PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : OR-022/2018
1. Location of the project/Scheme : Orissa
 (i) State / Union Territory : Orissa  (ii) District : Boudh  (iii) Forest Division : Boudh  (iv) Area of forest land proposed for diversion (in ha.) : 0.966  (v)

Category of the Proposal: Others
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
NIL
Division 1. : Boudh
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Boudh0.992
Total0.992
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.9660.3Eco 3
Total. 0.966


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL
5. Working plan prescription for the forest land proposed for diversion : Revenue Forest Land not covered under working plan
6. Brief note on vulnerability of the forest area to erosion : The forest land proposed for diversion is a plane land with gentle slope and as there is no provision of tree felling. Hence scope of soil erosion is negligible
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 3
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Not reported presence of any wildlife in the said Revenue Forest Land.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : Yes
  (a)Details of violation(s): There is violation of Forest Conservation Act 1980
   (b) Period of Work done(year) : 2017
   (c) Area of forest land involved in violation (in ha.) : 0.966
S. No. Name of person responsible for violation Designation & Address of person responsible for violationAction taken against the person responsible for violation
1Ritesh SahuManaging Director Plot No C Eighth Four Palashpali Airport AreaThe Collector and District Magistrate Boudh has been intimated to take legal action against the User Agency as per OPLE Act Since land is Revenue Forest land
12. Whether work in violation is still in progres(Yes/No) : Yes
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
NO Data
(ii). Copy of CA scheme details: NA (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.: (V). Copy of NOC from Competent Authority:
Additional information Details
S. No. DocumentsRemarks
1

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Boudh309800128982195.934829.15413/12/201829.154166.74
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
BoudhBerhampurDFOYesTwo21/05/2018,04/12/2018
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
BoudhBerhampurDFO RecommendedProposal for diversion 0.966 ha of Revenue Forest Land for installation of Pipeline over a length 1.931 Km for drawl of water from River Mahanadi to Boudh Distillery in Odisha is utmost necessary to run the Distillery unit. The Forest area proposed for diversion is the ultimate option as the pipeline has already been laid in the forest land. This is the only large scale industry in the district of Boudh which is mostly dominated by poor and labour class people. This will definitely create an opportunity for generation of employment in an around the Distillery. In addition to this industry may develop social security to the local people living around the project. Hence in view of the above it is recommended to accept the proposal.
BerhampurCF RecommendedProposal for diversion 0.966 hectare of revenue forest land for installation of pipe line over a length of 1.931 kms for drawl of water from river Mahanadi to Boudh Distillery is utmost necessary to run the Distillery unit. The forest area proposed for diversion is the only option as the pipeline has already been laid in the forest land. This would be the only large scale industry in the Boudh district.This will definitely create an opportunity for generation of employment in an around the Distillery. In view of above, it is recommended to accept the proposal.Yes
Nodal Officer RecommendedRecommended for diversion of 0.966 ha of forest land in village Fakirpur, Bishnupur, Titirikata under Harbhanga Tahsil of Boudh District for installation of pipeline for drawl of water from river Mahanadi to Boudh Distillery by M/s Boudh Distillery Pvt. Ltd. of Boudh Forest Division in the State of Odisha for approval under Section 2 of Forest Conservation Act, 1980.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
OrissaState SecretaryRecommended23/10/2019 recommended vide letter no 20127 dated 23.10.2019. State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
BhubaneswarRegional Office5-ORB399/2019-BHU04/12/2019
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/OR/Others/32590/2018OTHERS325902018777930,990.00930,990.0020/03/2020BKIDR52020032000119359Corporation BankNEFT/RTGS (Challan)17/03/202020/03/2020
FP/OR/Others/32590/2018OTHERS3259020189472,886.002,886.0023/07/2021BKIDN21204785085Union Bank Of IndiaNEFT/RTGS (Challan)22/07/202123/07/2021
FP/OR/Others/32590/2018OTHERS3259020180803,347.003,347.0003/06/2022BKIDY22154258176Union Bank Of IndiaNEFT/RTGS (Challan)27/05/202201/06/2022
FP/OR/Others/32590/2018OTHERS3259020181972,300,144.002,300,140.00Union Bank Of IndiaNEFT/RTGS (Challan)20/11/202422/11/2024
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details) : No
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/OR/Others/32590/201821 Sep 2020No Data.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/OR/Others/32590/201825 Apr 2024
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/OR/Others/32590/201806 Dec 2023EDS: Please comply the EDS vide this office Memo No. 5284 dated 02.03.202402 Mar 2024
FP/OR/Others/32590/201820 Jul 2023EDS: Please comply the EDS vide this office Memo No. 15756 dated 05.08.2023.05 Aug 2023
FP/OR/Others/32590/201807 Sep 2022EDS: Please comply the EDS vide this office Memo No. 18992 dated 27.09.202230 Sep 2022
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/OR/Others/32590/2018The compliance to the conditions imposed by GoI MoEF & CC IRO Bhubaneswar as well as State Govt. is sent herewith vide this office letter No.16238 dated 20.08.2022 for according final approval.12 Sep 2022
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/OR/Others/32590/201831 May 2024APPROVED