PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
MZ-011/2022
1.
Location of the project/Scheme :
Mizoram
(i)
State / Union Territory :
Mizoram
(ii)
District :
Lunglei
(iii)
Forest Division :
Lunglei
 (iv)
Area of forest land proposed for diversion (in ha.) :
0.1088
 (v)
Category of the Proposal:
Drinking Water
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Lunglei
0.1088
Reserved Forest
Total
0.1088
Division 1. : Lunglei
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Lunglei
0.1088
Total
0.1088
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
0.1088
0.8
Eco 1
Total.
0.1088
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Bischofia Javanica
Khuangthli
0
0
0
0
0
1
2
Others
Thuza
0
0
1
1
0
0
3
Others
Tufar
0
0
1
0
0
0
4
Others
Tlaizawng
0
0
0
1
0
1
5
Others
Vaube
0
0
0
1
0
0
6
Others
Berawchal
0
0
0
0
0
1
7
Others
Beltur
0
0
1
0
0
0
8
Others
Bul
0
0
0
1
0
0
9
Others
Theiarlung
0
0
1
0
0
0
10
Others
Sahatah
0
0
1
1
0
0
11
Others
Nauthakpui
0
0
0
0
0
1
12
Others
Buleng
7
0
0
0
0
0
13
Others
Belphuar
12
0
0
0
0
0
14
Others
Batling
11
0
0
0
0
0
15
Others
Chhimhruk
9
0
0
0
0
0
16
Others
Fartuah
5
0
0
0
0
0
17
Others
Hnahkiah
10
0
0
0
0
0
18
Others
Khaupui
7
0
0
0
0
0
19
Others
Sernam
6
0
0
0
0
0
20
Others
Phaktel
3
0
0
0
0
0
21
Others
Sihneh
7
0
0
0
0
0
22
Others
Thakthing suak
6
0
0
0
0
0
23
Others
Thalteh
6
0
0
0
0
0
24
Others
Thingpuanchhia
9
0
0
0
0
0
25
Others
Thingsia
7
0
0
0
0
0
26
Albzzia Spp.
Vang
11
0
0
0
0
0
Total
116
0
5
5
0
4
Sub Total (No of Trees.)
130
5.
Working plan prescription for the forest land proposed for diversion :
Rehabilitation and plantation working circle
6.
Brief note on vulnerability of the forest area to erosion :
The proposed site is near the point of origin of river Tlawng, which is in its nascent stage and vulnerable to various disturbances
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
The proposed site is very rich in biodiversity and various species of trees, herbs, medicinal plants, birds and animals are found
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
0.4333
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
0.2176
Tlawnghnar RF
Lunglei
LL_TLRF_2
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
Site inspection photo
2
NPV Calculation
3
Site inspection report
4
Specific recommendation
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Lunglei
453600
354458
44.83
5
2.47
20/03/2023
2.47
43
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Lunglei
Southern circle
DFO
Yes
Four
18/07/2022,20/01/2023,27/02/2023,20/03/2023
Southern circle
CF
Yes
One
18/04/2023
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Lunglei
Southern circle
DFO
Not-Recommended
Due to the reasons stated in the site inspection report, I do not recommend the proposal
Southern circle
CF
Not-Recommended
The site for proposal for diversion of forest into non forest purpose for Tlawng hnar recharging dam for Aug Imp. of Zobawk WSS was visited by DFO five times during June 2022 to March 2023 and after thorough inspection he have not recommended the project. I also visited the proposed site 18.4.2023, this inspection the river course was devoid of water and the river channel was totally dry. It was reported that there was another impounding dam 300.72mt away from the present proposed site in the upstream. DFO in his inspection note stated that since the other dam was already constructed a few hundred metres away and the present proposed dam if constructed will make the river drier down the stream. It is also agreed with the view made by DFO after many visits of the site and it is apprehended that there shall not be sufficient water in few hundreds metres away since the other dam has already captured the available water. The proposed area for diversion of forest as mentioned in the proposal is 0.1088Ha but the degradation it will be causing to the pristine forest and beyond the project sites. From the scrutiny of the secondary information and present inspection considering to the destruction of forest it will be causing and the expected result for benefit of community cost – benefit which can be overseen from the present situation of availability of water in the river channel the project is Not Recommended.
Yes
Nodal Officer
Not-Recommended
Observation of DFO and CF concerned not recommending the proposal.
Print
Checklist for State Nodal Officer
×