PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
OR-02/2018
1.
Location of the project/Scheme :
Orissa
(i)
State / Union Territory :
Orissa
(ii)
District :
Kandhamal,Ganjam
(iii)
Forest Division :
Phulbani,Ghumusur North
 (iv)
Area of forest land proposed for diversion (in ha.) :
27.343
 (v)
Category of the Proposal:
Road
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Phulbani
5.211
Reserved Forest
2
Phulbani
0.823
Proposed Reserved Forests (Sec-4 of IFA)
3
Phulbani
1.526
Village Forest
4
Phulbani
0.162
Revenue Forest
5
Ghumusur North
15.927
Reserved Forest
6
Ghumusur North
3.694
Khesra Forest
Total
27.343
Division 1. : Ghumusur North
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Ganjam
19.621
Total
19.621
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
19.621
0.7
Eco 3
Total.
19.621
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Acacia Auriculiformis
Acacia
0
1
0
0
1
0
2
Morinda tinctoria
Acchu
0
2
2
1
0
0
3
Mangifera Indica
Amba
0
0
0
0
4
21
4
Terminalia Tomentosa
Asana
0
3
22
41
35
29
5
Terminalia bellerica
Bahada
0
0
0
1
2
3
6
Ficus benghalensis
Bara
0
0
2
2
0
9
7
Mimusops Elengi
Baula
0
1
1
1
2
1
8
Aegle marmelos
Bela
0
0
1
1
1
0
9
Semecarpus Anacardium
Bhalia
0
1
1
1
0
0
10
Cassia siamea
Chakunda
0
3
1
0
0
0
11
Buchanania lanzan
Chara
0
2
3
1
0
0
12
Anogeissus latifolia
Dhaura
0
1
1
5
6
2
13
Adina cordifolia
Kuruma
0
1
3
6
7
10
14
Syzygium cumini
Jamu
0
0
0
1
0
3
15
Anthocephalus Cadamba
Kadamba
0
2
14
0
0
1
16
Limonia acidissima
Kaitha
0
0
2
0
0
0
17
Cleistanthus collinus
Karada
0
1
5
0
0
0
18
Bridelia retusa
Kasi
0
0
1
7
5
10
19
Diospyros melanoxylon
Kendu
0
0
16
19
13
18
20
Careya arborea
Kumbhi
0
0
1
2
0
1
21
Schleichera oleosa
Kusum
0
0
1
1
1
6
22
Madhuca indica
Mahula
0
3
7
7
7
11
23
Lannea coromandelica
Mai
0
0
3
8
14
15
24
Azadirachta indica
Neem
0
0
0
0
1
0
25
Pterocarpus marsupium
Piasal
0
0
0
0
1
1
26
Shorea robusta
Sal
0
5
20
34
49
106
27
Lagerstroemia parviflora
Sidha
0
0
1
1
0
1
28
Bombax Ceiba
Simli
1
0
0
0
0
0
29
Albizia Procera
Siris
0
5
2
0
0
0
30
Cassia fistula
Sunari
0
0
0
1
0
0
31
Tectona Grandis
Teak
0
26
36
17
6
1
32
Tamarindus Indica
Tentuli
0
0
1
2
3
15
Total
1
57
147
160
158
264
Sub Total (No of Trees.)
787
5.
Working plan prescription for the forest land proposed for diversion :
No Proposal
6.
Brief note on vulnerability of the forest area to erosion :
Road is running in side Forest. The terrain is plain.
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0.006
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Nil
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
Yes
Details and comments on the impact of Project on such areas :
The site comes partly under elephant corridor area. There will be no impact in the road project how ever number of humps and signage board will be provided.
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
Yes
Details and comments on the impact of Project on such areas :
The Site comes partly under elephant movement area. There will be no impact in the road project how ever number of humps and signage board will be provided.
