PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : ML-02/2022
1. Location of the project/Scheme : Meghalaya
 (i) State / Union Territory : Meghalaya  (ii) District : East Khasi Hills  (iii) Forest Division : Khasi Hills  (iv) Area of forest land proposed for diversion (in ha.) : 0.11  (v)

Category of the Proposal: Pipeline
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Khasi Hills0.05Private Forest
2Khasi Hills0.023Reserved Forest
3Khasi Hills0.033Protected Forest
Total 0.106
Division 1. : Khasi Hills
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1East Khasi Hills0.11
Total0.11
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.0560Eco 5
20.02380Eco 5
30.03380Eco 5
Total. 0.106


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1PineDiengkseh001000
Total 0 01 00 0
Sub Total (No of Trees.) 1


5. Working plan prescription for the forest land proposed for diversion : Riat Laban Reserve Forest, Laitkor Protected Forest & Law Syiem (Private Deemed Forest)
6. Brief note on vulnerability of the forest area to erosion : Not prone to soil erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Nil
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 0.88194
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.1Upper Shillong Protected ForestShillong South Compartment 5    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.: (V). Copy of NOC from Competent Authority:
Additional information Details
S. No. DocumentsRemarks
1

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1East Khasi Hills274800175100205.3798575.5095620/04/202200
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Khasi HillsKhasi&Jaintia HillsDFOYesOne01/04/2022
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Khasi HillsKhasi&Jaintia HillsDFO RecommendedThe above proposal is to provide portable drinking water link to the sump at the pumping station of Air force station, Sangmein, hence the Proposal is recommended.
Khasi&Jaintia HillsCF RecommendedThe above proposal is essential to provide portable drinking water link to the sump at the pumping station of Air force station, Sangmein. The Proposal is recommended hence.Yes
Nodal Officer RecommendedThe proposal pertains to diversion of 0.11 Ha. of forest land for laying of DI Pipes through Law Syiem Deemed Forest 0.05 ha , Riat Laban Reserve Forest 0.023 ha and Laitkor Protected Forest 0.033 ha for providing water supply to the Air Force Station, Air Command Complex, Laitkor. Perused the views of the Conservator of Forests Territorial , Khasi & Jaintia Hills in Part III wherein it is observed that there are no trees to be felled. Since the project is of great importance to the Air Force Station, I therefore, concur to the views of the Divisional Forest Officer T and the Conservator of Forests T for diversion of the forest land for the aforementioned purpose.
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/ML/Pipeline/151928/2022PIPELINE1519282022545246,232.00246,232.002023-04-17926342Union Bank Of IndiaNEFT/RTGS (Challan)2023-04-112023-04-12