PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
PB-0298/2018
1.
Location of the project/Scheme :
Punjab
(i)
State / Union Territory :
Punjab
(ii)
District :
Hoshiarpur
(iii)
Forest Division :
Dasuya
 (iv)
Area of forest land proposed for diversion (in ha.) :
0.5392
 (v)
Category of the Proposal:
Others
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Dasuya
0.5392
Areas notified under Section 4 & 5 of the PLPA
Total
0.5392
Division 1. : Dasuya
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Hoshiarpur
0.5392
Total
0.5392
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
0.5392
0
Eco 3
Total.
0.5392
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Others
nil
0
0
0
0
0
0
Total
0
0
0
0
0
0
Sub Total (No of Trees.)
0
5.
Working plan prescription for the forest land proposed for diversion :
NIL
6.
Brief note on vulnerability of the forest area to erosion :
their is no any soil erosion with this project
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
5
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Pig, Shamber, Neel Cow etc
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
Yes
(a)Details of violation(s):
NIL
(b) Period of Work done(year) :
2021
(c) Area of forest land involved in violation (in ha.) :
0.1285
S. No.
Name of person responsible for violation
Designation & Address of person responsible for violation
Action taken against the person responsible for violation
1
Ravinder Singh
nil
Damage report issued against User Agency
12.
Whether work in violation is still in progres(Yes/No) :
Yes
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
492982.71
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
1.3852
Bindraban C-4
Talwara-1
Bindraban C-4
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
Balance Sheet of CA & Annx A ( 28.04.2022)
2
Revised CA Scheme ( 28.04.2022)
3
Revised CA DGPS Map ( 28.04.2022)
4
Revised Land Suitability Certificate ( 28.04.2022)
5
Revised Estimate ( 28.04.2022)
6
Revised Part-2 ( 28.04.2022)
7
CA DGPS Map
8
Site Photo after violation
9
DGPS Map of Diverted Area
10
Processing fee
11
Site Photo before violation
12
Fard Zamabandi Punjabi & Englist Translation
13
Calculation Sheet/Breakup Area
14
PWD NOC
15
Site Plan
16
Undertaking of NPV & Addl nPV
17
Part-II
18
Site Inspection Report
19
CA + Penal cA Undertaking
20
CA Scheme
21
Detail of Violation Report
22
Land Suitability Certificate
23
Objections Far letter
24
Part-III ( recommended by CF, North Circle)
25
Estimate
26
Part-1, Justification, application & affidavit
27
CLU undertaking
28
Legal status of Forest area
29
Detail Note of project
30
FRA Certificate
31
Non Forest Area
32
DGPS Map of Revised Diverted area 03.03.2022
33
CA Estimate as per Revised area 03.03.2022
34
Justification of Revised area 03.03.2022
35
land suitability Certificate of Revised area 03.03.2022
36
GPM Fee Slip of Revised area 03.03.2022
37
Minimum Use certificate as per revised area 03.03.2022
38
Site Inspection Report 03.03.2022
39
Undertaking of CA, penal CA, & NPV of revised area 03.03.2022
40
Detail of Violation Report 03.03.2022
41
Authority Letter (Objection No 1) 03.03.2022
42
Breakup Area of Revised area 03.03.2022
43
CA DGPS Map as per Revised Area 03.03.2022
44
undertaking of CLU as per revised area 03.03.2022
45
Detail Note of Revised area 03.03.2022
46
Status of Forest area 03.03.2022
47
Undertaking of FRA certificate 03.03.2022
48
GPM Fee Slip of Previous area 03.03.2022
49
Part-1 of revised area 03.03.2022
50
Revised Part-2 ( 03.03.2022)
51
Site Plan of Revised area 03.03.2022
52
Ca Scheme of Revised area 03.03.2022
53
Far Letter ( 28.04.2022)
54
NPV Calculation dated 29.05.2024
55
Part 2 dated 29.05.2024
56
CA Scheme dated 29.05.2024
57
Calculation Sheet dated 29.05.2024
58
Estimate dated 29.05.2024
59
Far letter dated 29.05.2024
60
land Suitability dated 29.05.2024
61
Site Inspection dated 29.05.2024
62
Annexure 1 & 2 dated 29.05.2024
63
CA DGPS dated 29.05.2024
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Hoshiarpur
336500
34683.12
331.0792
127
705.5419
31/12/2023
592.3064
2.1149
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Dasuya
Shiwalik Circle
DFO
Yes
One
29/08/2018
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Dasuya
Shiwalik Circle
DFO
Recommended
Const. of Marriage Palace at village Sathwan PO Fatehpur under section 4 ,5 pLPA 1900. is required to met with the demand of the local people at site of town Dasuya.
Shiwalik Circle
CF
Recommended
marriage palace on
Yes
Nodal Officer
Recommended
Recommended
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Punjab
State Secretary
Recommended
03/07/2024
Recommended
State Govt. Officer
No Data
Print
Checklist for State Nodal Officer
×