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
Yes
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
8219943
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
40
Other
Purunakatak
Millan Sheet No-2
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
2
Site Inspection Report Gh. North Division (After Rectification)
3
Comments on Project, Gh. North Division (After Rectification)
4
5
6
PART - II OF THE PROJECT
7
Comments on Project after 2nd Site Inspection held on dated 21.08.2019- Ghumsur North Forest Division.
8
Revised Part II after 2nd Site Inspection held on dated 21.08.2019- Ghumsur North Forest Division.
9
Revised Site Inspection Report after 2nd Site Inspection held on dated 21.08.2019- Ghumsur North Forest Division.
Division 2. : Phulbani
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Kandhamal
7.722
Total
7.722
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
7.722
0.5
Eco 3
Total.
7.722
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Mangifera indica
Amba
0
0
0
2
0
9
2
Terminalia Arjuna
Arjuna
0
0
1
0
0
1
3
Terminalia Tomentosa
Asan
0
11
11
11
8
12
4
Terminalia Bellarica
Bahada
0
0
0
1
0
1
5
Ougeinia ougenensis
Bandhan
0
5
9
3
0
4
6
Ficus Bengalensis
Bara
0
0
0
0
0
4
7
Semecarpus Anacardium
Bhalia
0
4
0
2
0
0
8
Buchanania lanzan
Chara
0
16
5
3
0
0
9
Grewia Tiliaefolia
Dhaman
0
3
4
0
1
0
10
Anogeissus latifolia
Dhura
0
0
0
2
0
0
11
Ficus hispida
Dimiri
0
0
0
0
0
1
12
Syzigium Cumini
Jamu
3
0
2
0
1
0
13
Anthocephalus Cadamba
Kadamba
0
3
10
4
0
0
14
Cleistanthus collinus
Karada
0
24
14
5
1
0
15
Bridelia retusa
Kasi
0
0
2
7
4
4
16
Diospyros melanoxylon
Kendu
0
5
2
2
2
0
17
Careya arborea
Kumbhi
0
2
0
1
0
0
18
Adena Cardifolia
Kuruma
0
4
7
3
0
4
19
Schleichera oleosa
Kusum
0
0
1
0
0
3
20
Madhuca indica
Mahula
0
4
3
0
0
2
21
Lannea coromandelica
Mai
0
1
1
4
3
6
22
Mitragyna parvifolia
Mundi
0
1
2
1
0
0
23
Pterocarpus Marsupium
Piasal
0
0
1
1
1
4
24
Sal
Sal
0
28
25
21
8
15
25
Dillenia pentagyna
Rai
0
0
0
1
0
0
26
Lagerstroemia parviflora
Senha
0
3
1
0
0
0
27
Dalbergia sisoo
Sisoo
0
0
1
0
0
0
28
Cassia fistula
Sunari
0
1
5
1
0
0
29
Teak
Teak
0
3
0
5
5
0
30
Tamarindus indica
Tentuli
0
0
0
0
0
1
31
Others
Mankada Kendu/Diospyros excelsa
0
3
1
1
0
1
32
Others
Radhachuda/Caesalpinia pulcherrima
0
1
0
1
0
0
33
Others
Patuli
0
3
4
1
0
0
34
Others
Misc.
11
7
3
5
2
0
Total
14
132
115
88
36
72
Sub Total (No of Trees.)
457
5.
Working plan prescription for the forest land proposed for diversion :
RF-Selection working circle PRF-Rehabilitation working circle
6.
Brief note on vulnerability of the forest area to erosion :
Road is running in side Forest. The terrain is undulating and prone to erosion..
