PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UP-0366/2021
1. Location of the project/Scheme : Uttar Pradesh
 (i) State / Union Territory : Uttar Pradesh  (ii) District : Hapur  (iii) Forest Division : Forest Division Hapur  (iv) Area of forest land proposed for diversion (in ha.) : 0.2544  (v)

Category of the Proposal: Approach Access
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Forest Division Hapur0.2544Protected Forest
Total 0.2544
Division 1. : Forest Division Hapur
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Hapur0.2544
Total0.2544
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.25440.5Eco 3
Total. 0.2544


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1EucalyptusSafeda0025814
Total 0 02 58 14
Sub Total (No of Trees.) 29


5. Working plan prescription for the forest land proposed for diversion : plantation working circle
6. Brief note on vulnerability of the forest area to erosion : No soil erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No wildlife sentuary
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 5.226
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.5088RFGarhmukhteswer1    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Joint Inspection.
2 Eco Sensitive Zone Related
3 Tree list 29
4 NPV Amount certificate
5 NPV Calculation
6 Van Swroop related certificate
7 Wildlife related Certificate.
8 Badhak Vriksh
9 Benefite People Related Certificate
10 FRA Related Certificate
11 GOI Akhya
12 CA related Certificate
13 digital-map
14 No work start related certificate
15 Sthambh 11 Related Certificate
16 toposheet
17 Land suitabaliti certificate
18 All Documents Part 1 And Part 2
19 DFO Site Inspection Report

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Hapur66000916.86179.1594593.8512/08/202393.850
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Forest Division HapurMeerut Circle MeerutDFOYesOne10/08/2023
 Meerut Circle MeerutCFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Forest Division HapurMeerut Circle MeerutDFO RecommendedRecommended in public interest.
Meerut Circle MeerutCF RecommendedRecommended in public interest.Yes
Nodal Officer Recommended Recommended for approval.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Uttar PradeshState SecretaryRecommended03/10/2023RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/UP/06/179/2023/FC15/05/2024
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UP/Approach/139274/2021APPROACH1392742021392835,154.00835,154.002024-06-12PUNBR52024061219231515Union Bank Of IndiaNEFT/RTGS (Challan)2024-06-112024-06-11
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 0.5088   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)0.5088
  Status of CA Land so identified : Forest Area   Site Name : Reserve forest Village Aalamgirpur Forest Block bearing survey no./compartment no.-1, patch No-1 of village Aalamgirpur Forest Block, Tehsil Garhmukteswer, Distt. Hapur   Location Details : Reserve forest Village Aalamgirpur Forest Block bearing survey no./compartment no.-1, patch No-1 of village Aalamgirpur Forest Block, Tehsil Garhmukteswer, Distt. Hapur   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Alamgirpur Forest BlockRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UP/Approach/139274/202125 Jun 2024No DataApproaved.
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/UP/Approach/139274/202103 Feb 2025EDS: eds reply has been not uploaded.04 Feb 2025
FP/UP/Approach/139274/202121 Dec 2024EDS: eds29 Jan 2025
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UP/Approach/139274/2021Compliance uploaded.24 Dec 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UP/Approach/139274/2021Approved In-PrincipleNo Data