PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UK-0584/2015
1. Location of the project/Scheme : Uttarakhand
 (i) State / Union Territory : Uttarakhand  (ii) District : Bageshwar  (iii) Forest Division : Bageshwar  (iv) Area of forest land proposed for diversion (in ha.) : 6.287  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Bageshwar2.362Village Forest
2Bageshwar3.925Revenue Forest
Total 6.287
Division 1. : Bageshwar
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Bageshwar6.287
Total6.287
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
16.2870.4Eco 5
Total. 6.287


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Pinus roxburghiichir027795737132
2Alnus Nepalensisuttish030000
Total 0 28095 7371 32
Sub Total (No of Trees.) 551


5. Working plan prescription for the forest land proposed for diversion : no
6. Brief note on vulnerability of the forest area to erosion : the area is not prone to soil erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.300
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : wildlife presence is rare in the proposed land to be diverted
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
(i). Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no District Name VillageArea(in ha.)khasraKML filePresent Owner file
1Bageshwarbadiyakot civil12.574110
(ii). Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iii). Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A: (iv). Copy of CA scheme details: (iv). Copy of CA scheme details: NA
Additional information Details
S. No. DocumentsRemarks
1 CA suitability certificate for kapkot pindari Galeshicar to Kafalikmera motor road.
2 encumberem certificate for kapkot pindari Galeshicar to Kafalikmera motor road.
3 npv details for kapkot pindari Galeshicar to Kafalikmera motor road.
4 land schedule for kapkot pindari Galeshicar to Kafalikmera motor road.
5 CA scheme for kapkot pindari Galeshicar to Kafalikmera motor road.
6 Revise Site inspection report.

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Bageshwar231000107400640.39393571493.208413/08/20151081.006284.272
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
BageshwarNorth KumaunDFOYesOne20/07/2015
 North KumaunCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
BageshwarNorth KumaunDFO Recommended
North KumaunCF RecommendedThis proposal under PMGSY is in Public Interest. As per Proposal a families 150 of 1 villages will be benefited. Hence recommendedYes
Nodal Officer RecommendedAs per file attached
quetiapin ritalin quetiapin und valdoxan quetiapin wirkstoff
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
UttarakhandState SecretaryRecommended13/12/2016 as per file attached State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
DehradunRegional Office8B/UCP/06/252/2016/FC11/10/2019
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UK/ROAD/13065/2015ROAD1306520150489,158,559.009,158,559.002019-11-14ICICR52019111400641988Corporation BankNEFT/RTGS (Challan)2019-10-222019-10-25
FP/UK/ROAD/13065/2015ROAD1306520159562,815,633.002024-12-19
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 12.574   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)12.574
  Status of CA Land so identified : Non Forest Area   Site Name : KAPKOT PINDARI GLACIAR KM 11 TO KAFLIKAMERA   Location Details : BADIYAKOT CIVIL   Uploaded GPS File :   Uploaded Scanned copy of Map :   Mutation Status : Mutated
Mutation Status
Circle Name. Name of Division. Name of Range. Mutation Order No. Mutation Date How Much Area of Mutated Land Received Mutation Letter
North KumaunBageshwarKapkot501/26-02VAN/2019-2022 Feb 202012.574No Data
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UK/ROAD/13065/201501 Sep 2020No Dataas per upload-ed detail
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/UK/ROAD/13065/201508 Jul 2024EDS: As per instruction recvd. form IRO25 Nov 2024
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UK/ROAD/13065/2015As per Attachment19 Jul 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UK/ROAD/13065/2015Approved In-PrincipleNo Data