PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : TN-044/2021
1. Location of the project/Scheme : Tamil Nadu
 (i) State / Union Territory : Tamil Nadu  (ii) District : Ariyalur    (iii) Forest Division : Ariyalur  (iv) Area of forest land proposed for diversion (in ha.) : 0.3996  (v)

Category of the Proposal: Others
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Ariyalur0.3996Reserved Forest
Total 0.3996
Division 1. : Ariyalur
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Ariyalur0.3996
Total0.3996
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.39960.4Eco 4
Total. 0.3996


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL
5. Working plan prescription for the forest land proposed for diversion : Nil
6. Brief note on vulnerability of the forest area to erosion : Does not arise
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Peacock, Wild boar, Monitor lizard, Jackal, hare, Spotted deer
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 7.59
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.80Vangaram RFAriyalur1    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
NIL

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Ariyalur  1933389133.5700030/09/202100
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
AriyalurTrichyDFOYesOne08/04/2021
 TrichyCFYesOne13/10/2021
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
AriyalurTrichyDFO RecommendedThe Proposal is for diversion of 0.3996 Ha of Forest land for Electric connecting for 10 No. of rural villages in over exploited blocks of Sendurai Union in Ariyalur District. The proposed site were inspected on 08.04.2021 with Forest Range Officer, Ariyalur and EB officials, TANGEDCO, Sendurai The proposed linear alignment of Electricity line runs along the existing State highway 144 from R.S.Mathur to Chennai via Andimadam road in 4 stretches. 1. Ayyur to Idaiyakurichi road Muthukulam R.F – 1553 metre. State Highway 2. Ayyur to Vallam road Ayyur R.F – 2193 metre. Panchayat Road The actual requirement is calculated as follows Electricity line length in 2 stretches 3746 metre Required width 1.0668 metre 3996.23 m2 Area required 0.3996 Ha The proposed alignment passes along the existing State highway 144 which runs through the above Reserve Forests. There are no trees or natural vegetation along the proposed alignment. These Reserve Forests are already leased out to Tamil Nadu Forest Plantation Corporation for raising Eucalyptus tereticornis and Cashew from the year 1974. The user agency has submitted necessary under taking on Compensatory Afforestation expenditure, Net present value, Additional Net present value and Annual Lease Rent. Therefore there is no objection from Forestry and Wildlife point of view. Since the proposed electricity line is provide electricity to around 10 villages would be beneficial for the development of the village. Taking into consideration of the facts stated above, I recommended the user agency’s proposal for diversion of the Forest land in Muthukulam Reserved Forests and Ayyur Reserved Forests.
TrichyCF RecommendedThe proposal area for diversion is 0.3996 Ha in Muthukulam RF & Ayyur RF in Ariyalur Range of Ariyalur Forest Division.I have inspected the Muthukulam RF & Ayyur RF and the proposed area for erection of 11 KV feeder HT feeder HT EB posts from Ayyur to Vallam village via Idaiyakurichi across Muthukulam RF and Ayyur RF on 13.10.2021 along with the District Forest Officer, Ariyalur and E.B officials.Therefore there is no objection from Forestry and Wildlife point of view. Since the proposed electricity line will provide electricity to around 10 villages which would be beneficial for the development of the villages.Hence I recommend the proposal.Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Tamil NaduState SecretaryRecommended24/04/2022RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
ChennaiState GovernmentTN 044 202122/04/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/TN/Others/45417/2020OTHERS454172020745758,596.00758,596.0006/06/2022CNRB615683817638Union Bank Of IndiaNEFT/RTGS (Challan)01/06/202202/06/2022
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 0.3996   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Strip(Avenue)0.3996
  Status of CA Land so identified : Forest Area   Site Name : Ayyur RF & Muthukulam RF in Andimadam block of Ariyalur District   Location Details : Ayyur RF & Muthukulam RF in Andimadam block of Ariyalur District   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Ayyur RF & Muthukulam RFRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/TN/Others/45417/202014 Jul 2022No DataVerified with remarks of CA scheme will be carried out in degraded forest area over an extent of 0.80 ha in Vangaram RF
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/TN/Others/45417/202005 May 2025
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/TN/Others/45417/2020IN-PRINCIPLENo Data