PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : MN-05/2015
1. Location of the project/Scheme : Manipur
 (i) State / Union Territory : Manipur  (ii) District : Imphal East  (iii) Forest Division : Central Forest Division,Imphal  (iv) Area of forest land proposed for diversion (in ha.) : 0.1318  (v)

Category of the Proposal: Irrigation
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Central Forest Division,Imphal0.1318Reserved Forest
Total 0.1318
Division 1. : Central Forest Division,Imphal
3. District wise area to be diverted in the division
S. No. DistrictArea(in ha.)
NIL
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.131830Eco 1
Total. 0.1318


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

(iii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-2 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

(iv) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-4 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

5. Working plan prescription for the forest land proposed for diversion : Plantation and Fuel and Fodder Working Circle
6. Brief note on vulnerability of the forest area to erosion : The area is moderately prone to erosion as the pro
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Indian Rock python, Pangolin, Barking deer etc are reported from the Reserved Forests. However, the project will not disturb wildlife as the work is construction of RCC underground tunnel passing thro
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 0
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
NO Data
(ii). Copy of CA scheme details: NA (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.: (V). Copy of NOC from Competent Authority:
Additional information Details
S. No. DocumentsRemarks
NIL

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Imphal East66922013.2571621.64610/06/201521.0460
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Central Forest Division,ImphalCentral Forest CircleDFOYesOne06/06/2015
 Central Forest CircleCFYesOne12/06/2015
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Central Forest Division,ImphalCentral Forest CircleDFO RecommendedConsidering the need for irrigation of Culturable Command Area (CCA), the proposal submitted by the IFCD, Manipur for diversion of 0.1318 Ha forest land inside the Sambei Purum Reserved Forests for construction of RCC tunnel for conveyance of water from the main right canal of Dolaithabi Project, Manipur is recommended subject to the following conditions: a) No tree shall be felled or damaged during the construction of tunnel b) Establishment of labour camps/huts shall not be allowed inside th
Central Forest CircleCF RecommendedRecommended, as the project is for the purpose of enhancing the agricultural productivity of the cultivated area of Imphal East District by providing irrigation facility resulting in improvement of the economic condition of the people of the one of the most undeveloped part of the state. The area proposed by the Irrigation & Flood Control Department,Manipur for the project is found to be the barest minimum required and no other suitable non forest land is available in the vicinity. The proposalYes
Nodal Officer Recommended
quetiapin ritalin quetiapin mod angst quetiapin wirkstoff
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
ManipurState SecretaryRecommended23/07/2016 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
ShillongRegional OfficeNo.20/21/2015-For&Envt26/08/2016
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/MN/IRRIG/12486/2015Approved In-PrincipleNo Data