PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
MP-0128/2017
1.
Location of the project/Scheme :
Madhya Pradesh
(i)
State / Union Territory :
Madhya Pradesh
(ii)
District :
Alirajpur
(iii)
Forest Division :
Alirajpur
 (iv)
Area of forest land proposed for diversion (in ha.) :
14.958
 (v)
Category of the Proposal:
Irrigation
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Alirajpur
1.242
Reserved Forest
2
Alirajpur
13.716
Protected Forest
Total
14.958
Division 1. : Alirajpur
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Alirajpur
14.958
Total
14.958
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
14.958
0.4
Eco 3
Total.
14.958
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Tectona Grandis
Teak
0
364
1
0
0
0
2
Misc. Species
Satkata
0
606
15
3
3
0
Total
0
970
16
3
3
0
Sub Total (No of Trees.)
992
(iii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL-2 meter
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
(iv)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL-4 meter
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
5.
Working plan prescription for the forest land proposed for diversion :
Plantation Working Circle - P704 P679 Fuel and Fodder WC - P705 RF849 P710 P707 P711 RDF WC - P698 P697 P681 VIVIDH - P709 P682
6.
Brief note on vulnerability of the forest area to erosion :
Not applicable because it is a pipeline project
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Jackal,Hyna,Fox,Peacock,Panther etc.as per detail attached
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
(i).
Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no
District Name
Village
Area(in ha.)
khasra
KML file
Present Owner file
1
Alirajpur
JHANDANA
17
7 & 45
(ii).
Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iii).
Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A:
(iv).
Copy of CA scheme details:
(iv).
Copy of CA scheme details:
NA
Additional information Details
S. No.
Documents
Remarks
1
CA Georeference Map
2
CA SOI Toposheet
3
Collector CA Order
4
Tree Counting
5
minimum forest area certificate
6
Wild Life
7
FRA Certificate
8
Georeference Map of proposed area
9
SOI Toposheet of proposed area
10
EE Letter for CA Land
11
CA land google map
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Alirajpur
333300
96802.120
1195.090
14
3.900
13/02/2018
3.900
1141.056
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Alirajpur
Indore(T)
DFO
Yes
One
12/02/2018
Indore(T)
CF
No
No Data
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Alirajpur
Indore(T)
DFO
Recommended
To provide better irrigation water to about 35000 ha. of catchment command area in Alirajpur Districts, it is recommended to divert 14.958 Ha of Forest land to user agency Executive Engineer OSP Canal Division Kukshi District Dhar narmada Valley Development Authirity fot proposed construction of Alirajpur Lift Irrigation Scheme.
Indore(T)
CF
Recommended
CCF INDORE LETTER NUMBER 1519 DATED 24-02-2018
Yes
Nodal Officer
Recommended
Construction of Alirajpur Lift Irrigation Scheme (14.958 ha. forest land) is recommended in favour of Water Resources Department.
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Madhya Pradesh
State Secretary
Recommended
12/03/2018
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Bhopal
Regional Office
6-MPC019/2018-BHO
07/05/2018
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/MP/IRRIG/29973/2017
IRRIG299732017445
20,358,919.00
20,358,919.00
24/05/2018
SBIN918144195603
Corporation Bank
NEFT/RTGS (Challan)
15/05/2018
15/05/2018
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
17
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
17
Status of CA Land so identified :
Non Forest Area
Site Name :
JHANDANA
Location Details :
NEAR JHANDANA VILLAGE OF SONDWA TEHSIL DISTRICT ALIRAJPUR
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Indore(T)
Jhabua(T)
Umrali
694
15 Feb 2018
17
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/MP/IRRIG/29973/2017
31 May 2018
No Data
Verified.
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/MP/IRRIG/29973/2017
31 May 2018
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/MP/IRRIG/29973/2017
01 Jun 2018
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/MP/IRRIG/29973/2017
20 Aug 2018
APPROVED
Print
Checklist for State Nodal Officer
×