PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : RJ-086/2021
1. Location of the project/Scheme : Rajasthan
 (i) State / Union Territory : Rajasthan  (ii) District : Jaipur  (iii) Forest Division : Jaipur (North) Territorial  (iv) Area of forest land proposed for diversion (in ha.) : 4.314  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Jaipur (North) Territorial4.314Reserved Forest
Total 4.314
Division 1. : Jaipur (North) Territorial
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Jaipur4.314
Total4.314
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
14.3140.1Eco 3
Total. 4.314


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Azadirachta IndicaNeem114000
2Acacia leucophloeaRongh6142000
3Holoptelia integrifoliaChureal030000
4Acacia NiloticaDeshi Babuil053300
5OthersBare231100
6OthersHegoat010000
7OthersKumtha011000
8OthersGurjan100000
9OthersKhazadi100000
Total 11 2811 40 0
Sub Total (No of Trees.) 54


5. Working plan prescription for the forest land proposed for diversion : Soil Conservation and Rehabilitation Management working Circle , Afforestation Management working Circle
6. Brief note on vulnerability of the forest area to erosion : Area is not vulnerable to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Blue Bull, Striped Hyaena, Panther, Peacock, Other Birds and Reptile species etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
(i). Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no District Name VillageArea(in ha.)khasraKML filePresent Owner file
1JaipurKuhada4.314128,129,130,131,132,133
(ii). Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iii). Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A: (iv). Copy of CA scheme details: (iv). Copy of CA scheme details: NA
Additional information Details
S. No. DocumentsRemarks
1 Tree Counting List
2 EDS Reply Letter -05-05-2022
3 Van Bandobast Khasra Detail
4 PCCF Order No 584-691 date 01-03-2021 Regarding 1000 plants
5 GT Sheet Map of DFL Land
6 Detail Estimate of Ca DFL
7 EDS Reply 9-5-22 with Circula order 8-11-17 and 1-3-22
8 Gazette Notification of Talu ka Bass urf Barkada ki Dungary
9 Land Suitability CC NFL and DFL
10 Digital map of CA DFL land
11 CA Scheme DFL
12 Site Inspection Report
13 Specific Recommendation Report
14 NPV CC
15 GOI Order Dated 8-11-2017
16 CA Scheme NFL
17 Detail Estimate CA NFL
18 Forest Gazette notification Badi line 43 c
19 Non Violation CC
20 Digital Map
21 GT Sheet Map

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Jaipur111439094868380.442922446.419430/03/2022555.1341.10
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Jaipur (North) TerritorialJaipurDFOYesOne18/01/2022
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Jaipur (North) TerritorialJaipurDFO Recommended The requirement of forest land as proposed by the user agency in Col. 2 of part I is unavoidable and is barest minimum required for the project. In the public interest the proposal is recommended for acceptance.
JaipurCF RecommendedIn the public interest the proposal is recommended for acceptance.Yes
Nodal Officer RecommendedThe proposal is in public interest.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
RajasthanState SecretaryRecommended09/06/2022Recommended State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
JaipurRegional Office8B-RAJ035/2022-JPR01/07/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/RJ/ROAD/140508/2021ROAD14050820216696,466,863.006,466,863.0012/08/2022535301Union Bank Of IndiaUnion Bank Of India (Challan)29/07/202229/07/2022
FP/RJ/ROAD/140508/2021ROAD140508202197464,861.0064,861.0010/02/2023874152Union Bank Of IndiaNEFT/RTGS (Challan)09/01/202318/01/2023
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 4.314   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)4.314
  Status of CA Land so identified : Non Forest Area   Site Name : Kuhada   Location Details : Kuhada   Uploaded GPS File :   Uploaded Scanned copy of Map :   Mutation Status : Non Mutated   Mutation Status : Non Mutated
Status of CA Land so identified
District Name. Name of Tehsil.
JaipurViratnagar
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/RJ/ROAD/140508/202129 Aug 2022No DataLand details are verified.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/RJ/ROAD/140508/202103 Apr 2023
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/RJ/ROAD/140508/202129 Aug 2022EDS: please send reply01 Nov 2022
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/RJ/ROAD/140508/2021The compliance report i8s uploaded.02 Sep 2022
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/RJ/ROAD/140508/202105 Oct 2023APPROVED