PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : MN-05/2016
1. Location of the project/Scheme : Manipur
 (i) State / Union Territory : Manipur  (ii) District : Churachandpur,Thoubal  (iii) Forest Division : Southern Forest Division,Churachandpur,Thoubal Forest Division  (iv) Area of forest land proposed for diversion (in ha.) : 18.414  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Southern Forest Division,Churachandpur7.479Reserved Forest
2Thoubal Forest Division10.935Reserved Forest
Total 18.414
Division 1. : Southern Forest Division,Churachandpur
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Churachandpur7.479
Total7.479
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
17.47940Eco 1
Total. 7.479


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Lagerstroemia ParvifloraAkman02752117500
2Bauhinia ParvifloraChingthtao01870000
3Gmelina ArboreaWang018691873700
4Calotrophis GigantiumMondol057437000
5Cedrela Febrifuga BlumeTairen06731122500
6Ficus RacemosaHeiyit0252250250
7Bombax CeibaTera0621225250
8Schima Wallichii ChoisUsoi01121121200
9PineUchan012524981000
10Eucalyptus (Seed Orgin)Nasik018747422500
11Cassia SiameaSahi-Kuhi09970000
12Emblica OfficinalisHeikru0500000
13Pakia BiglandulosaYongchak001252500
14Artocarpus HeterophyllusTheibong00012500
15Mangifera IndicaHeinou0100112000
16Pyrularia EdulisQuercus (Uyung)05610000
Total 0 57971856 135950 0
Sub Total (No of Trees.) 9062


5. Working plan prescription for the forest land proposed for diversion : Plantation Working Circle
6. Brief note on vulnerability of the forest area to erosion : As the proposed transmission line goes in the form of a strip, erosion may not be significant
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Apart from barking deer and other reptiles like snakes, no other rare and endangered species are found in the area
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): Yes
  Details of Protected Area and comments on the impact of Project on the ESZ : The project site within part Dampi RF of Southern Forest Division is about 5.5 km from Keibul Lamjao National Park separated by human settlements may have little or no impact on the protected area.
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 47.18
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1115DampiChurachandpur Range17    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Calculation of NPV uploaded
Division 2. : Thoubal Forest Division
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Thoubal10.935
Total10.935
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.2650Eco 1
210.67530Eco 1
Total. 10.935


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1PineUchan02332778490
2OthersQuercus0250000
3Castanopsis TribuloidesSahi010515000
4Castanopsis TribuloidesThangji024000
5Alnus NepalensisPareng01410000
6Mangifera IndicaHeinou066200
7Tooni CedrelaTairen0227400
8OthersUthum001000
9Schima Wallichii ChoisUsoi0475110
10OthersTom heinou079700
11OthersTumitla0131000
12Erythrina IndicaKurao020000
13Gmelina ArboreaWang0547100
14Melia Azadirachta000100
15OthersChorphon021000
16Artocarpus HeterophyllusTheibong001000
17OthersHeirit (Ficus semicordata)060000
18OthersNgaang (Zanthaylum budrunga)080000
19OthersUnigthou (Phoebe hainesiana)0110000
20OthersYongchak (Parkia roxburghii)010000
21OthersUyung (Quercus serrata)0181000
22Eucalyptus sppNasik02527300
23Bombax CeibaTera020100
24Albezzia LabbeckUil052000
25Rhus Spp.Heimang010000
26OthersAakman (Lannea grandis)0137000
27OthersPheija (Wendlandia glabra)031000
28Chukrasia TabularisTaimareng010000
29Syzigium CuminiSileima072410
30Albzzia Spp.Khok090200
31Cassia FistulaChauhi020000
32OthersChingthrao (Bauhinia purpurea)020000
33OthersThangji (Castanopsis hystrix)050000
34OthersShaamba (Oroxylum indicum)020000
35OthersKuhi (Pasania pachyphylla)004000
36OthersMissi (Stereospermum chelonioides)001000
37OthersLaangjan (Sterculia villosa)060000
38Erythrina IndicaKurao030000
39OthersHeikreng manbi (Trema orientalis)020000
40Artocarpus HeterophyllusTheibong010000
Total 0 665389 11011 0
Sub Total (No of Trees.) 1175


5. Working plan prescription for the forest land proposed for diversion : the forest land proposed for diversion falls under Plantation and Biodiversity Working Circle.
6. Brief note on vulnerability of the forest area to erosion : Being linear in nature with a narrow width, the project is not likely to have significant issues pertaining to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Hog Deer, Pangolin, Jungle cat etc
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): Yes
  Details of Protected Area and comments on the impact of Project on the ESZ : About 10 kms of the length of the transmission line will pass through the ESZ of the Keibulamjao National Park. As this 10kms stretch would fall mostly on agriculture fields, the impact might be minimal.
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : Yes
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 41.28
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1122Thonga Mondum Reserve ForestKakcliiiig Range4    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 NPV calculation for the forest area falling within Thoubal Forest Division

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Churachandpur457000415700228.264142.2201/10/2016142.220
2Thoubal51400100002.514235.028409/11/20165.02840
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Southern Forest Division,ChurachandpurSouthern Forest CircleDFOYesTwo17/10/2016,04/11/2016
 Central Forest CircleCFNoNo Data
Thoubal Forest DivisionCentral Forest CircleDFOYesOne27/09/2016
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Southern Forest Division,ChurachandpurSouthern Forest CircleDFO RecommendedThe proposed diversion of forest land is in the form of a narrow strip which is unavoidable and to the barest minimum for stringing the 132 KV transmission line which the district has acute needed for years together. The proposal is therefore recommended.
Thoubal Forest DivisionCentral Forest CircleDFO RecommendedRecommendation for 10.935 ha is made as this much area of the proposed diversion falls within the Thoubal Forest Division
Southern Forest CircleCF RecommendedStringing of transmission line for distribution of power supply in the stateYes
Central Forest CircleCF RecommendedThe project will provide power supply to the people living in Kakching and Churachandpur areas.Yes
Nodal Officer RecommendedRecommended for diversion of 18.414 ha of forest land as the project is a public utility project to be managed by the State Government.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
ManipurState SecretaryRecommended04/05/2017 Recommended State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
ShillongRegional Office3-MNC 020/2017-SHI14/11/2022
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/MN/TRANS/20059/2016Approved In-PrincipleNo Data