PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
SK-036/2019
1.
Location of the project/Scheme :
Sikkim
(i)
State / Union Territory :
Sikkim
(ii)
District :
Mangan
(iii)
Forest Division :
North Territorial
 (iv)
Area of forest land proposed for diversion (in ha.) :
2
 (v)
Category of the Proposal:
Others
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
North Territorial
2
Khasmal
Total
2
Division 1. : North Territorial
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
North
2
Total
2
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
2
0.01
Eco 6
Total.
2
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Alnus Nepalensis
Uttis
30
0
30
20
0
0
2
Others
Malato
26
0
0
0
0
0
Total
56
0
30
20
0
0
Sub Total (No of Trees.)
106
5.
Working plan prescription for the forest land proposed for diversion :
Toposheet map for the proposed site and CA site has been generated by Working Plan cell
6.
Brief note on vulnerability of the forest area to erosion :
Being hilly terrain the problem of soil erosion cannot be ignored
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0.00
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
NA
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
1532397
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
4
Ringdang Khasmal
Mangan
00
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
Aerial distance
2
Cost of Cutting
3
Annexure II
4
Site Suitability
5
Degraded Forest Land
6
Site Inspection
7
Compensatory Afforestation
8
Aerial Distance Certificate
9
Joint Certificate
10
Compensatory Afforestation Map
11
Net Present Value
12
Part II
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Mangan
116600
86473
748.906
59
1950.334
31/03/2011
938.795
69.262
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
North Territorial
Territorial
DFO
Yes
One
20/01/2021
Territorial
CF
No
No Data
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
North Territorial
Territorial
DFO
Recommended
Diversion of 2.00 ha of forest land for Garbage Management Plant under Mangan Territorial Range by Urban Development Department, Govt. of Sikkim
Territorial
CF
Recommended
Recommendation of CF T for the diversion of 2 ha of forest land for garbage Management plant,Ringding, North sikkim by UDHD, GoS
Yes
Nodal Officer
Recommended
Recommendation of Nodal Officer FCA for the diversion of 2 ha of forest land for garbage Management plant,Ringding, North sikkim by UDHD, GoS
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Sikkim
State Secretary
Recommended
14/09/2021
Recommendation of Secreatary for the diversion of 2 ha of forest land for garbage Management plant,Ringding, North sikkim by UDHD, GoS
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Kolkata
Regional Office
SK-UDHD-70/2021/FC
29/11/2021
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/SK/Others/41900/2019
OTHERS419002019821
2,930,397.00
2,930,400.00
2023-03-02
YESB30601122290
Union Bank Of India
NEFT/RTGS (Challan)
NA
NA
FP/SK/Others/41900/2019
OTHERS419002019748
740,940.00
740,940.00
2024-12-24
YESBR52024122454255316
Union Bank Of India
NEFT/RTGS (Challan)
2024-12-24
2024-12-24
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
4
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
4
Status of CA Land so identified :
Forest Area
Site Name :
Ringdang Khasmal, Mangan T Division
Location Details :
Ringdang Khasmal, Mangan T Division
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
Ringdang Khasmal, Mangan T Division
Others
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/SK/Others/41900/2019
20 Jan 2025
No Data
VErified and approved
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/SK/Others/41900/2019
20 Jan 2025
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/SK/Others/41900/2019
Compliance report with undertaking certificate has been forwarded to next level for further approval.
20 Jan 2025
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/SK/Others/41900/2019
29 Jan 2025
APPROVED
Print
Checklist for State Nodal Officer
×