PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
UK-026/2022
1.
Location of the project/Scheme :
Uttarakhand
(i)
State / Union Territory :
Uttarakhand
(ii)
District :
Bageshwar
(iii)
Forest Division :
Bageshwar
 (iv)
Area of forest land proposed for diversion (in ha.) :
22.112
 (v)
Category of the Proposal:
Road
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Bageshwar
9.757
Reserved Forest
2
Bageshwar
2.632
Civil Soyam land
3
Bageshwar
9.723
Village Forest
Total
22.112
Division 1. : Bageshwar
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Bageshwar
22.112
Total
22.112
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
22.112
0.4
Eco 5
Total.
22.112
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Pinus roxburghii
Chir
1201
1691
2414
992
216
78
2
Quercus leucotricophora
Baaz
0
02
0
0
0
0
3
Toona ciliata
Toon
0
0
0
2
0
0
Total
1201
1693
2414
994
216
78
Sub Total (No of Trees.)
6596
5.
Working plan prescription for the forest land proposed for diversion :
Comptt no. Sarna2b, working circle Protection, quality class - , Comptt no. Sarna 3, working circle Chir T, quality class - II/III, Comptt no. Sarna4, working circle Protection, quality class -, Comptt no. Sarna 1, working circle Protection, quality class -, Comptt no. Jhirauli 1, 2,3 working circle -Chir T, quality class III, Comptt no. Jhirauli 4, working circle Chir T, quality class - II/III, Comptt no. Binsar n 32, working circle Chir n, quality class -III.
6.
Brief note on vulnerability of the forest area to erosion :
the area is not prone to soil erosion.
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Monkey, Leopard, Indian fox, barking dear Jackal.
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
(i).
Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no
District Name
Village
Area(in ha.)
khasra
KML file
Present Owner file
1
Bageshwar
Haldwani com 02,pesiya com 01,pandrapali01,paldi08
44.224
Haldwani com 02,pesiya com 01,pandrapali01,paldi08
(ii).
Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iii).
Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A:
(iv).
Copy of CA scheme details:
(iv).
Copy of CA scheme details:
NA
Patch wise details for Degraded Area (To be earmarked by DFO)
Patch Wise Details
S.no
Division Name
Patch No.
Area(in ha.)
Name of PF/RF
Range
Village Name
Survey No.
Compartment No./any identification No.
KML file of patch
1
Bageshwar
1
10
RF
Dharamgarh
Haldwani 02
151113
02
2
Bageshwar
2
6.224
RF
Dharamgarh
Paisiya 01
151113
01
3
Bageshwar
3
13.00
RF
Bageshwar
Palari 08
151113
08
4
Bageshwar
4
15.00
RF
Bageshwar
Pandarpali 01
151113
01
(i).
Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(ii).
Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A:
(iii).
Copy of CA scheme details:
div>
(iv).
Total Financial Outlay for C.A:
180.43038
(v).
Whether the land identified by User Agency is suitable for CA and from managementpoint of view?:
Yes
(vi).
Copy of certificate regarding suitability of land identified for CA and from management point of view:
(vii).
Copy of detailed CA scheme including species to be planted,implementing agency,time schedule,cost structure etc.:
Additional information Details
S. No.
Documents
Remarks
1
CA suitability certificate
2
n.p.v
3
Land schedule
4
tree list
5
sir report
6
CA DSS Report.
7
CA scheme.
8
CA AREA SIR Report
9
BAR CHAT
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Bageshwar
231000
107400
842.58765
404
1453.2083
04/05/2022
1356
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Bageshwar
North Kumaun
DFO
Yes
One
03/03/2022
North Kumaun
CF
Yes
One
10/05/2022
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Bageshwar
North Kumaun
DFO
Recommended
This proposal will benefited to 5108 population of 1116 families
North Kumaun
CF
Recommended
This proposal will benefited to 5108 population of 1116 families
Yes
Nodal Officer
Recommended
As per file attached
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Uttarakhand
State Secretary
Recommended
06/10/2022
as per file attached
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Dehradun
Regional Office
8B/UCP/06/73/2022/FC
06/07/2023
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/UK/ROAD/151113/2022
ROAD1511132022401
48,434,832.00
48,434,832.00
2023-09-18
167663
Union Bank Of India
NEFT/RTGS (Challan)
2023-08-18
2023-08-19
FP/UK/ROAD/151113/2022
ROAD1511132022223
64,240,699.00
Union Bank Of India
NEFT/RTGS (Challan)
2024-10-26
2024-10-29
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
44.224
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
44.224
Status of CA Land so identified :
Forest Area
Site Name :
bageswer ranj
Location Details :
bageswer ranj
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
haldwani 2 pesiya 1 pandrapali 1 paldi 8
RF
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/UK/ROAD/151113/2022
20 Dec 2023
No Data
As per file attached
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/UK/ROAD/151113/2022
29 Oct 2024
Compliance Details Submitted by User Agency(old)
Proposal No.
Compliance Details submitted on(Date)
Reject Remarks
Reject Date
Uploaded Letter
FP/UK/ROAD/151113/2022
06 Jul 2024
EDS: As per IRO EDS
26 Oct 2024
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/UK/ROAD/151113/2022
As per Attachment
07 Jul 2024
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/UK/ROAD/151113/2022
Approved In-Principle
No Data