PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : RJ-064/2019
1. Location of the project/Scheme : Rajasthan
 (i) State / Union Territory : Rajasthan  (ii) District : Sikar  (iii) Forest Division : Sikar Territorial  (iv) Area of forest land proposed for diversion (in ha.) : 5.5401  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Sikar Territorial5.5401Protected Forest
Total 5.5401
Division 1. : Sikar Territorial
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Sikar5.5401
Total5.5401
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
15.54010.2Eco 3
Total. 5.5401


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersAcacia tortlis773071142651
2Albezzia LabbeckCirrus020000
3OthersKaranj011000
4OthersBer and other Shrubs species030000
5EucalyptusSafeda001100
6OthersKumtha0190000
7Ailanthus excelsaArdu001300
8Tectona GrandisTeak020000
9Acacia NiloticaDesi Babool002000
10Terminalia CatappaBadam001000
11Azadirachta IndicaNeem0100000
12Prosophis JulifloraVideshi Babool002000
Total 77 344122 305 1
Sub Total (No of Trees.) 579


5. Working plan prescription for the forest land proposed for diversion : protected forest
6. Brief note on vulnerability of the forest area to erosion : Plain area which is not prone to erosion due to lopping operations
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Peacock and other common wildlife species like snakes,scorpions etc
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 15.16104
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1111.0802PFSIKAR31    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1
2
3
4 Details of amount for Medicinal Plant.
5 REWIRED INFORMATION UPLOADED FOR EDS DATED 23.07.2020

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Sikar77320063987.1564207.05126318.76816/08/2019688.486835.109
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Sikar TerritorialJaipurDFOYesOne07/08/2019
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Sikar TerritorialJaipurDFO RecommendedThis project is public utility project. This project will solve the eletric problem of pepole of sikar city This transmission line is useful for public. It is public utility work. Hence this diversion proposal is recommended
JaipurCF RecommendedFor Public UtilityYes
Nodal Officer RecommendedThe proposal is in public interest.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
RajasthanState SecretaryRecommended16/06/2020 recommended as per comments of Nodal Officer State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
JaipurRegional Office8B/Raj/04/26/202008/12/2020
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/RJ/TRANS/36238/2018TRANS3623820183488,317,353.005,000,000.0001/02/2021SBIN421032712332Corporation BankNEFT/RTGS (Challan)22/01/202127/01/2021
FP/RJ/TRANS/36238/2018TRANS3623820183488,317,353.003,317,353.0001/02/2021SBIN421032714002Corporation BankNEFT/RTGS (Challan)22/01/202127/01/2021
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 11.0802   (iii). No. of Maintenance years: 12   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)11.0802
  Status of CA Land so identified : Forest Area   Site Name : Sobh Kalakhet   Location Details : Range Sikar   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Sobh Kalakhet, SikarPF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/RJ/TRANS/36238/201808 Feb 2021No DataLand details are verified.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/RJ/TRANS/36238/201809 Mar 2023
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/RJ/TRANS/36238/201810 Dec 2021EDS: Please provide information as required by GOI01 Nov 2022
FP/RJ/TRANS/36238/201805 May 2021EDS: Please find attached EDS for compliance report.07 Dec 2021
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/RJ/TRANS/36238/2018The compliance report is uploaded.10 Aug 2021
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/RJ/TRANS/36238/201830 Jun 2023APPROVED