PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UK-0150/2020
1. Location of the project/Scheme : Uttarakhand
 (i) State / Union Territory : Uttarakhand  (ii) District : Haridwar  (iii) Forest Division : Haridwar  (iv) Area of forest land proposed for diversion (in ha.) : 0.3969  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Haridwar0.3969Reserved Forest
Total 0.3969
Division 1. : Haridwar
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Haridwar0.3969
Total0.3969
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.39690.3Eco 3
Total. 0.3969


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1TeakKathsagon 2952000
2Teaksagon611100
3Trevia nudifloraGutel320000
4Acacia Catechukhair021730
5Aegle MarmelosBail000100
6Butea Monospermadhak010000
7Misc. Specieskuda100000
8Melia Azadirachtabakain001000
9Cassia Fistulaamaltas020000
10Holoptelia integrifoliakanju201000
Total 41 136 93 0
Sub Total (No of Trees.) 72


5. Working plan prescription for the forest land proposed for diversion : Yes
6. Brief note on vulnerability of the forest area to erosion : 0.3969
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Elephant, Leopard, Deer, Cheel/Shambhar, Nilgai Etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : Yes
  Details and comments on the impact of Project on such areas : In the proposed area, wildlife, especially elephants, is being transported due to the water facilities in the Ganges river, due to which the need to increase the height of the east-facing electric poles on the route, after the 4 lane widening of National Highway 74, to keep the elephant corridor safe. Is Happening
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): Yes
  Details of Protected Area and comments on the impact of Project on the ESZ : Increasing the height of the proposed electric pole is unlikely to adversely affect / affect the movement of wildlife.
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : Yes
  Details and comments on the impact of Project on such areas : The proposed area is located 0.67 meters away from the buffer zone limit of Rajaji tiger reserve.
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
NO Data
(ii). Copy of CA scheme details: NA (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.: (V). Copy of NOC from Competent Authority:
Additional information Details
S. No. DocumentsRemarks
1 The proposed power line is already in place. Due to the widening of 4 lanes of National Highway no. 74, it has become absolutely necessary to increase the height of electric poles so that the safe movement of wildlife is not obstructed.

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Haridwar29932036951.114459.20705542.9022/08/20204763.20779.70
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
HaridwarShivalikDFOYesOne22/08/2020
 ShivalikCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
HaridwarShivalikDFO RecommendedIn order to protect wildlife, shifting of electric poles is very important so that their safe movement is not adversely affected.
ShivalikCF Recommended Yes
Nodal Officer RecommendedAs per file attached
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
UttarakhandState SecretaryRecommended18/09/2020 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
DehradunState Government2(35)/202017/09/2020
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UK/TRANS/47915/2020TRANS479152020677393,864.00393,864.0006/02/2021PUNB203618374066Corporation BankNEFT/RTGS (Challan)06/02/202106/02/2021
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details) : No
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UK/TRANS/47915/202016 Mar 2021No DataAs per file attached
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/UK/TRANS/47915/202016 Mar 2021
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UK/TRANS/47915/202018 Mar 2021
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UK/TRANS/47915/202021 Jun 2021APPROVED