PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : SK-06/2021
1. Location of the project/Scheme : Sikkim
 (i) State / Union Territory : Sikkim  (ii) District : Gyalshing  (iii) Forest Division : West Territorial  (iv) Area of forest land proposed for diversion (in ha.) : 1.489  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1West Territorial1.489Khasmal-1.327 ha & River Reserve-0.162 ha
Total 1.489
Division 1. : West Territorial
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1West1.489
Total1.489
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
11.4890.3Eco 5
Total. 1.489


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Otherskatus (Patley)7100000
2OthersMalata200000
3Albizzia lebbeckSiris200000
4Otherschilaunay562031152
5OthersBhalayo1053000
6Othersmalata9357000
7Othersmawa113010100
8Castanopsis TribuloidesKatus020000
9Ficus ReligiosaPipal100000
10OthersBepari102511300
11Othersjamuna100000
12Spondias AxillarisLopsi000011
13OthersBhikimlo1060000
14Alnus NepalensisUttis7103000
15OthersChilauney200000
16Duabanga GrandifloraLampatey321200
Total 195 13538 176 3
Sub Total (No of Trees.) 394


5. Working plan prescription for the forest land proposed for diversion : KML file and topo-sheet for CA & proposed area has been prepared by Working plan cell.
6. Brief note on vulnerability of the forest area to erosion : The proposed land for diversion does not form a part of any seriously eroded areas except which is due to natural factors.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.00
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : NIL
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 15,58,487.00
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
113Semaybong KhasTashiding00    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 CS certificate
2 Site suitability Certificate
3 Site inspection report
4 Cost of cutting and felling
5 NPV
6 Part II
7 FRA Certificate
8 Dwarf species

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Gyalshing11660086473169.06562247.75931/03/2020195.6057.782
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
West TerritorialTerritorialDFOYesOne25/03/2021
 TerritorialCFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
West TerritorialTerritorialDFO Recommended Recommendation of DFO T for the diversion of 1.489 ha 66kV S/C Relechu Pelling Tr. Line under Comprehensive Scheme for Strengthening of Transmission and Distribution System in West District by Energy and Power Deptt., Govt. of Sikkim
TerritorialCF RecommendedRecommendation of CF T for the diversion of 1.489 ha 66kV S/C Relechu Pelling Tr. Line under Comprehensive Scheme for Strengthening of Transmission and Distribution System in West District by Energy and Power Deptt., Govt. of SikkimYes
Nodal Officer RecommendedRecommendation of Nodal Officer FCA for the diversion of 1.489 ha 66kV S/C Relechu Pelling Tr. Line under Comprehensive Scheme for Strengthening of Transmission and Distribution System in West District by Energy and Power Deptt., Govt. of Sikkim
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
SikkimState SecretaryRecommended07/07/2021Recommendation of Secretary for the diversion of 1.489 ha 66kV S/C Relechu Pelling Tr. Line under Comprehensive Scheme for Strengthening of Transmission and Distribution System in West District by Energy and Power Deptt., Govt. of SikkimState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
KolkataRegional OfficeSK/TRANS-45/2021/FC27/09/2021
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/SK/TRANS/117830/2020TRANS11783020201762,985,629.002,985,629.0022/10/2021SBIN029448164385Union Bank Of IndiaNEFT/RTGS (Challan)19/10/202119/10/2021
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 3   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)3
  Status of CA Land so identified : Forest Area   Site Name : Semaybong Khasmal, Tashiding Range   Location Details : Semaybong   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Semaybong KhasOther Forest Land
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/SK/TRANS/117830/202030 Nov 2021No Dataverified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/SK/TRANS/117830/202001 Dec 2021
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/SK/TRANS/117830/2020Compliance Report 01 Dec 2021
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/SK/TRANS/117830/202018 Jan 2022APPROVED