PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
OR-054/2021
1.
Location of the project/Scheme :
Orissa
(i)
State / Union Territory :
Orissa
(ii)
District :
Keonjhar
(iii)
Forest Division :
Keonjhar
 (iv)
Area of forest land proposed for diversion (in ha.) :
194.683
 (v)
Category of the Proposal:
Mining
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Keonjhar
30.657
Reserved Forest
2
Keonjhar
71.242
Revenue Forest
3
Keonjhar
83.666
SABIK Forest
4
Keonjhar
9.118
Private Forest
Total
194.683
Division 1. : Keonjhar
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Keonjhar
194.683
Total
194.683
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
194.683
0.5
Eco 1
Total.
194.683
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Dalbergia sisoo
Sisoo
0
22
8
0
0
0
2
Shorea robusta
Sal
0
7013
1445
336
124
122
3
Pterocarpus marsupium
Piasal
0
10
8
3
1
0
4
Gmelina arborea
Gambhari
0
8
3
1
0
0
5
Terminalia tomentosa
Asana
0
153
31
6
3
2
6
Anogeissus latifolia
Dhaura
0
57
20
4
2
1
7
Mangifera Indica
Mango
0
1
3
4
1
3
8
Syzygium cumini
Jamu
0
35
7
3
1
3
9
Diospyros melanoxylon
Kendu
0
160
29
5
5
0
10
Bridelia retusa
Kasi
0
34
2
2
0
0
11
Misc. Species
Misc
0
1723
413
81
57
60
Total
0
9216
1969
445
194
191
Sub Total (No of Trees.)
12015
5.
Working plan prescription for the forest land proposed for diversion :
Yes
6.
Brief note on vulnerability of the forest area to erosion :
No
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Elephant, Bear, Barking Dear, Hyena, Porcupine and etc
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
(i).
Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no
District Name
Village
Area(in ha.)
khasra
KML file
Present Owner file
1
Koraput
Peturu
125.348
Khata No 61
2
Koraput
Peturu
30.21
Khata No 61
3
Koraput
Peturu
39.125
Khata No.61
(ii).
Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iii).
Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A:
(iv).
Copy of CA scheme details:
NA
Additional information Details
S. No.
Documents
Remarks
NIL
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Keonjhar
830300
336615.6293
14597.9759
120
9652.9589
23/10/2021
4148.92
5983.9016
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Keonjhar
Rourkela
DFO
Yes
Two
08/10/2021,10/10/2021
Rourkela
CF
Yes
One
24/10/2021
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Keonjhar
Rourkela
DFO
Recommended
1. The forest land over 194.683 ha forest land in village Guali, Panduliposhi, Rugudihi, Laharpada & Tapadihi and Sidhamath Reserved Forest under Barbil Tahasil of Barbil Range, the total mining lease area of 358.258 ha (As per DGPS Survey) within Gulai Iron Ore Mines of M/s OMC Ltd. of Keonjhar District. 2. Topadihi Nala exists inside ML area but as per proposed mining plan its course is proposed to be changed. 3. Hence, before executing any activity, prior approval for diversion of concerned nala must be obtained from competent authority. 4. Graded contour bunds needs to be constructed along slope to reduce soil and water erosion and water purification. 5. Sal seedlings must be planted in Green belt and safety zone. 6. The submitted diversion proposal over 194.683 ha forest land under Keonjhar forest division is forwarded herewith for consideration as per provision under section 2 (ii) of Forest (Conservation) Act, 1980 (Amended)
Rourkela
CF
Recommended
Mining Project
Yes
Nodal Officer
Recommended
Recommended for diversion of 194.683 ha of forest land involved in the mining lease area over 358.258 ha As per DGPS / 365.026 ha As per RoR of Guali Iron Ore Mines of M/s OMC Ltd in Keonjhar District, Odisha for approval under Section 2 ii of Forest Conservation Act, 1980.
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Orissa
State Secretary
Recommended
02/05/2022
Recommended
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Bhubaneswar
Head Office
8-96/1996-FC (PT.-I)
21/12/2023
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/OR/MIN/140713/2021
MIN1407132021297
38,189,400.00
38,189,400.00
2024-01-08
UBINJ24008536147
Union Bank Of India
NEFT/RTGS (Challan)
2023-12-26
2023-12-26
FP/OR/MIN/140713/2021
MIN1407132021584
223,260,357.00
223,260,000.00
2024-02-02
UBINJ24033611565
Union Bank Of India
NEFT/RTGS (Challan)
2024-01-24
2024-01-25
FP/OR/MIN/140713/2021
MIN1407132021785
173,656,900.00
173,657,000.00
2024-06-26
UBINJ24178083392
Union Bank Of India
NEFT/RTGS (Challan)
NA
NA
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
194.683
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
3
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
125.352
Status of CA Land so identified :
Non Forest Area
Site Name :
Peturu
Location Details :
AT-Peturu, PO-Pottangi, Tahasil-Pottangi, Dist-Koraput
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Koraput
Koraput
Similiguda
1/2024
04 Apr 2024
125.352
No. of patches :
2
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
2
Block(Polygon)
30.21
Status of CA Land so identified :
Non Forest Area
Site Name :
Peturu
Location Details :
AT-Peturu, PO-Pottangi, Tahasil-Pottangi, Dist-Koraput
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Koraput
Koraput
Similiguda
1/2024
04 Apr 2024
30.21
No. of patches :
3
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
3
Block(Polygon)
39.121
Status of CA Land so identified :
Non Forest Area
Site Name :
Peturu
Location Details :
AT-Peturu, PO-Pottangi, Tahasil-Pottangi, Dist-Koraput
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Koraput
Koraput
Similiguda
1/2024
04 Apr 2024
39.121
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/OR/MIN/140713/2021
12 Aug 2024
No Data
verify
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/OR/MIN/140713/2021
17 Aug 2024
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/OR/MIN/140713/2021
The compliance to the conditions imposed by GoI MoEF & CC New Delhi as well as State Govt. is sent herewith vide this office letter No.19632 dated 27.09.2024 for according final approval.
17 Oct 2024
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/OR/MIN/140713/2021
Approved In-Principle
No Data
Print
Checklist for State Nodal Officer
×