PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : PB-0327/2021
1. Location of the project/Scheme : Punjab
 (i) State / Union Territory : Punjab  (ii) District : Tran Taran  (iii) Forest Division : Amritsar  (iv) Area of forest land proposed for diversion (in ha.) : 0.0388  (v)

Category of the Proposal: Approach Access
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Amritsar0.0388Protected Forest
Total 0.0388
Division 1. : Amritsar
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Tran Taran0.0388
Total0.0388
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.03880.01Eco 3
Total. 0.0388


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Dalburgia SisooShisam000110
2Albezzia Labbecksiris000200
Total 0 00 31 0
Sub Total (No of Trees.) 4


5. Working plan prescription for the forest land proposed for diversion : Yes
6. Brief note on vulnerability of the forest area to erosion : This area is not vulnerable to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 48698
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.1PFAjnalaLBC RD 133-144 L/s    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Revised Part II
2 Processing fees and marking fees
3 Toposheet project
4 Detail Note
5 Forest Area Detail
6 DGPS Map of CA site
7 DGPS Map of Project Site
8 GPM Fee Slip
9 Photograph
10 Jamabandi with English Translation
11 Justification of EC
12 KML File of Project Site
13 Certificate for Minimum use of Forest Land
14 No Such Proposal Pending for Stage-1
15 Form A (Part-1)
16 Undertaking of Non-Forest Land
17 Competent Authority and LOI
18 Detail of Non Forest Area
19 Item Wise Breakup
20 Land Suitability Certificate
21 Marking List of Trees
22 Undertaking of Additional NPV
23 Undertaking of CA
24 Undertaking of CLU
25 Justification for location of the Project
26 PWD NOC
27 Undertaking of NPV
28 Undertaking of Cost of trees felled
29 Undertaking of FRA with Application
30 Undertaking of ROB
31 Undertaking of Toll Plaza
32 Demand Letter
33 Layout plan
34 Site inspection report
35 Undertaking of PPCB
36 Undertaking of High Tension wire
37 Revised CA Scheme
38 Undertaking of LPG Godown
39 Reply dated 21-01-2022
40 CA Sites Detail Muradpura

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Tran Taran50000614771.73913.6743591708.19431/12/20201589.0040
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
AmritsarBist circleDFOYesOne07/12/2021
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
AmritsarBist circleDFO RecommendedThe strip along this road is declared as PF
Bist circleCF RecommendedRecommended for approval.Yes
Nodal Officer RecommendedPublic Utility Project
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
PunjabState SecretaryRecommended28/04/2022Public Utility ProjectState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
ChandigarhState GovernmentFOREST-FCA0FC5A/83/2021-FCA27/04/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/PB/Approach/149330/2021APPROACH1493302021617105,977.00105,977.0016/03/2024UCBAH24076046710Union Bank Of IndiaNEFT/RTGS (Challan)14/03/202414/03/2024
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 0.0388   (iii). No. of Maintenance years: 15   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)0.0388
  Status of CA Land so identified : Non Forest Area   Site Name : NFL LAND FOR IOCL MURADPURA   Location Details : AT VILLAGE MALAHWALA, TEHSIL PATTI, DISTT TARN TARAN   Uploaded GPS File :   Uploaded Scanned copy of Map :   Whether land Mutated or not : No
Status of CA Land so identified
District Name. Name of Tehsil.
Tran TaranTarn-Taran
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/PB/Approach/149330/202103 Apr 2024No DataCA Land verified.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/PB/Approach/149330/202113 May 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/PB/Approach/149330/2021IN-PRINCIPLENo Data