PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
TG-017/2018
1.
Location of the project/Scheme :
Telangana
(i)
State / Union Territory :
Telangana
(ii)
District :
Komarambheem Asifabad,Mancherial,Peddapalli
(iii)
Forest Division :
Asifabad,Bellampally,Peddapalli
 (iv)
Area of forest land proposed for diversion (in ha.) :
45.1009
 (v)
Category of the Proposal:
Transmission Line
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Asifabad
14.2842
Reserved Forest
2
Bellampally
13.7853
Reserved Forest
3
Peddapalli
17.0314
Reserved Forest
Total
45.1009
Division 1. : Asifabad
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Komarambheem Asifabad
14.2842
Total
14.2842
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
14.2842
0.1
Eco 3
Total.
14.2842
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
5.
Working plan prescription for the forest land proposed for diversion :
NIL
6.
Brief note on vulnerability of the forest area to erosion :
There will be no noticeable erosion
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Nil
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
Yes
Details and comments on the impact of Project on such areas :
An extent of area 3.1142 Ha is falling in Tiger Corridor area linking Kawal , Tadoba, Indravati Tiger Reserves
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
228.329
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
28.40
Kunchevelly RF
Rebbana
407
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
Mitigative Measures Asifabad
2
CA Abstract Asifabad
3
Certificates Asifabad
4
Scheme for Medicinal Plantation Asifabad
5
Unit Cost for CA Scheme Asifabad
6
RoFR Certificate Asifabad
7
Enumeration List Asifabad
Division 2. : Bellampally
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Mancherial
13.7853
Total
13.7853
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
13.7853
0.1
Eco 3
Total.
13.7853
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
5.
Working plan prescription for the forest land proposed for diversion :
NIL
6.
Brief note on vulnerability of the forest area to erosion :
There will be no noticeable erosion
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Nil
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
27.60
Bellampally RF
Bellampally
348
View file
Additional information Details
S. No.
Documents
Remarks
1
Enumeration Bellampally
2
Scheme for Medicinal Plantation Bellampally
3
Unit Cost for CA Scheme Bellampally
4
CA Scheme Bellampally
Division 3. : Peddapalli
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Peddapalli
17.0314
Total
17.0314
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
17.0314
0.2
Eco 3
Total.
17.0314
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
5.
Working plan prescription for the forest land proposed for diversion :
NIL
6.
Brief note on vulnerability of the forest area to erosion :
No Scope for soil erosion
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Nil
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
278.68345
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
20
Manthani RF
Manthani
282
View file
2
2
15
Manthani RF
Manthani
273
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
Enumeration Peddapally
2
Scheme for Medicinal Plantation Peddapally
3
Soil suitability Peddapally
4
CA abstract Peddapally
5
Certificates Peddapally
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Mancherial
1612800
716244
7774.933
14
9.3
20/12/2012
9.3
150.946
2
Komarambheem Asifabad
449404
244541
4781.218
25
115.5
15/07/2018
115.5
24.6
3
Peddapalli
215695
31922.569
975.153
19
704.071
20/12/2012
0
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Asifabad
Adilabad
DFO
Yes
One
04/07/2018
Bellampally
Kawal Tiger Reserve
DFO
Yes
One
15/09/2018
Peddapalli
karimnagar
DFO
Yes
One
10/05/2018
Adilabad
CF
No
No Data
karimnagar
CF
No
No Data
Kawal Tiger Reserve
CF
No
No Data
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Asifabad
Adilabad
DFO
Recommended
Recommended with conditions mentioned in the PArt II
Bellampally
Kawal Tiger Reserve
DFO
Recommended
Recommended
Peddapalli
karimnagar
DFO
Recommended
Recommended
Adilabad
CF
Recommended
Recommended
Yes
karimnagar
CF
Recommended
Recommended
Yes
Kawal Tiger Reserve
CF
Recommended
Recommended
Yes
Nodal Officer
Recommended
Recommended
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Telangana
State Secretary
Recommended
25/09/2018
Recommended
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Hyderabad
Regional Office
4-TSA133/2018-CHN
13/12/2018
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/TG/TRANS/27465/2017
TRANS274652017027
137,147,254.00
137,147,254.00
14/10/2021
SBIN028646958224
Union Bank Of India
NEFT/RTGS (Challan)
12/10/2021
12/10/2021
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
91
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
4
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
20
Status of CA Land so identified :
Forest Area
Site Name :
Compt.no.282, Manthani RF, Gopalapur beat, Khammampally section. Manthani Range
Location Details :
Compt.no.282, Manthani RF, Gopalapur beat, Khammampally section. Manthani Range
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
Manthani RF
RF
No. of patches :
2
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
2
Block(Polygon)
15
Status of CA Land so identified :
Forest Area
Site Name :
Compt.No.273, Manthani RF, Khansaipet beat , Eklaspur section, Manthani Range
Location Details :
Compt.No.273, Manthani RF, Khansaipet beat , Eklaspur section, Manthani Range
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
Manthani RF
RF
No. of patches :
3
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
3
Block(Polygon)
28.4
Status of CA Land so identified :
Forest Area
Site Name :
Compt.No.407, Kunchevelly RF, Girelly beat & section, Rebeena range
Location Details :
Compt.No.407, Kunchevelly RF, Girelly beat & section, Rebeena range
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
Kunchevelly RF
RF
No. of patches :
4
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
4
Block(Polygon)
27.6
Status of CA Land so identified :
Forest Area
Site Name :
Compt.No.348, Bellampally RF
Location Details :
Compt.No.348, Bellampally RF
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
Bellampally RF
RF
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/TG/TRANS/27465/2017
22 Apr 2022
No Data
Verified and accepted
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/TG/TRANS/27465/2017
22 Apr 2022
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/TG/TRANS/27465/2017
Compliance of Stage-I has been forwarded to State Government on dt.11.03.2022.
22 Apr 2022
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/TG/TRANS/27465/2017
20 May 2022
APPROVED
Print
Checklist for State Nodal Officer
×