PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : TG-04/2018
1. Location of the project/Scheme : Telangana
 (i) State / Union Territory : Telangana  (ii) District : Adilabad  (iii) Forest Division : Bellampally  (iv) Area of forest land proposed for diversion (in ha.) : 18.083  (v)

Category of the Proposal: Irrigation
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Bellampally18.083Reserved Forest
Total 18.083
Division 1. : Bellampally
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Adilabad18.083
Total18.083
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
118.0830.3Eco 3
Total. 18.083


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersBuddadarimi410000
2OthersChinduga210000
3OthersModuga335919500
4OthersMorri100000
5OthersNallamaddi2410000
6OthersPalakodisha800000
7OthersRela200000
8OthersTuniki8610000
9OthersJuvvi000010
10OthersIppa210010
11OthersChennangi53440010
12OthersNarepa000020
Total 215 10819 55 0
Sub Total (No of Trees.) 352

(iii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-2 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

(iv) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-4 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : There will be no noticeable erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Nil
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): Yes
  Details of Protected Area and comments on the impact of Project on the ESZ : The proposed area is at distance of 6.64 km from Pranahitha Black Buck Sanctuary
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : Yes
  (a)Details of violation(s): Construction work of Canal
   (b) Period of Work done(year) : NIL
   (c) Area of forest land involved in violation (in ha.) : 13.829
S. No. Name of person responsible for violation Designation & Address of person responsible for violationAction taken against the person responsible for violation
1Irrigation departmentIrrigation departmentNA
12. Whether work in violation is still in progres(Yes/No) : No
13. Details of compensatory afforestation scheme
(i). Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no District Name VillageArea(in ha.)khasraKML filePresent Owner file
1AdilabadKammargoan village of Penchikalpet Mandal23.2816Sy.No.57
(ii). Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iii). Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A: (iv). Copy of CA scheme details: (iv). Copy of CA scheme details: NA
Additional information Details
S. No. DocumentsRemarks
1 Enumeration List
2 CA DFL Map
3 Penal CA Map
4 RoFR Certificate
5 R&R undertaking
6 Penal CA Scheme Unit Cost
7 CA site Inspection by FDO, Kagaznagar
8 Penal CA Scheme
9 CA Scheme Kagaznagar
10 CA site Inspection by DFO, Komarambheem Asifabad
11 CA Scheme Unit Cost of Kagaznagar
12 Ecumberance certificate from District Collector

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Adilabad16128007162447774.933149.320/12/20129.3150.946
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
BellampallyAdilabadDFOYesOne07/12/2017
 AdilabadCFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
BellampallyAdilabadDFO RecommendedThe proposed canal is used for the agriculture purpose and nearest villages of Vemanpally mandal may get benefited with the project. It is very essential to the tribals living in and around the forest area, who depended on the agriculture. Hence recommnended
AdilabadCF RecommendedRecommended that the UA shall provide drinking water outlets to the wildlife.Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
TelanganaState SecretaryRecommended01/05/2018 Recommended State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
HyderabadRegional Office4-TSB124/2018-CHN12/06/2018
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/TG/IRRIG/30173/2017IRRIG30173201744923,913,750.0023,913,750.0011/02/2019SBINR52019021100081666Corporation BankNEFT/RTGS (Challan)08/02/201908/02/2019
FP/TG/IRRIG/30173/2017IRRIG30173201754221,483,600.0021,483,600.0019/09/2020SBINR52020091900027886Corporation BankNEFT/RTGS (Challan)14/09/202014/09/2020
FP/TG/IRRIG/30173/2017IRRIG3017320177855,029,500.005,029,500.0027/09/2024SBINR52024092751113635Union Bank Of IndiaNEFT/RTGS (Challan)26/09/202426/09/2024
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 64.2816   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 3
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)23.2816
  Status of CA Land so identified : Non Forest Area   Site Name : Sy.No.57, kommargoan village, PenchikalpetMandal og Komarambhem Asifabad district   Location Details : Sy.No.57, kommargoan village, PenchikalpetMandal og Komarambhem Asifabad district   Uploaded GPS File :   Uploaded Scanned copy of Map :   Mutation Status : Mutated
Mutation Status
Circle Name. Name of Division. Name of Range. Mutation Order No. Mutation Date How Much Area of Mutated Land Received Mutation Letter
AdilabadKagaznagarBijjurB/13/201624 Feb 201923.2816
  No. of patches : 2
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
2Block(Polygon)28
  Status of CA Land so identified : Non Forest Area   Site Name : Compt.No.372, Jajjaravelly RF, Yellaram beat, Nennel Section, Kushnepally range, Bellampally division   Location Details : Compt.No.372, Jajjaravelly RF, Yellaram beat, Nennel Section, Kushnepally range, Bellampally division   Uploaded GPS File :   Uploaded Scanned copy of Map :   Mutation Status : Mutated
Mutation Status
Circle Name. Name of Division. Name of Range. Mutation Order No. Mutation Date How Much Area of Mutated Land Received Mutation Letter
0No Data
  No. of patches : 3
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
3Block(Polygon)13
  Status of CA Land so identified : Non Forest Area   Site Name : Compt.No.153, Kadamba RF, Kondapally south beat, Loadpally section, Penchikalpet range of Kagaznagar division   Location Details : Compt.No.153, Kadamba RF, Kondapally south beat, Loadpally section, Penchikalpet range of Kagaznagar division   Uploaded GPS File :   Uploaded Scanned copy of Map :   Mutation Status : Mutated
Mutation Status
Circle Name. Name of Division. Name of Range. Mutation Order No. Mutation Date How Much Area of Mutated Land Received Mutation Letter
0No Data
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/TG/IRRIG/30173/201723 May 2022No DataVerified and Accepted
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/TG/IRRIG/30173/201723 May 2022
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/TG/IRRIG/30173/2017Compliance conditions on Stage-I has been forwarded to State Government on dt.04.02.2022.23 May 2022
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/TG/IRRIG/30173/201714 Dec 2023APPROVED