PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : MN-013/2018
1. Location of the project/Scheme : Manipur
 (i) State / Union Territory : Manipur  (ii) District : Tamenglong  (iii) Forest Division : Western Forest Division,Tamenglong  (iv) Area of forest land proposed for diversion (in ha.) : 1.113  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Western Forest Division,Tamenglong1.113Unclassed Forests
Total 1.113
Division 1. : Western Forest Division,Tamenglong
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Tamenglong1.113
Total1.113
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
11.11340Eco 1
Total. 1.113


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Mangifera IndicaHeinou050000
2Schima Wallichii ChoisUsoi051001
3Tectona GrandisTeak085300
4Gmelin ArboreaWang059201
5Tamarindus IndicaMange031002
6Mesua fereaNagesor010000
7Duabanga GrandifloraTal0118100
8Artocarpus HeterophyllusTheibong000010
9Bamboobamboo30000000
10Bombax CeibaTera001000
11Terminalia MyriocarpaTolhao035000
12OthersYongchak062100
13OthersTumitla020010
14OthersCham075021
15OthersUyung003100
16OthersHeining010000
17OthersHeirikokthong000001
18OthersLitchi001000
Total 300 5741 84 6
Sub Total (No of Trees.) 416


5. Working plan prescription for the forest land proposed for diversion : Plantation Working Circle
6. Brief note on vulnerability of the forest area to erosion : Vulnerability to soil erosion is negligible.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Jungle Cat, Leopard Cat, Kalij Pheasant, Flying Squirrel etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : Yes
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 6.217
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
113Community ForestNutigba Range82    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Georeference map of CA
2 Calculation of NPV
3 Certificate of non-availability of non-forest land for CA
4 Survey of India Toposheet Map of CA

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Tamenglong3282023046561575.17983130.50831/01/20192950.7960
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Western Forest Division,TamenglongWestern Forest CircleDFOYesTwo01/10/2018,05/01/2019
 Western Forest CircleCFYesOne25/02/2019
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Western Forest Division,TamenglongWestern Forest CircleDFO RecommendedThe existing Irang Bridge is in a very bad condition which often leads to frequent blockage of passage of vehicles in the region, thereby obstructing the movement of goods and services in the State. The bridge on the Irang river serves as the connecting link between Imphal and various parts of the State like Tamenglong, Nungba etc. and also with the State of Assam through Jiribam and further to other North Eastern States. The area proposed for diversion of forest land is also barest minimum and will not affect much to the forests and wildlife of the area.
Western Forest CircleCF RecommendedThe existing Irang Bridge is in a very bad condition which often leads to frequent blockage of passage of vehicles in the region, thereby obstructing the movement of goods and services in the State. The bridge on the Irang river serves as the connecting link between Imphal and various parts of the State like Tamenglong, Nungba etc. and also with the State of Assam through Jiribam and further to other North Eastern States. The area proposed for diversion of forest land is also barest minimum and will not affect much to the forests and wildlife of the area. Yes
Nodal Officer RecommendedThe existing Irang Bridge is in a very bad condition which often leads to frequent blockage of passage of vehicles in the region, thereby obstructing the movement of goods and services in the State. The bridge on the Irang river serves as the connecting link between Imphal and various parts of the State like Tamenglong, Nungba etc. and also with the State of Assam through Jiribam and further to other North Eastern States. The area proposed for diversion of forest land is also barest minimum and will not affect much to the forests and wildlife of the area.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
ManipurState SecretaryRecommended20/06/2019 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
ShillongRegional Office3-MN B 057/2020-SHI01/03/2021
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/MN/ROAD/35012/2018ROAD3501220182821,460,500.001,460,500.00Union Bank Of IndiaNEFT/RTGS (Challan)20/07/202122/07/2021
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/MN/ROAD/35012/2018Approved In-PrincipleNo Data