PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UP-0182/2020
1. Location of the project/Scheme : Uttar Pradesh
 (i) State / Union Territory : Uttar Pradesh  (ii) District : Agra  (iii) Forest Division : Social Forestry Division Agra  (iv) Area of forest land proposed for diversion (in ha.) : 0.1790312  (v)

Category of the Proposal: Approach Access
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Social Forestry Division Agra0.1790312Protected Forest
Total 0.1790312
Division 1. : Social Forestry Division Agra
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Agra0.1790312
Total0.1790312
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.17903120.1Eco 3
Total. 0.1790312


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL
5. Working plan prescription for the forest land proposed for diversion : area is covered under Plantation as per working plan of working circle.
6. Brief note on vulnerability of the forest area to erosion : Forest area is not vulnerable to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 2.5634
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.09Mahdau Forest BlockKirawali1    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 No Violation
2 Lease
3 No Tree Cutting
4 Payment of NPV
5 Standard Condition
6 Undertaking by DFO
7 Undertaking Payment of CA
8 Durlabh prajati
9 Undertaking FRA
10 Joint Inspection
11 Beneficiary
12 Land Calculation
13 Land Ownership
14 Minimum Use of Forest Land
15 Muk Disposal
16 No Tree Cutting
17 No Alternate Land
18 No work start
19 NPV Calculation
20 NPV
21 PF Land Notification
22 Justification for the use of Forest Land
23 Monument
24 Undertaking by User Agency
25 Undertaking Central and State Gov. Condition
26 Vanswroop
27 wildlife Sanctuary
28 Undertaking

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Agra40270038681.3370239.6809852640.6506/10/2020725.5640
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Social Forestry Division AgraAgra Circle AgraDFOYesOne05/10/2020
 Agra Circle AgraCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Social Forestry Division AgraAgra Circle AgraDFO Recommended Project Is in public interest hence so recommended
Agra Circle AgraCF RecommendedRecommended.Yes
Nodal Officer RecommendedRecommended for approval.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Uttar PradeshState SecretaryRecommended14/10/2020 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/UP/06/135/202019/10/2020
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UP/Approach/50244/2020APPROACH502442020978425,384.00425,384.0023/10/2020SBIN420297313424Corporation BankNEFT/RTGS (Challan)22/10/202023/10/2020
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 0.163   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)0.163
  Status of CA Land so identified : Forest Area   Site Name : MAHDAU VAN BLOCK KIRAWALI RANGE   Location Details : 27° 8'57.06"N 77°37'37.33"E   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
MAHDAU VAN BLOCKOther Forest Land
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UP/Approach/50244/202029 Oct 2020No DataApproved.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/UP/Approach/50244/202029 Oct 2020
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UP/Approach/50244/202029 Oct 2020
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UP/Approach/50244/202003 Nov 2020APPROVED