PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : SK-05/2022
1. Location of the project/Scheme : Sikkim
 (i) State / Union Territory : Sikkim  (ii) District : Mangan  (iii) Forest Division : North Territorial  (iv) Area of forest land proposed for diversion (in ha.) : 0.01  (v)

Category of the Proposal: Others
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1North Territorial0.01Reserved Forest
Total 0.01
Division 1. : North Territorial
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Mangan0.01
Total0.01
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.010Eco 6
Total. 0.01


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersPrimula200000000
Total 2000 00 00 0
Sub Total (No of Trees.) 2000


5. Working plan prescription for the forest land proposed for diversion : Toposheet map for the proposed site and CA Site has been generated by Working plan cell.
6. Brief note on vulnerability of the forest area to erosion : Being hilly terrain the problem of soil erosion cannot be ignored
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.00
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : NA
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 478955
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.01Lachung RFLachung0    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Cost of cutting
2 Site Inspection Report
3 Aerial Distance Certificate and map
4 Compensatory Afforestation Map
5 Degraded Forest Land
6 FRA ( Annexure II)
7 Joint Certificate
8 Recommendation
9 Site Suitability
10 Net Present Value
11 Compensatory Afforestation
12 Part II

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Mangan422600394020885.371072110.2331/03/20202105.9374.28
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
North TerritorialTerritorialDFOYesOne19/10/2022
 TerritorialCFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
North TerritorialTerritorialDFO RecommendedDiversion of 0.01ha of Forest land for Installation of Hydrological and Metrological Station under National Hydrological Project at Yumthang, Lachung T Range in Mangan District of Sikkim by Water Resource Department, Government of Sikkim
TerritorialCF RecommendedRecommendation of CF T for the diversion of 0.01ha of Forest land for Installation of Hydrological and Metrological Station under National Hydrological Project at Yumthang, Lachung T Range in Mangan District of Sikkim by Water Resource Department, Government of SikkimYes
Nodal Officer RecommendedRecommendation of Nodal Officer FCA for the diversion of 0.01 ha of forest land for Installation of Hydrological & Meteorological Station under National Hydrological Project at Yumthang, Lachung T North Sikkim by Water Resources Deptt. GoS
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
SikkimState SecretaryRecommended10/04/2023Recommendation of Secretary for the diversion of 0.01 ha of forest land for Installation of Hydrological & Meteorological Station under National Hydrological Project at Yumthang, Lachung T North Sikkim by Water Resources Deptt. GoSState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
KolkataRegional OfficeIRO/KOL/SK/Others/151783/202217/04/2023
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/SK/Others/151783/2022OTHERS1517832022218489,650.00489,650.0011/09/2023147267Union Bank Of IndiaNEFT/RTGS (Challan)04/09/202304/09/2023
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 1   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)1
  Status of CA Land so identified : Forest Area   Site Name : Lachung RF, Mangan Division   Location Details : Lachung RF, Mangan Division   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Lachung RF, Mangan DivisionRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/SK/Others/151783/202201 Dec 2023No DataVerified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/SK/Others/151783/202201 Dec 2023
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/SK/Others/151783/2022Compliance report with undertaking and forwarding letter 01 Dec 2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/SK/Others/151783/202215 Dec 2023APPROVED