PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UK-0141/2017
1. Location of the project/Scheme : Uttarakhand
 (i) State / Union Territory : Uttarakhand  (ii) District : Tehri Garhwal  (iii) Forest Division : Mussoorie  (iv) Area of forest land proposed for diversion (in ha.) : 2.295  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Mussoorie2.205Reserved Forest
2Mussoorie0.09Civil Soyam land
Total 2.295
Division 1. : Mussoorie
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Tehri Garhwal2.295
Total2.295
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
12.2950.4Eco 6
Total. 2.295


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Pinus roxburghiiChir0226712
2Quercus leucotricophoraBanj0170002
3Rhododendron arboreumBurans01813131
4OthersAyanr084000
5OthersKafal065000
6Misc. SpeciesLod010000
Total 0 5224 710 15
Sub Total (No of Trees.) 108


5. Working plan prescription for the forest land proposed for diversion : Proposed area in Ringalgarh compartment no. 3 & 4 lies in conservation protection working circle.
6. Brief note on vulnerability of the forest area to erosion : The proposed forest land is not vulnerable to soil erosion therefor Geographically stable. The report of Senior Geologist is attach in proposal page no. 46 to 49
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.20
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Panthera pardus, Nemorhaedus goral, Muntiacus muntjak,Selenarctos thibetamus etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
(i). Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no District Name VillageArea(in ha.)khasraKML filePresent Owner file
1Tehri Garhwalringalgarh5250,268,299,817,818
(ii). Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iii). Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A: (iv). Copy of CA scheme details: (iv). Copy of CA scheme details: NA
Additional information Details
S. No. DocumentsRemarks
1 Part-II by DCF With Recommendation by DCF
2 Geo refrence Map CA
3 Part-I BY User Agency
4 Aeirl Distance from protected area
5 Online Part-II
6 ANR Site Map
7 ANR Estimate
8 MOU/Agreement between present owner and user agency & Non encumbrance
9 User Agency Letter No. 1677/dated 2-11-2017
10 Digital Map 1:50000 scale for CA
11 UA Letter
12 Proof Letter of Ringalgarh to Darak MR
13 Muck Disposal
14 Reived Etimate CA
15 Reived NPV certificate
16 Utility certificate CA
17 Authority Letter by UA
18 Justification authenticated by DFO
19 Bar Chart
20 Part-V
21 UA EDS Letter 23-9-2019
22 UA Letter
23 Ringalgarh-Darak MR KML File
24 District wise aera details Ringalgarh-Darak MR
25 EDS Letter by User agency Rringalgarh-Darak MR

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Tehri Garhwal442100405800986.007398236.961231/07/2019213.750
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
MussoorieYamunaDFOYesOne18/11/2017
 YamunaCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
MussoorieYamunaDFO RecommendedTo establish motor road connectivity to Ringalgarh to village Darak.Site inspection was done on 18-11-2017.
YamunaCF RecommendedProposal is recommened.Yes
Nodal Officer RecommendedAs per file attached
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
UttarakhandState SecretaryRecommended10/09/2018 as per file attached State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
DehradunRegional Office8B/UCP/06/102/2018/FC07/02/2020
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UK/ROAD/13390/2015ROAD1339020157463,744,535.003,744,535.002020-11-124807Corporation BankCorporation Bank (Challan)2020-06-182020-06-28
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 2.259   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)2.259
  Status of CA Land so identified : Forest Area   Site Name : Ringalgad-Dadak   Location Details : Dadak   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Raipur Range Forest Division MassoorieRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UK/ROAD/13390/201531 May 2022No DataAs per file attached
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/UK/ROAD/13390/201526 Apr 2024
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/UK/ROAD/13390/201513 Sep 2022EDS: State Govt. may attend the following shortcomings as per the attachment here 10 Oct 2022
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UK/ROAD/13390/201522 Sep 2022
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UK/ROAD/13390/201518 Nov 2024APPROVED