1. Location of the project/Scheme : Madhya Pradesh
 (i) State / Union Territory : Madhya Pradesh  (ii) District : Dewas  (iii) Forest Division : Dewas(T)  (iv) Area of forest land proposed for diversion (in ha.) : 40.053  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Dewas(T)39.367Reserved Forest
Total 39.367
Division 1. : Dewas(T)
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Dewas39.367
Total39.367
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
112.420.6Eco 3
226.9470.3Eco 3
Total. 39.367


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Tectona GrandisTeak11163098150068418971
2Misc. SpeciesSatkata908168469334411223
Total 2024 47822193 1028301 94
Sub Total (No of Trees.) 10422


5. Working plan prescription for the forest land proposed for diversion : The compartment are in following working circle Range Dewas : RF 21, (RDF) RF 20 (RDF), RF 28 (Plantation) RangePanigaon : - RF131(SCI), RF104(IWC), RF105(RDF), RF133(RDF), RF 149 (VVN) Range Bagali : RF844 (IWC) Range Jinwanee : RF 95(RDF), RF 96(RDF), RF 97(RDF), RF 100(RDF) 784 (IWC)
6. Brief note on vulnerability of the forest area to erosion : -
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Leopard, Jackal, Hyena, Langor. Hare, Blue bull, Barking deer, Monkey etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 41140000
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1140PFDewas46    View file
2245PFDewas46    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Tree Goshwara
2 TS
3 Project Report
4 minimum forest

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Dewas702000203096.426387.26453016/06/202318291.7171620.407
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Dewas(T)Ujjain(T)DFOYesOne14/06/2023
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Dewas(T)Ujjain(T)DFO RecommendedIn order to add in the efforts for the rapid economic growth of area in tune with the economic growth of the state and country, safe and efficient movement of people and goods is essential. Therefore, rehabilitation and upgrading project road to 4 lane divided carriage way configuration of Indore Harda Section of NH 59 A is needed with proper engineering improvements and enforcement of the rules and regulations of the road/Indian Road Congress IRC Guidelines, so that there should also be a marked reduction in road traffic accidents and smooth flow of traffic. Hence, 4 lane up gradation Indore – Harda Section of NH 47 Old NH 59A A will contribute in alleviation of the current poor conditions of the project road connecting the villages and towns, with one another and to the National Highway network for the benefit of the road users at large
Ujjain(T)CF RecommendedForest land required is bare minimum for the project. Hence the proposal recommended for acceptance. Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Madhya PradeshState SecretaryRecommended14/11/2023.State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
BhopalRegional Office6-MPR043/2023-BHO18/06/2024
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/MP/ROAD/149883/2021ROAD149883202130448,365,903.0048,365,900.0015/10/2024CNRBR52024101590868170Union Bank Of IndiaNEFT/RTGS (Challan)05/07/202411/07/2024
FP/MP/ROAD/149883/2021ROAD149883202107756,301,895.0056,301,900.0024/02/2025CNRBR52025022450572714Union Bank Of IndiaNEFT/RTGS (Challan)NANA
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 40.053   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)40.053
  Status of CA Land so identified : Non Forest Area   Site Name : NIL   Location Details : NIL   Uploaded GPS File :   Uploaded Scanned copy of Map :   Whether land Mutated or not : No
Status of CA Land so identified
District Name. Name of Tehsil.
DewasTonk Khurd
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/MP/ROAD/149883/202107 Mar 2025No Dataverify.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/MP/ROAD/149883/202107 Mar 2025
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/MP/ROAD/149883/2021 20 Mar 2025
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter