PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : TG-021/2016
1. Location of the project/Scheme : Telangana
 (i) State / Union Territory : Telangana  (ii) District : Rangareddi  (iii) Forest Division : Hyderabad  (iv) Area of forest land proposed for diversion (in ha.) : 12.23  (v)

Category of the Proposal: Drinking Water
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Hyderabad12.23Reserved Forest
Total 12.23
Division 1. : Hyderabad
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Rangareddi12.23
Total12.23
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
112.230.3Eco 1
Total. 12.23


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Juvvi001210
2OthersChella000010
3OthersDharme071000
4OthersGumpana01391030
5OthersChenchu016510
6Sitaphal060000
7Somi0304100
8OthersNakkera010000
9OthersDershanam001000
10OthersToli Moligi020000
11OthersChirumanu01311000
12OthersTopeera001100
13Neredu010000
14Tammarind010100
15OthersKaraka021000
16OthersAnduga001010
17OthersPesara Ginne001000
18OthersPedda Tangedu010000
19Neem06426410
20OthersModuga013328400
21Ippa089360
22Eucalyptus067241100
23OthersSeema Tangedu0600000
24Kanuga(Bio-Diesel)0860000
25Neem020000
26Nemali Naara06813100
27OthersPachera010000
28Peltoform Pterocarpum0320000
29Rose Wood080000
30Sessoo0190010
31OthersBitlu0672000
32OthersNarlinga0180000
33OthersPalakodisha0336000
34Othersudugu0130000
35Pedamanu020000
36OthersUllintha040000
37OthersJaana020000
38OthersNuluva0130000
39OthersGulmohar021000
40OthersTella thumma0100000
41Sandra0130000
42Jeedi0261000
43Nalla Maddi041216310
44Nalla Maddi041216310
45OthersGumpena0110000
46OthersDrishanam001000
47OthersRela050000
48Teak0416200
49OthersChikareni07714100
50OthersTella poniki031100
51Othersolasris010000
52OthersPonna010000
53Thaani0110000
54OthersChennangi08615000
55OthersThiruman010000
56Booruga010000
57OthersMutha Tuniki020000
58OthersSoppera0227420
59OthersBarrenka001000
60OthersMorli0126000
61OthersTella poniki010000
62OthersGara080000
Total 0 1936230 5719 0
Sub Total (No of Trees.) 2242


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : As reported in the site inspection of DFO
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Nil
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
NO Data

Additional information Details
S. No. DocumentsRemarks
1 RoFR Certificate
2 Enumeration Details
3 Certificate

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Rangareddi74932170437.93217.4419005/01/2011032.21
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
HyderabadHyderabadDFOYesSix03/06/2016,08/06/2016,09/06/2016,10/06/2016,24/06/201625/06/2016
 HyderabadCFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
HyderabadHyderabadDFO RecommendedRecommended
HyderabadCF RecommendedRecommendedYes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
TelanganaState SecretaryRecommended19/11/2016 Recommended State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
HyderabadRegional Office4-TSC029/2016-CHN17/02/2017
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/TG/WATER/17606/2016WATER17606201668225,501,980.0025,501,980.0025/09/2018IDIBR52018092516988667Corporation BankNEFT/RTGS (Challan)19/09/201819/09/2018
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 12.23   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)12.23
  Status of CA Land so identified : Non Forest Area   Site Name : Peddamunigala, Thimmapuram CA site   Location Details : Sy.No.169 of Peddamunigala village, Sy.no. 39,147 of Thimmapuram Village of Neredigommu mandal of Nalgonda district   Uploaded GPS File :   Uploaded Scanned copy of Map :   Mutation Status : Mutated
Mutation Status
Circle Name. Name of Division. Name of Range. Mutation Order No. Mutation Date How Much Area of Mutated Land Received Mutation Letter
Amrabad-TRNagarjuna Sagar(WLM)WLM DevarakondaB/806/201701 Nov 201712.23
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/TG/WATER/17606/201615 May 2025No DataAccepted
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/TG/WATER/17606/2016Approved In-PrincipleNo Data