PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UP-0182/2021
1. Location of the project/Scheme : Uttar Pradesh
 (i) State / Union Territory : Uttar Pradesh  (ii) District : Etah  (iii) Forest Division : Social Forestry Division Etah  (iv) Area of forest land proposed for diversion (in ha.) : 0.048679  (v)

Category of the Proposal: Approach Access
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Social Forestry Division Etah0.048679Protected Forest
Total 0.048679
Division 1. : Social Forestry Division Etah
3. District wise area to be diverted in the division
S. No. DistrictArea(in ha.)
NIL
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.0486790.01Eco 3
Total. 0.048679


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Others000000
Total 0 00 00 0
Sub Total (No of Trees.) 0


5. Working plan prescription for the forest land proposed for diversion : The area is covered under plantation working circle of the working plan
6. Brief note on vulnerability of the forest area to erosion : Forest area is not vulnerable to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 15
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : NO
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 0.131420
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.09sheetalpur van block Etah Jalesar Aliganj9    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 lees rate
2 smarak certifciate
3 provisional anpatti certificate
4 van swaroop certifcate
5 durlab sanktapann certifciate
6 wild life related certificate
7 bhumi upyktata certificate
8 npv certificate final

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Etah2452921033.29734.783932126.4226/08/2021126.420
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Social Forestry Division EtahAligarh Circle AligarhDFOYesOne26/08/2021
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Social Forestry Division EtahAligarh Circle AligarhDFO RecommendedA proposal has been received by this office from Bharat Petroleum Corporation Limited for diversion under FCA 1980 of 0.0486790 Hectares of Protected Forest land for non forest purpose. The project envisages the Diversion of Protected Forest Land for Retail Outlet On Mathura Sadabad Jalesar Road SH 122 New Km 70 CH 69.411 Khasra No. 1378, Village Jalesar Bahar Chungi, Tehsil Jalesar District Etah. The Recommendation of the land in proposal has been done by me on dated 26 08 2021
Aligarh Circle AligarhCF Recommended As per MOEF letter dated 16.10.2000 for proposal involving more than 40 ha. of forest land, The site inspection report from Conservator of Forest is require. Since area involved in the proposal is 0.0486790 ha. Hence site has not been inspected.Yes
Nodal Officer RecommendedRecommended for approval.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Uttar PradeshState SecretaryRecommended31/12/2021Recommended for approval.State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/UP/06/03/2022/FC04/02/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UP/Approach/142891/2021APPROACH1428912021429178,044.00178,044.0017/05/2022BARBZ22137834148Union Bank Of IndiaNEFT/RTGS (Challan)09/05/202211/05/2022
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 0.1   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)0.1
  Status of CA Land so identified : Forest Area   Site Name : SHEETALUR VAN BLOCK   Location Details : NIL   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
NA
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UP/Approach/142891/202124 Apr 2023No DataApproved.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/UP/Approach/142891/202116 Jun 2023
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/UP/Approach/142891/202124 Apr 2023EDS: EDS26 May 2023
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UP/Approach/142891/202125 Apr 2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UP/Approach/142891/202108 Aug 2023APPROVED