PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : SK-08/2016
1. Location of the project/Scheme : Sikkim
 (i) State / Union Territory : Sikkim  (ii) District : Gyalshing,Namchi  (iii) Forest Division : West Territorial,South Territorial  (iv) Area of forest land proposed for diversion (in ha.) : 2.3415  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1South Territorial1.022Reserved Forest
Total 1.022
Division 1. : South Territorial
3. District wise area to be diverted in the division
S. No. DistrictArea(in ha.)
NIL
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
11.0220.25Eco 6
Total. 1.022


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Schima Wallichii ChoisChilawney032322136
2Albizia ProceraSirish030121
3OthersMahuwa0330020
4Bombax CeibaSimal060110
5OthersDhalney Kattus0180020
6OthersBepari0410700
7Rhus Spp.Bhalayo010000
Total 0 1343 3120 7
Sub Total (No of Trees.) 195


5. Working plan prescription for the forest land proposed for diversion : No
6. Brief note on vulnerability of the forest area to erosion : The proposed land for diversion does not form a part of any serious eroded areas
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.008
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : NA
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 797368.00
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
112.044Maneydara GorucharanNamthang0    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
NIL
Division 2. : West Territorial
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1West1.3195
2South1.022
Total2.3415
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
11.31950.3Eco 5
21.0220.25Eco 6
Total. 2.3415


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Albizzia proceraSiris040210
2Schima Wallichii ChoisChileuney032322206
3OthersBepari0410780
4OthersMalato000020
5OthersCheuwri000030
6Bombax CeibaSimal060110
7OthersDhalney Kattus0180020
Total 0 1013 3237 6
Sub Total (No of Trees.) 179


5. Working plan prescription for the forest land proposed for diversion : i) To improve the quality of crop through removal of fallen dead and decaying, hallow trees. ii) to conserve these forest with plantation in the degraded area with suitable indigenous species. iii) to improve the natural regeneration. iv) to prevent encroachment by extensively demarcating these forests with boundary pillars.
6. Brief note on vulnerability of the forest area to erosion : The Proposed land for diversion does not form a part of any seriously eroded areas except which is due to natural factors.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.008
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Barking deer(muntiacus muntjac), Wild pig(Sus scrofa), Fox, Civet cat (Vivera sp), Procupine, Monkey, Flying Squirrel, etc are the mammalian species usually found inhabiting these forests.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 2138324.00
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
112.639Sakyong GorucharanGeyzingNA    View file
222.044Maneydara GorucharanRavanglaNA    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
NIL

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Gyalshing116600.0086473.00136.6559271.1431/03/2013179.312.50
2Namchi75000.0041341.00395.620484608.63631/03/2011521.142.50
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
West TerritorialTerritorialDFOYesOne19/03/2016
South TerritorialTerritorialDFOYesOne29/04/2016
 TerritorialCFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
West TerritorialTerritorialDFO RecommendedRecommendation of DFO/DCF
South TerritorialTerritorialDFO RecommendedRecommendation of DFO South (T) Range
TerritorialCF RecommendedRecommendation of CFYes
Nodal Officer RecommendedRecommendation of Nodal; Officer
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
SikkimState SecretaryRecommended11/07/2016Recommendation of Secretary State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
KolkataRegional Office3-SK B 033/2016-SHI25/07/2016
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/SK/TRANS/18128/2016TRANS1812820166803,719,614.00S70927764Union Bank Of IndiaUBI Branch (Challan)2016-09-172016-09-17
FP/SK/TRANS/18128/2016TRANS1812820166803,719,614.00S70927764Union Bank Of IndiaUBI Branch (Challan)2016-09-172016-09-17
FP/SK/TRANS/18128/2016TRANS1812820166803,719,614.00S70927764Union Bank Of IndiaUBI Branch (Challan)2016-09-172016-09-17
FP/SK/TRANS/18128/2016TRANS1812820166803,719,614.00S70927764Union Bank Of IndiaUBI Branch (Challan)2016-09-172016-09-17
FP/SK/TRANS/18128/2016TRANS1812820166803,719,614.00S70927764Union Bank Of IndiaUBI Branch (Challan)2016-09-172016-09-17
FP/SK/TRANS/18128/2016TRANS1812820166803,719,614.00S70927764Union Bank Of IndiaUBI Branch (Challan)2016-09-172016-09-17
FP/SK/TRANS/18128/2016TRANS1812820166803,719,614.00S70927764Union Bank Of IndiaUBI Branch (Challan)2016-09-172016-09-17
FP/SK/TRANS/18128/2016TRANS1812820166803,719,614.00S70927764Union Bank Of IndiaUBI Branch (Challan)2016-09-172016-09-17
FP/SK/TRANS/18128/2016TRANS1812820166803,719,614.00S70927764Union Bank Of IndiaUBI Branch (Challan)2016-09-172016-09-17
FP/SK/TRANS/18128/2016TRANS1812820166803,719,614.00S70927764Union Bank Of IndiaUBI Branch (Challan)2016-09-172016-09-17
FP/SK/TRANS/18128/2016TRANS1812820166803,719,614.00S70927764Union Bank Of IndiaUBI Branch (Challan)2016-09-172016-09-17
FP/SK/TRANS/18128/2016TRANS1812820166803,719,614.00S70927764Union Bank Of IndiaUBI Branch (Challan)2016-09-172016-09-17
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/SK/TRANS/18128/2016Approved In-PrincipleNo Data