PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UP-015/2021
1. Location of the project/Scheme : Uttar Pradesh
 (i) State / Union Territory : Uttar Pradesh  (ii) District : Muzaffarnagar  (iii) Forest Division : Social Forestry Division Muzaffarnagar  (iv) Area of forest land proposed for diversion (in ha.) : 0.2024  (v)

Category of the Proposal: Approach Access
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Social Forestry Division Muzaffarnagar0.2024Protected Forest
Total 0.2024
Division 1. : Social Forestry Division Muzaffarnagar
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Muzaffarnagar0.2024
Total0.2024
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.20240.3Eco 3
Total. 0.2024


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Eucalyptuseukalyptus010122
Total 0 10 12 2
Sub Total (No of Trees.) 6


5. Working plan prescription for the forest land proposed for diversion : as per plantation working circle of working plan
6. Brief note on vulnerability of the forest area to erosion : not vulnerabile for soil erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 15
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : nil
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 0.85
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.21FARAKPUR FOREST BLOCKMuzaffarnagarFARAKPUR FOREST BLOCK    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 NON AREA CALCULATION
2 1980 CERTIFICATE
3 NPV CALCULATION
4 VAN SWROOP
5 VANY JEEV VIHAR
6 1980 NEW SARTIFICATE
7 PRSAV PARIKSHN
8 JOINT INSPECTION
9 MANAK SHARTEN
10 yojna ayog
11 akshartipurk vanikaran
12 forest area in propsal
13 muck disposal managment plan
14 18.03.2010 vachanbadhtta
15 11.07.2014 vachanbadtta
16 vany jeev
17 PROJECT SITE JUSTIFICATION
18 1980 2ND CERTIFICATE
19 samuly bhumi
20 labhanvit garm
21 badhi hui npv
22 bharat sarkar
23 any vaiklpic bhumi
24 CF EDS DATED 25.01.2021 SUBMITTED
25 FRA 2006
26 eds MOEF 04.03.2021 CLEAR
27 MOEF EDS DATED 11.06.2021 RESOLVE

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Muzaffarnagar4008006199121.922836339.6701/01/2021339.6717.50
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Social Forestry Division MuzaffarnagarSaharanpur Circle SaharanpurDFOYesOne16/01/2021
 Saharanpur Circle SaharanpurCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Social Forestry Division MuzaffarnagarSaharanpur Circle SaharanpurDFO RecommendedRECOMMENDED
Saharanpur Circle SaharanpurCF RecommendedRecommendedYes
Nodal Officer RecommendedRecommended for approval.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Uttar PradeshState SecretaryRecommended12/02/2021Recommended for approval. State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/UP/06/53/202110/07/2021
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UP/Approach/118062/2020APPROACH1180622020966211,703.00211,703.0022/07/2021PUNB720213095387Union Bank Of IndiaNEFT/RTGS (Challan)18/07/202119/07/2021
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 0.21   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)0.21
  Status of CA Land so identified : Forest Area   Site Name : Farakpur forest block in muzaffarnagar range   Location Details : Farakpur forest block in muzaffarnagar range   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Farakpur forest block in muzaffarnagar rangeRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UP/Approach/118062/202011 Aug 2021No DataApproved.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/UP/Approach/118062/202011 Aug 2021
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UP/Approach/118062/202012 Aug 2021
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UP/Approach/118062/202002 Sep 2021APPROVED