PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UP-0309/2021
1. Location of the project/Scheme : Uttar Pradesh
 (i) State / Union Territory : Uttar Pradesh  (ii) District : Bareilly  (iii) Forest Division : Social Forestry Division Bareilly  (iv) Area of forest land proposed for diversion (in ha.) : 0.187  (v)

Category of the Proposal: Approach Access
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Social Forestry Division Bareilly0.187Protected Forest
Total 0.187
Division 1. : Social Forestry Division Bareilly
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Bareilly0.187
Total0.187
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.1870.3Eco 3
Total. 0.187


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Albizzia lebbeckSiras120000
2Ficus RacemosaKathgoolar1100000
3OthersSubabool221000
4OthersKanji1710000
5Cassia FistulaAmaltas100000
6Ficus RacemosaGoolar100000
7Syzigium CuminiJamun200000
8Anacardium OccidentaleKanju100000
9OthersShehtoot400000
Total 30 151 00 0
Sub Total (No of Trees.) 46


5. Working plan prescription for the forest land proposed for diversion : Area is covered under plantation working circle of the working plan
6. Brief note on vulnerability of the forest area to erosion : Area is not vulnerable to soil erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 50
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No Wildlife Present
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : Yes
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 6.75225
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.467Khallpur Van KhandFaridpurNA    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Non Commencement Of Work
2 NPV Calculation
3 Additional NPV
4 Binduwan Aakhya
5 CA Undertaking
6 Dandatmak Vraksharoapan
7 Joint Inspection Report
8 Labhanvit Gram
9 Muck Disposal
10 Sharto Ka Anupalan
11 FRA
12 Vanya Jeev Vihar
13 Vaikalpit Bhoomi
14 Disha Nirdesh
15 Van Swaroop
16 Paudho Ko Nuksaan Nahi Pahuchana
17 Standard Conditions
18 Task Force
19 EDS reply Letter 3154 And Tree List

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Bareilly412000410.84374.115442100.808531/12/2018100.80850
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Social Forestry Division BareillyBareilly Circle BareillyDFOYesOne12/12/2022
 Bareilly Circle BareillyCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Social Forestry Division BareillyBareilly Circle BareillyDFO RecommendedRecommended
Bareilly Circle BareillyCF RecommendedRECOMMENDEDYes
Nodal Officer RecommendedRecommended for approval.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Uttar PradeshState SecretaryRecommended06/01/2024RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/UP/06/01/2024/FC21/05/2024
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UP/Approach/145304/2021APPROACH1453042021338854,330.00854,330.0024/09/2024IBKLR92024092400076400Union Bank Of IndiaNEFT/RTGS (Challan)05/06/202405/06/2024
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 0.467   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)0.467
  Status of CA Land so identified : Forest Area   Site Name : Khallpur Van Khand, range-faridpur   Location Details : Khallpur Van Khand, range-faridpur   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Khallpur Van KhandRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UP/Approach/145304/202116 Jan 2025No DataApproved.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/UP/Approach/145304/202122 Mar 2025
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/UP/Approach/145304/202120 Mar 2025EDS: has been not uploade eds letter cf20 Mar 2025
FP/UP/Approach/145304/202116 Jan 2025EDS: eds leter send21 Feb 2025
FP/UP/Approach/145304/202121 Mar 2025EDS: eds reply has been not uploaded privesh portal21 Mar 2025
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UP/Approach/145304/2021uploade compliance17 Jan 2025
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UP/Approach/145304/202107 Apr 2025APPROVED