PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : MN-027/2020
1. Location of the project/Scheme : Manipur
 (i) State / Union Territory : Manipur  (ii) District : Imphal West  (iii) Forest Division : Central Forest Division,Imphal  (iv) Area of forest land proposed for diversion (in ha.) : 0.472  (v)

Category of the Proposal: Drinking Water
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Central Forest Division,Imphal0.472Reserved Forest
Total 0.472
Division 1. : Central Forest Division,Imphal
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Imphal West0.472
Total0.472
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.47215Eco 1
Total. 0.472


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersChristmas Tree100000
2OthersAgar010000
3Michelia ChampakaLeihao010000
4Mimusops ElengiBokul100000
5Bauhinia ParvifloraChingthrao200000
6Mangifera IndicaHeinou1421000
7Santalum AlbumChandan100000
8Lagerstroemia ParvifloraJarol010000
9Artocarpus HeterophyllusTheibong313000
10OthersYongchak210000
11Tooni CedrelaTairen111000
12Calistemon LanceolatusBottle brush520000
13Eucalyptus sppNashik010000
14Pinepine000100
15Schima Wallichii Choisushoi100000
16Othersnobap010000
17Albizzia lebbeckAlbizzia000100
18Syzigium Cuminijam100000
19Delonix Regiagulmohar000002
20OthersChinese teak1060000
21OthersYongchak001000
22Schima Wallichii ChoisUshoi100000
23Tooni CedrelaTairen010000
Total 43 196 20 2
Sub Total (No of Trees.) 72


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : As the area is presently a degraded Forest land, the area is prone to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Indian Rock python,Barking deer, Slow loris etc
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 2.05
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.944Langol Extension Reserved ForestSadar West Range6    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 certificate of Non availability of land for CA
2 CA Estimate

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Imphal West669002200022.651627.28617/08/202127.2860
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Central Forest Division,ImphalCentral Forest CircleDFOYesOne01/03/2024
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Central Forest Division,ImphalCentral Forest CircleDFO RecommendedThe density of the forest cannot be ascertained as the area has already been under violation, and all Forest of Manipur falls under eco class 1, so the area must also be under eco class 1. As the area proposed for diversion is meant for the much needed water supply to the urban and rural masses in the nearby villages and city. Hence, the proposal for diversion in recommended.
Central Forest CircleCF RecommendedAs the area proposal is meant for the much needed water supply to the urban and rural masses in the nearby villages and city. Hence, the proposal for diversion is recommended. Yes