PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : PB-0298/2018
1. Location of the project/Scheme : Punjab
 (i) State / Union Territory : Punjab  (ii) District : Hoshiarpur  (iii) Forest Division : Dasuya  (iv) Area of forest land proposed for diversion (in ha.) : 0.5392  (v)

Category of the Proposal: Others
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Dasuya0.5392Areas notified under Section 4 & 5 of the PLPA
Total 0.5392
Division 1. : Dasuya
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Hoshiarpur0.5392
Total0.5392
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.53920Eco 3
Total. 0.5392


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Othersnil000000
Total 0 00 00 0
Sub Total (No of Trees.) 0


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : their is no any soil erosion with this project
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 5
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Pig, Shamber, Neel Cow etc
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : Yes
  (a)Details of violation(s): NIL
   (b) Period of Work done(year) : 2021
   (c) Area of forest land involved in violation (in ha.) : 0.1285
S. No. Name of person responsible for violation Designation & Address of person responsible for violationAction taken against the person responsible for violation
1Ravinder SinghnilDamage report issued against User Agency
12. Whether work in violation is still in progres(Yes/No) : Yes
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 492982.71
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
111.3852Bindraban C-4Talwara-1Bindraban C-4    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Balance Sheet of CA & Annx A ( 28.04.2022)
2 Revised CA Scheme ( 28.04.2022)
3 Revised CA DGPS Map ( 28.04.2022)
4 Revised Land Suitability Certificate ( 28.04.2022)
5 Revised Estimate ( 28.04.2022)
6 Revised Part-2 ( 28.04.2022)
7 CA DGPS Map
8 Site Photo after violation
9 DGPS Map of Diverted Area
10 Processing fee
11 Site Photo before violation
12 Fard Zamabandi Punjabi & Englist Translation
13 Calculation Sheet/Breakup Area
14 PWD NOC
15 Site Plan
16 Undertaking of NPV & Addl nPV
17 Part-II
18 Site Inspection Report
19 CA + Penal cA Undertaking
20 CA Scheme
21 Detail of Violation Report
22 Land Suitability Certificate
23 Objections Far letter
24 Part-III ( recommended by CF, North Circle)
25 Estimate
26 Part-1, Justification, application & affidavit
27 CLU undertaking
28 Legal status of Forest area
29 Detail Note of project
30 FRA Certificate
31 Non Forest Area
32 DGPS Map of Revised Diverted area 03.03.2022
33 CA Estimate as per Revised area 03.03.2022
34 Justification of Revised area 03.03.2022
35 land suitability Certificate of Revised area 03.03.2022
36 GPM Fee Slip of Revised area 03.03.2022
37 Minimum Use certificate as per revised area 03.03.2022
38 Site Inspection Report 03.03.2022
39 Undertaking of CA, penal CA, & NPV of revised area 03.03.2022
40 Detail of Violation Report 03.03.2022
41 Authority Letter (Objection No 1) 03.03.2022
42 Breakup Area of Revised area 03.03.2022
43 CA DGPS Map as per Revised Area 03.03.2022
44 undertaking of CLU as per revised area 03.03.2022
45 Detail Note of Revised area 03.03.2022
46 Status of Forest area 03.03.2022
47 Undertaking of FRA certificate 03.03.2022
48 GPM Fee Slip of Previous area 03.03.2022
49 Part-1 of revised area 03.03.2022
50 Revised Part-2 ( 03.03.2022)
51 Site Plan of Revised area 03.03.2022
52 Ca Scheme of Revised area 03.03.2022
53 Far Letter ( 28.04.2022)
54 NPV Calculation dated 29.05.2024
55 Part 2 dated 29.05.2024
56 CA Scheme dated 29.05.2024
57 Calculation Sheet dated 29.05.2024
58 Estimate dated 29.05.2024
59 Far letter dated 29.05.2024
60 land Suitability dated 29.05.2024
61 Site Inspection dated 29.05.2024
62 Annexure 1 & 2 dated 29.05.2024
63 CA DGPS dated 29.05.2024

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Hoshiarpur33650034683.12331.0792127705.541931/12/2023592.30642.1149
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
DasuyaShiwalik CircleDFOYesOne29/08/2018
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
DasuyaShiwalik CircleDFO RecommendedConst. of Marriage Palace at village Sathwan PO Fatehpur under section 4 ,5 pLPA 1900. is required to met with the demand of the local people at site of town Dasuya.
Shiwalik CircleCF Recommendedmarriage palace onYes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
PunjabState SecretaryRecommended03/07/2024RecommendedState Govt. OfficerNo Data