.) 5


5. Working plan prescription for the forest land proposed for diversion : The Area is Covered Under Plantation Working circle of Working Plan.
6. Brief note on vulnerability of the forest area to erosion : Forest area is not vulnerability erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 25
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No. wildlife present in and around the forest land proposed for diversion .
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : NIL
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 16.11500
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.40PFDhampurNehtaur-Haldaur Road (SH-12) Km.154 to 155    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Non Forestry Works.
2 Joints Inspection.
3 Land Owner Ship.
4 PWD Condtion.
5 Task force.
6 No Violation Certificate.
7 Justificatio.
8 Joints Inspection
9 Undertaking Entire Tree Plats.
10 Undertaking 10 km. Radius.
11 Calculation of NPV Lavies.
12 Calculation.
13 Tree felling List.
14 Muck Management Plan.
15 Benefit of Population.
16 CA Undertaking.
17 Calculation of Forest and Non Forest land.
18 Minimum Land Certificate.
19 FRA Certificate.
20 NPV Deposite.
21 CA georeference map.
22 Van Swaroop Certificate.
23 Task Force .
24 Standard Condition.

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Bijnor45610047815.69211.779466011/12/2021335.92450
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Social Forestry Division BijnorMoradabad Circle MoradabadDFOYesOne29/11/2021
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Social Forestry Division BijnorMoradabad Circle MoradabadDFO RecommendedRecommendation for the benefit of Public.
Moradabad Circle MoradabadCF RecommendedI Agree with the recommendation of DFO Bijnor.Yes
Nodal Officer RecommendedRecommended for approval.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Uttar PradeshState SecretaryRecommended27/07/2022RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/UP/06/213/2022/FC19/01/2023
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UP/Others/141612/2021OTHERS1416122021594584,450.00584,450.0026/03/2025PUNBR52025032610179099Union Bank Of IndiaNEFT/RTGS (Challan)23/03/202525/03/2025
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 0.4   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)0.4
  Status of CA Land so identified : Forest Area   Site Name : Kaderpur jaswant forest block Bijnor Forest Range Social Forestry Division Bijnor   Location Details : Kaderpur jaswant forest block Bijnor Forest Range Social Forestry Division Bijnor   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Kaderpur jaswant forest block Bijnor Forest Range Social Forestry Division BijnorRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UP/Others/141612/202128 Apr 2025No DataApproved.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/UP/Others/141612/202129 Apr 2025
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UP/Others/141612/2021Copliance uploaded.29 Apr 2025
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UP/Others/141612/202109 May 2025APPROVED