PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
UK-0253/2016
1.
Location of the project/Scheme :
Uttarakhand
(i)
State / Union Territory :
Uttarakhand
(ii)
District :
Dehradun
(iii)
Forest Division :
Dehradun
 (iv)
Area of forest land proposed for diversion (in ha.) :
23.75
 (v)
Category of the Proposal:
Mining
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Dehradun
23.75
Reserved Forest
Total
23.75
Division 1. : Dehradun
3.
District wise area to be diverted in the division
S. No.
District
Area(in ha.)
NIL
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
23.75
0.1
Eco 4
Total.
23.75
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
5.
Working plan prescription for the forest land proposed for diversion :
Working plan's Chapter VII "Soil and water conservation working circle" para 7.21 : Removal of Reverbed material (RBM) from River/Raus : The removal of RBM will be done either by the forest department itself or through forest development corporation. General guide line for RBM collection is given as follows : 1. Removal operation will be done by mannual means i.e. hand picking 2. Removal of RBM will be done from 1 October to 15 june. Removal oprations will not be carried out in monsson season under any circumstaces. 3. Removal of RBM should be restricted to the middle 50 percent of the river/rau. No removal should be done in the twenty five percent of both the banks. The basic aim is to stream line the terrential flow of water. 4. No mining operations will be done during removal of RBM. only collection from the river bed is allowed. 5. Adequate soil conservation measures will be taken up in the affected banks. preference of use of RBM will be given to construct these mechanical structures. 6. Removal of RBM should not be done in river/rau having less than 25 meter wildth. 7. Removal of RBM will be done under overall supervision of the DFO/Range officer. range officer will assess/estimate the quantity of RBM to be removed every year by 15th september. 8. Range Officer will also clearly demarcate the area from which RBM will be removed before removed before removal operation is allowed. 9. All the personnel engaged in the work will be registered at the range level. I will be ensured by him that the RBM collection is being done by engaging personnel from local community ony. Help of these people will be taken during fire season. 10. Removal of RBM by the local people for their personal use should be allowed as per their concessions & rights.
6.
Brief note on vulnerability of the forest area to erosion :
not applicable
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0.00
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Monkeys, Langoors, wild pigs, tigers, leopards etc.
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
100.32
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
47.50
Saura
Thano
Saura block
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
FRA Proceedings
2
Safety zone map for proposed mining site
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Dehradun
308800
211691
21268.15
471
6465.57
12/08/2016
4096.82
768.59
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Dehradun
Shivalik
DFO
Yes
One
20/07/2016
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Dehradun
Shivalik
DFO
Recommended
Recommended in public interests.
Shivalik
CF
Recommended
Recommended
Yes
Nodal Officer
Recommended
as per file attached
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Uttarakhand
State Secretary
Recommended
21/07/2016
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Dehradun
Regional Office
8B/UCP/05/166/2016
18/11/2016
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/UK/MIN/20542/2016
MIN205422016081
20,738,395.00
S86551593
Union Bank Of India
NEFT/RTGS (Challan)
2016-12-16
2016-12-19
FP/UK/MIN/20542/2016
MIN205422016081
20,738,395.00
S86551593
Union Bank Of India
NEFT/RTGS (Challan)
2016-12-16
2016-12-19
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
47.5
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
47.5
Status of CA Land so identified :
Forest Area
Site Name :
Saura Block, Thano Range, Dehradun forest division
Location Details :
Saura Block, Thano Range, Dehradun
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
Dehradun Forest Division
RF
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/UK/MIN/20542/2016
21 Jan 2017
No Data
As per fi;le attached
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/UK/MIN/20542/2016
30 Jan 2017
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/UK/MIN/20542/2016
16 Feb 2017
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/UK/MIN/20542/2016
08 Oct 2020
APPROVED
Print
Checklist for State Nodal Officer
×