PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : MZ-01/2019
1. Location of the project/Scheme : Mizoram
 (i) State / Union Territory : Mizoram  (ii) District : Mamit  (iii) Forest Division : Mamit  (iv) Area of forest land proposed for diversion (in ha.) : 104.77  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Mamit104.77Forest by dictionary meaning
Total 104.77
Division 1. : Mamit
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Mamit104.77
Total104.77
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
1104.770.7Eco 1
Total. 104.77


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Tectona GrandisTeak4115304872144111
2Tamarindus IndicaTengtere010000
3Emblica OfficinalisSunhlu482100
4Anacardium Occidentaleagar012000
5Andrpgraphis Paniculata010100
6Adina cordifolia010100
7Bamboomautak3275100000
8Lagerstroemia ParvifloraThlado012131347970
9Chukrasia TabularisTei12472137311
10Brassaia Actinophylla023100
11OthersArchangkawm224510
12Albizzia lebbeckThingawke012710
13Adena Cardifolia21316100
14Gmelin ArboreaThlanvawng1737715170
15Artocarpus HeterophyllusTatkawng0213421111
16Phoebe Attenuata Nees.Bulbawr011213113
17Chukrasia TabularisTei073210
18Syzigium CuminiLenhmui022100
19Mesua fereaHerse012110
20Chukrasia TabularisZawngtei023211
21Ficus ReligiosaHmawng000100
22Ficus BengalensisBung001010
23Tamarindus indicusTengtere027100
Total 33218 829702 726194 17
Sub Total (No of Trees.) 35686


5. Working plan prescription for the forest land proposed for diversion : NA
6. Brief note on vulnerability of the forest area to erosion : The area is with limited vulnerability, because of the fact that the Transmission line will not disturb the undergrowths
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : .05
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Presence of wildlife is nominal
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : Yes
  Details and comments on the impact of Project on such areas : Impact is little and mitigation plan has been prepared and submitted along with Wildlife proposal (proposal no: FP/MZ/39315/2019)
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : Yes
  Details and comments on the impact of Project on such areas : Impact is little and mitigation plan has been prepared and submitted along with Wildlife proposal
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 355.278
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
11210Teirei RRFSaithah1    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
NIL

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Mamit30250027410057.70330.3509/03/20200.3556.633
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
MamitNorthern circleDFOYesOne22/02/2020
 Northern circleCFYesOne13/03/2020
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
MamitNorthern circleDFO RecommendedAs attached
Northern circleCF RecommendedAs attachedYes
Nodal Officer RecommendedAs attached
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
MizoramState SecretaryRecommended20/04/2020 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
ShillongRegional Office3-MZ A 044/2020-SHI15/01/2021
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/MZ/TRANS/39315/2019TRANS393152019403147,667,179.35147,667,179.3516/03/20216686Corporation BankCorporation Bank (Challan)26/02/202108/03/2021
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 213   (iii). No. of Maintenance years: 8   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)213
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : Saithah Forest Range, West Phaileng Beat below Kawnmawi village inside Teirei RRF under West Phaileng Beat in Mamit Forest Division   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Teirei RRFRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/MZ/TRANS/39315/201914 Dec 2021No DataAs per DFO, Mamit report, 33 nos. of encroachers within the proposed CA area of 132 KV line between W.Phaileng to Marpara
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/MZ/TRANS/39315/201917 Jan 2022
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/MZ/TRANS/39315/2019Proposal for diversion of 104.77hectare of land in Dampa Tiger Reserve for construction of 132 kV/ West Phaileng to Marpara17 Feb 2022
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/MZ/TRANS/39315/201909 Dec 2021APPROVED