PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : OR-095/2021
1. Location of the project/Scheme : Orissa
 (i) State / Union Territory : Orissa  (ii) District : Koraput  (iii) Forest Division : Koraput  (iv) Area of forest land proposed for diversion (in ha.) : 41.297  (v)

Category of the Proposal: Others
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Koraput1.325Revenue Forest
2Koraput39.972Jungle Block
Total 41.297
Division 1. : Koraput
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Koraput41.297
Total41.297
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
141.2970.3Eco 3
Total. 41.297


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1EucalyptusNilagiri001000
2Greviia RobustaSilver Oak09333060
3Mangifera indicaMango002003
4Cassia siameaSana Chkunda024000
5Michelia champacaChampa000001
6Gmelin ArboreaGambhar020000
7Syzigium CuminiJamu000100
8Anacardium OccidentaleCashew0215000
9Pongamia PinnataKaranja030002
10Schleichera oleosaKusuma001000
11Artocarpus HeterophyllusPanas000002
12Greviia RobustaSilver oak002200
13Bombax CeibaSimili011000
14Tamarindus indicaTamarind001120
Total 0 3850 348 8
Sub Total (No of Trees.) 138


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : The Proposed lease area is vulnerable to erosion & specially the steep slopes are more vulnerable to erosion. Necessary measures requires to be taken up to check soil erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 3
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : During the field inspection no wildlife or sign of wildlife was noticed.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 538.67
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1183.169Rabalpadu DPFSimiliguda1    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
NIL

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Koraput8807001879532868.7659113711.92515/09/20232016.073787.481
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
KoraputKoraputDFOYesTwo02/09/2023,13/09/2023
 KoraputCFYesTwo25/09/2023,26/09/2023
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
KoraputKoraputDFO RecommendedProposal of NALCO for the Conveyor Corridor system for pottangi Bauzite Mines over 41.297 ha. of forest land is hereby recommended for acceptance, subject to deposit of Compensatory levis as per the demand raised by the competent authority.
KoraputCF RecommendedThe diversion is required for conveyor corridor system of Pottangi Bauxite Mines by NALCO and therefore, the proposal is recommended for acceptance.Yes
Nodal Officer RecommendedRecommended for diversion of 41.297 ha of forest land for Conveyor Corridor System connecting between Pottangi Bauxite Mines and Alumina Refinery Plant at Damanjodi under Koraput Forest Division of Koraput District, Odisha by M/s NALCO for approval under Section 2 ii of FC Act, 1980.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
OrissaState SecretaryRecommended20/11/2023recommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
BhubaneswarRegional Office5-ORA620/2023-BHU22/12/2023
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/OR/Others/149695/2021OTHERS149695202122360,230,241.0060,230,200.0013/01/2024SBINR52024020199573261Union Bank Of IndiaNEFT/RTGS (Challan)11/01/202412/01/2024
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 83.169   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)83.169
  Status of CA Land so identified : Forest Area   Site Name : Degraded Forest land in Rabalpadu DPF of Simliguda Forest Range Office in Koraput Forest Division   Location Details : Rabalpadu DPF of Simliguda Forest Range Office in Koraput Forest Division   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Rabalpadu DPFOthers
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/OR/Others/149695/202105 Jul 2024No Dataverified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/OR/Others/149695/202109 Jul 2024
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/OR/Others/149695/2021The compliance to the conditions imposed by GoI MoEF & CC RO Bhubaneswar as well as State Govt. is sent herewith vide this office letter No. 10471 dated 18.05.2024 for according final approval.15 Jul 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/OR/Others/149695/202123 Sep 2024APPROVED