PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : SK-024/2022
1. Location of the project/Scheme : Sikkim
 (i) State / Union Territory : Sikkim  (ii) District : Gangtok  (iii) Forest Division : East Territorial  (iv) Area of forest land proposed for diversion (in ha.) : 0.11  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1East Territorial0.11Reserved Forest
Total 0.11
Division 1. : East Territorial
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Gangtok0.11
Total0.11
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.110.2Eco 5
Total. 0.11


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersMalata001100
2Schima Wallichii ChoisChilauney000001
Total 0 01 10 1
Sub Total (No of Trees.) 3


5. Working plan prescription for the forest land proposed for diversion : KML File and Toposheet MAP.
6. Brief note on vulnerability of the forest area to erosion : Being hilly terrain, the problem of soil ersion to some extent cannot be ignored.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.00
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : does not form the parts of any national parks, wildlife sanctuary, biosphere reserve, tiger reserve,elephant corridor etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 321267
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
111Bulbulay Gangtok0.00    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Site Inspection
2 NVP
3 Recommendation by DFO (T) gangtok
4 FRA Certificate.
5 Technical Sanction CA Scheme Certificate.
6 Cost of Cutting
7 Certificate for Degarded
8 Aerial Distance
9 Part II
10 Topsheet map
11 Certificate for Dwellers
12 Site Suitability
13 joint certificate for non Availability

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Gangtok9540061051993.331321565.7731/03/2013746.420.00
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
East TerritorialTerritorialDFOYesOne05/08/2022
 TerritorialCFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
East TerritorialTerritorialDFO RecommendedDiversion of 0.11 ha of forest land for laying of 66 KV Perbing to Sichey underground cable along with construction of protective step wall within Jhora reserve Road Reserve in Gangtok, Govt. of Sikkim is recommended for Forest Clearance under Section 2 of the Forest Conservation Act, 1980.
TerritorialCF RecommendedRecommendation of CF T for the diversion of 0.11 ha of forest land for laying of 66 KV Perbing to Sichey underground cable along with const. of protective step wall within Jhora Reserve and Road reserveYes
Nodal Officer RecommendedRecommendation of Nodal Officer FCA for the diversion of 0.11 ha of forest land for laying of 66 KV Perbing to Sichey underground cable along with const. of protective step wall within Jhora Reserve and Road reserve
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
SikkimState SecretaryRecommended10/01/2023Recommendation of Secretary for the diversion of 0.11 ha of forest land for laying of 66 KV Perbing to Sichey underground cable along with const. of protective step wall within Jhora Reserve and Road reserveState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
KolkataRegional OfficeIRO/KOL/SK/TRANS/155580/202217/01/2023
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/SK/TRANS/155580/2022TRANS1555802022297431,840.00431,840.0001/03/2023891618Union Bank Of IndiaNEFT/RTGS (Challan)15/02/202316/02/2023
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 1   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)1
  Status of CA Land so identified : Forest Area   Site Name : Bulbulay RF   Location Details : Bulbulay RF   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Bulbulay RFRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/SK/TRANS/155580/202205 Apr 2023No DataApproved and Verified.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/SK/TRANS/155580/202211 May 2023
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/SK/TRANS/155580/2022Compliance report forwarding letter along with undertaking has been uploaded on portal and forwarded to Secretary for Verification and Recommendation 11 May 2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/SK/TRANS/155580/202212 May 2023APPROVED