PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UK-023/2022
1. Location of the project/Scheme : Uttarakhand
 (i) State / Union Territory : Uttarakhand  (ii) District : Pauri Garhwal  (iii) Forest Division : Lansdowne  (iv) Area of forest land proposed for diversion (in ha.) : 1.8675  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Lansdowne1.08Reserved Forest
2Lansdowne0.7875van panchayat land
Total 1.8675
Division 1. : Lansdowne
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Pauri Garhwal1.8675
Total1.8675
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
11.86750.3Eco 4
Total. 1.8675


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Melotus PhilippensisROHINI21414400
2Bombax CeibaSEMAL000001
3Eleagnus latifoliaKOKAT11213930
4Ficus rumphilKHABAR001002
5Cassia FistulaAMALTAS130201
6Syzigium CuminiJAMUN002503
7Terminalia BellaricaBAHEDA001000
8Calatropis giganteaMANDAR001000
9Boehmeria rugulosaGAINTHI000010
10Phoebe Attenuata Nees.SAIN000120
11Holoptelia integrifoliaKANJU000001
12Misc. SpeciesKUSUM000100
13BankeriBANKULI004200
14Shorea RobustaSAL012232
15Misc. SpeciesMALAW001000
Total 4 3039 269 10
Sub Total (No of Trees.) 118


5. Working plan prescription for the forest land proposed for diversion : The said area has been kept under the working plan, protection and improvement minutes
6. Brief note on vulnerability of the forest area to erosion : At present the proposed site dose't seen to be vulnerable to soil erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.2
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Panthera pardus, Axis axis, Sus scrofa, Muntiacus muntjak and several bird species etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : Yes
  Details and comments on the impact of Project on such areas : Iit is a part of Shvalik Elephant Reserve and also part of buffer zone of Rajaji tiger reserve. This area is elephant abundant area, the construction of road in the area may lead to increased man- animal conflict.so Elephant proof wall & elephant proof trenches proposed to control human-wildlife conflict in the area.
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : Yes
  Details and comments on the impact of Project on such areas : Iit is a part of Shvalik Elephant Reserve and also part of buffer zone of Rajaji tiger reserve. This area is elephant abundant area, the construction of road in the area may lead to increased man- animal conflict.so Elephant proof wall & elephant proof trenches proposed to control human-wildlife conflict in the area.
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : No
13. Details of compensatory afforestation scheme
(i). Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no District Name VillageArea(in ha.)khasraKML filePresent Owner file
1Pauri GarhwalUTIRCHHA3.3754336
(ii). Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iii). Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A: (iv). Copy of CA scheme details: (iv). Copy of CA scheme details: NA
Patch wise details for Degraded Area (To be earmarked by DFO)

Additional information Details
S. No. DocumentsRemarks
1 wild life metigation plan.pdf
2 suitability certificate for CA.pdf
3 Details of trees.
4 Certificate of Non -availability of alternative land and minimum demand for forest land.
5 Certificate of not being a part of National park and Wildlife sanctuary.
6 ariel distance certificate
7 land schedule ( civil forest)
8 Certificate of not being a place of Religious/mythical/historical importance.
9 Land schedule
10 Details of length and width of land
11 site inspection report.pdf
12 NPV Calculation
13 CA Suitability Certificate
14 Bar Chart
15 Revised wild life metigation plan.pdf

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Pauri Garhwal532900385094.21597.984851935.830/06/20201587.7076 710.51
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
LansdowneShivalikDFOYesOne12/04/2022
 ShivalikCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
LansdowneShivalikDFO RecommendedThe road constriction, as informed by user agency, is needed for last mile connectivity, The concerned path is at periphery and is devoid of dense vegetation hence recommended in in public interest.
ShivalikCF Recommended Yes
Nodal Officer RecommendedAs per file attached
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
UttarakhandState SecretaryRecommended01/07/2022as per file attached State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
DehradunRegional Office8B/UCP/06/49/2022/FC30/12/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UK/ROAD/152108/2022ROAD15210820224132,927,720.452,927,720.002023-06-06527148575Union Bank Of IndiaUnion Bank Of India (Challan)NANA
FP/UK/ROAD/152108/2022ROAD15210820224132,927,720.452,927,720.002023-08-11527148575Union Bank Of IndiaUnion Bank Of India (Challan)2023-06-012023-06-05
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 3.735   (iii). No. of Maintenance years: 8   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)3.735
  Status of CA Land so identified : Non Forest Area   Site Name : Village-UTIRCHHA   Location Details : Village-UTIRCHHA   Uploaded GPS File :   Uploaded Scanned copy of Map :   Whether land Mutated or not : No
Status of CA Land so identified
District Name. Name of Tehsil.
Pauri GarhwalKotdwara
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UK/ROAD/152108/202229 Aug 2024No DataAs per mutation details
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/UK/ROAD/152108/202229 Aug 2024
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UK/ROAD/152108/2022as per letter attached29 Aug 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UK/ROAD/152108/2022Approved In-PrincipleNo Data