PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : TN-088/2018
1. Location of the project/Scheme : Tamil Nadu
 (i) State / Union Territory : Tamil Nadu  (ii) District : Trichy  (iii) Forest Division : Trichy  (iv) Area of forest land proposed for diversion (in ha.) : 0.49884  (v)

Category of the Proposal: Drinking Water
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Trichy0.141596Reserved Forest
Total 0.141596
Division 1. : Trichy
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Trichy0.141596
Total0.141596
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.1415960.15Eco 3
Total. 0.141596


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL
5. Working plan prescription for the forest land proposed for diversion : 0.141596 ha
6. Brief note on vulnerability of the forest area to erosion : There is no Possible of Forest Area to erosion since pipe line is laid below 1.2 m of GL in existing Road path way
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Bison, Jackal
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
NO Data
(ii). Copy of CA scheme details: NA (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.: (V). Copy of NOC from Competent Authority:
Additional information Details
S. No. DocumentsRemarks
1 RF Notification.
2 District Gazette Notification
3 I recommended for the laying pipeline for 135 Rural Habitations in Vaiyampatty and Marungapuri union of Trichy district in the forest land as the area required by the user agency is minimum. since the user agency is laying the pipeline at a depth of 1.20m below the ground level it will not hinder the movement of wild animals and there is no possibility of altertnate alignment. Therefore i request that this proposal may kindly be considered in the interest of public to provide water supply.
4 Part II of Form A

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Trichy44038346307.199.111617.1711/02/20192.0015.17
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
TrichyTrichyDFOYesOne08/02/2019
 TrichyCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
TrichyTrichyDFO RecommendedThe project proposal is Executed by TWAD Board is very essential to provide drinking water facilities to 135 Rural Habitations in Vaiyampatty and Marungapuri Unions of Tiruchirappalli District. So The proposal is recommended under the forest conservation Act 1980
TrichyCF RecommendedSince the project is for providing drinking water to villages involves 0.141Ha R.F. where no tree felling is needed it can be accepted .Yes
Nodal Officer RecommendedRecommended for 0.141596 ha for drinking water purpose
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Tamil NaduState SecretaryRecommended04/03/2020 Recommeded for 20 years State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
ChennaiState GovernmentTN 088 201828/01/2020
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/TN/WATER/30065/2017WATER30065201777788,639.0088,639.002020-03-1793132461Corporation BankNEFT/RTGS (Challan)2020-03-042020-03-16
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 0.141596   (iii). No. of Maintenance years: 20   (iv). Total No. of Patches/Parcel: 5
  No. of patches : 2
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
2Block(Polygon)0.036
  Status of CA Land so identified : Forest Area   Site Name : Puthanatham Beat of Kalpatti Section   Location Details : Boundary Stone :18 opposite to EB Sub station Puthanatham west direction to East Direction for 600m length and 0.060m Width   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Puthanatham RFRF
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)0.023
  Status of CA Land so identified : Forest Area   Site Name : Valanadu Beat of Manapparai Section   Location Details : Near BoundaryStone No.23 for 383.9 m length and 0.60m width   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Kodumpapatty RFRF
  No. of patches : 3
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
3Block(Polygon)0.02244
  Status of CA Land so identified : Forest Area   Site Name : Kanjanaickenpatti Beat of Marungapuri Section   Location Details : Karaipatty to Kanjanaickenpatty Road with SF No.234, 122, 123   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Kayamalai RFRF
  No. of patches : 4
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
4Block(Polygon)0.03372
  Status of CA Land so identified : Forest Area   Site Name : Kallakampatty to Kanajanaickenpatti Road   Location Details : 562 length of 0.6m width near S.F.No.168, 167, 166-1, 163-1   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Kayamalai RFRF
  No. of patches : 5
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
5Block(Polygon)0.026436
  Status of CA Land so identified : Forest Area   Site Name : Nallur to Thuvarankurichi Road   Location Details : 446 length of 0.6m width near SF No.472, 473   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Thatchamalai RFRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/TN/WATER/30065/201711 Jun 2020No DataThe diversion of land (0.141596 ha ) is below one ha CA is not applicable in this case. Hence verified.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/TN/WATER/30065/201726 Jun 2020
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/TN/WATER/30065/2017Request for Stage II final approval.15 Jul 2021
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/TN/WATER/30065/201731 Aug 2022APPROVED