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
5
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Elephant, leopard,wild boar, Spotted dear,Mouse dear,Porcupines,Wolf, Jungle cat, Sloth bear,Rattles, Python,jackel, mangoose, lizards, peafowl etc
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
200.87
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
18.00
Talarimaha PRF
Udayagiri
0
View file
2
2
16.70
Paburia PRF
Udayagiri
0
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
RECOMMENDATION FORM(AFTER RECTIFICATION), PHULBANI DIVISION
2
PHULBANI DIVISION
3
Phulbani Division
4
Revised Site inspection report and part-II of Phulbani Division
5
6
7
8
REVISED PART-II
9
REVISED SCHEME DETAILS OF PHULBANI DIVISION
10
REVISED PART-II OF PHULBANI FOREST DIVISION
11
REVISED SITE INSPECTION REPORT OF PHULBANI DIVISION
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Ganjam
236021.7
92048.47
82.847
5
0
12/03/2019
0
0
2
Kandhamal
802000
570983
0
0
0
22/12/2018
0
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Phulbani
Berhampur
DFO
Yes
Two
27.07.2018,12.09.2018
Ghumusur North
Berhampur
DFO
Yes
One
07/03/2019
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Phulbani
Berhampur
DFO
Recommended
There is no alternative land for widening of NH.
Ghumusur North
Berhampur
DFO
Recommended
Recommended.
Berhampur
CF
Recommended
Proposal for diversion of 27.343 ha of forest land Phulbani Division 7.722 ha + Ghumsur North Division 19.621 ha. for widening of existing 2 lane to 2 lane with 1.5 m wide paved shoulder of NH 157 from Km 0/0 to 81/00 Phulbani Division and 93/00 to 119/00 Gh. North Division on EPC mode in State of Odisha, aims to improve socio economic development and to provide safety of vehicular traffic and increase of fuel efficiency of vehicles plying on this road.It will allow speedy movement of vehicles in the left wing affected area and help in socio economic growth of the area. Since the project is initiated with a larger interest of general public of locality vis à vis the State as a whole, the proposal for diversion of 27.343 ha of forest land for widening of existing 2 lane to 2 lane with 1.5 m wide paved shoulder on both sides of road NH 157 from Km 0/0 to 81/00 and 93/00 to 119/00 is recommended.
Yes
Nodal Officer
Recommended
Recommended for diversion of 27.343 ha forest land for widening of existing 2 lane to 2 lane with 1.5 mtr wide paved shoulder from 0/00 Km to 81/00 Km and 93/00 Km to 119/00 Km of NH 157 on EPC mode under Ghumsur North & Phulbani Forest Division in the Kandhamal & Ganjam districts of Odisha by Executive Engineer, N.H. Division, Sambalpur for approval under Section 2 ii of Forest Conservation Act, 1980.
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Orissa
State Secretary
Recommended
27/04/2021
Recommended
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Bhubaneswar
Regional Office
5-ORC463/2021-BHU
28/12/2021
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/OR/ROAD/31054/2017
ROAD310542017081
23,006,621.00
23,006,621.00
08/03/2022
010334590671
Union Bank Of India
NEFT/RTGS (Challan)
28/02/2022
03/03/2022
FP/OR/ROAD/31054/2017
ROAD310542017681
13,545,700.00
13,545,700.00
29/04/2022
000544501510
Union Bank Of India
NEFT/RTGS (Challan)
14/04/2022
16/04/2022
FP/OR/ROAD/31054/2017
ROAD310542017505
122,205,700.00
122,205,700.00
04/08/2022
684867
Union Bank Of India
NEFT/RTGS (Challan)
26/07/2022
30/07/2022
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
43.9894
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
43.9894
Status of CA Land so identified :
Non Forest Area
Site Name :
Dharmanagar village under Harbhanga Tahasil in Boudh District.
Location Details :
Dharmanagar village in Purunakatak Range under Boudh Forest Division
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Berhampur
Boudh
Purunakatak
104/2021
28 Nov 2022
43.9894
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/OR/ROAD/31054/2017
01 Dec 2023
No Data
verified
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/OR/ROAD/31054/2017
19 Feb 2024
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/OR/ROAD/31054/2017
The compliance to the conditions imposed by GoI MoEF & CC RO Bhubaneswar as well as State Govt. is sent herewith vide this office letter No. 21942 dated 09.11.2023 for according final approval.
04 Mar 2024
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/OR/ROAD/31054/2017
14 Mar 2024
APPROVED
Print
Checklist for State Nodal Officer
×