PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : TG-01/2018
1. Location of the project/Scheme : Telangana
 (i) State / Union Territory : Telangana  (ii) District : Adilabad  (iii) Forest Division : Mancherial  (iv) Area of forest land proposed for diversion (in ha.) : 162.45  (v)

Category of the Proposal: Mining
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Mancherial162.45Reserved Forest
Total 162.45
Division 1. : Mancherial
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Adilabad162.45
Total162.45
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
1162.450.4Eco 3
Total. 162.45


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL
5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : No adverse impact takes place
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Nil
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 1811.12973
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
11100Indaram RFMancherialCompt.no. 691,693,698 of Indaram RF of Mancherial beat & section & Range    View file
22225Indaram RFMancherialCompt.no. 687,688,689,690 of Indaram RF of Venkatapuram beat & Mandamarri section & Mancherial Range    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 CA DFL Map1
2 CA Scheme
3 CA Scheme Abstract
4 RoFR Certificate
5 Unit Cost of CA scheme
6 Enumeration List Abstract
7 CA DFL Map
8 Soil Suitability Certificate
9 Revised CA scheme

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Adilabad123599.855005.64421.971281089.14130/09/201817.772224.830
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
MancherialKawal Tiger ReserveDFOYesOne12/04/2018
 Kawal Tiger ReserveCFYesOne28/02/2019
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
MancherialKawal Tiger ReserveDFO RecommendedRecommended with the following conditions. 1.M/s.SCCL is havening 2 ongoing open cast mining projects, namely SRP — I and RKP OC, besides 4 underground mines. These 2 mines will produce 829.31 Million tons of over burden dump. The SCCL is also having plan to open new mines namely Indaram OC which will produce about 382.000 Million tons of over burden in its life time. If over burden restoration is not simultaneous and as per scientific standards there is possibilities for damage to flora and fauna in adjoining fields besides moving if soil into adjacent water bodies due to soil erosion from these over burdens. It is essential that magnitude of such restoration shall be understood first then only monitoring of such works can be done by forest officials. Hence, it is essential to expose a team of forest officers at least 10 Officers to World s best practices being followed to restore over burden s etc., in coal mining like places in Hunter valley Australia / New Zealand the cost of which shall be borne by the User Agency. 2.The area equivalent to the diverted area to be developed in adjoining degraded forest land as a part of Forest Rejuvenation, as is being done elsewhere in Telangana state, in between Mancherial to Jaipur, by the User Agency in consultation with forest department.
Kawal Tiger ReserveCF RecommendedRecommended the project in Part III stating that this project involves providing employment opportunities to local people and overall development of the state.Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
TelanganaState SecretaryRecommended28/02/2019 REcommended State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
HyderabadHead Office8-06/2019-FC12/03/2021
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/TG/MIN/29918/2017MIN299182017756325,682,000.00325,682,000.0025/04/2022SBIN411479939285Union Bank Of IndiaNEFT/RTGS (Challan)21/04/202221/04/2022
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 325   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 2
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)100
  Status of CA Land so identified : Forest Area   Site Name : Compt.no. 691,693,698 of Indaram RF of Mancherial beat & section & Range   Location Details : Compt.no. 691,693,698 of Indaram RF of Mancherial beat & section & Range   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Indaram RFRF
  No. of patches : 2
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
2Block(Polygon)225
  Status of CA Land so identified : Forest Area   Site Name : Compt.no. 687,688,689,690 of Indaram RF of Venkatapuram beat & Mandamarri section & Mancherial Range   Location Details : Compt.no. 687,688,689,690 of Indaram RF of Venkatapuram beat & Mandamarri section & Mancherial Range   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Indaram RFRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/TG/MIN/29918/201724 Aug 2022No DataVerifed and accepted
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/TG/MIN/29918/201725 Oct 2023
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/TG/MIN/29918/201724 Aug 2022EDS: pls furnish EDS22 Aug 2023
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/TG/MIN/29918/2017Compliance report on Stage-I conditions has been forwarded to State Government on dt.05.08.202224 Aug 2022
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/TG/MIN/29918/201721 Dec 2023APPROVED