PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UK-066/2018
1. Location of the project/Scheme : Uttarakhand
 (i) State / Union Territory : Uttarakhand  (ii) District : Dehradun  (iii) Forest Division : Dehradun  (iv) Area of forest land proposed for diversion (in ha.) : 3.69  (v)

Category of the Proposal: Irrigation
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Dehradun3.06Reserved Forest
2Dehradun0.63Revenue Forest
Total 3.69
Division 1. : Dehradun
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Dehradun3.69
Total3.69
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
13.690.3Eco 5
Total. 3.69


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

(iii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-2 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

(iv) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-4 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Tabubia AvalandaBahera001100
2Kukka NereduKukat002917710
3Caesaria tomentosaAmaltaas000200
4Acacia AuriculiformisKanju006401
5Bambusa arundinaceaSemal005510
6Pinus carribeaPeepal000001
7Magnolia GrandifoliaAam000001
8Symingtonia PopulneaJamun001000
9Toona ciliataTun001000
10Adatoda VasicaHaldu000100
11Acacia CatechuKhair000200
Total 0 043 328 13
Sub Total (No of Trees.) 96

5. Working plan prescription for the forest land proposed for diversion : Working plan para 7.21 : Removal of Reverbed material (RBM) from River/Raus : The removal of RBM will be done either by the forest department itself or through forest development corporation. General guide line for RBM collection is given as follows : 1. Removal operation will be done by mannual means i.e. hand picking 2. Removal of RBM will be done from 1 October to 15 june. Removal oprations will not be carried out in monsson season under any circumstaces. 3. Removal of RBM should be restricted to the middle 50 percent of the river/rau. No removal should be done in the twenty five percent of both the banks. The basic aim is to stream line the terrential flow of water. 4. No mining operations will be done during removal of RBM. only collection from the river bed is allowed. 5. Adequate soil conservation measures will be taken up in the affected banks. preference of use of RBM will be given to construct these mechanical structures. 6. Removal of RBM should not be done in river/rau having less than 25 meter wildth. 7. Removal of RBM will be done under overall supervision of the DFO/Range officer. range officer will assess/estimate the quantity of RBM to be removed every year by 15th september. 8. Range Officer will also clearly demarcate the area from which RBM will be removed before removed before removal operation is allowed. 9. All the personnel engaged in the work will be registered at the range level. I will be ensured by him that the RBM collection is being done by engaging personnel from local community ony. Help of these people will be taken during fire season. 10. Removal of RBM by the local people for their personal use should be allowed as per their concessions & rights.
6. Brief note on vulnerability of the forest area to erosion : The concerned area is plain
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 13.90
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Monkey, Languor. etc
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
(i). Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no District Name VillageArea(in ha.)khasraKML filePresent Owner file
1DehradunGadool7.38184 & 86ja
(ii). Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iii). Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A: (iv). Copy of CA scheme details: (iv). Copy of CA scheme details: NA
Additional information Details
S. No. DocumentsRemarks
1 Gorefrence map
2 digtal map
3 npv
4 Prativedan
5 Suitability cetificate
6 Rectified Recommendation

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Dehradun30880021169121426.295036632.5507/08/20184764.8022868.521
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
DehradunShivalikDFOYesOne03/03/2018
 ShivalikCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
DehradunShivalikDFO Recommendedpublick intrest Recoomendation
ShivalikCF RecommendedYes
Nodal Officer RecommendedAs per file attached
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
UttarakhandState SecretaryRecommended04/04/2018 as per file attached State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
DehradunRegional Office8B/UCP/02/45/2018/FC24/10/2018
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UK/IRRIG/29972/2017IRRIG2997220170524,480,878.004,480,878.002019-01-181060Corporation BankCorporation Bank (Challan)2018-12-142018-12-18
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 7.38   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)7.38
  Status of CA Land so identified : Non Forest Area   Site Name : Village-Gadool   Location Details : Tehsil-Rishikesh, District-Dehradun   Uploaded GPS File :   Uploaded Scanned copy of Map :   Mutation Status : Mutated
Mutation Status
Circle Name. Name of Division. Name of Range. Mutation Order No. Mutation Date How Much Area of Mutated Land Received Mutation Letter
ShivalikDehradunRishikesh656/12A-88(2017-20)DLRC01 Jan 20197.38
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UK/IRRIG/29972/201729 Jan 2019No DataAs per file attached
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/UK/IRRIG/29972/201701 Feb 2019
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UK/IRRIG/29972/201710 Mar 2019
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UK/IRRIG/29972/201707 Aug 2019APPROVED