PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : MH-06/2021
1. Location of the project/Scheme : Maharashtra
 (i) State / Union Territory : Maharashtra  (ii) District : palghar  (iii) Forest Division : Dahanu  (iv) Area of forest land proposed for diversion (in ha.) : 20.5983  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Dahanu8.8479Protected Forest
2Dahanu11.7504Mangrove
Total 20.5983
Division 1. : Dahanu
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1palghar20.5983
Total20.5983
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
120.59830.4Eco 1
Total. 20.5983


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Acacia CatechuKhair256713110
2Tectona GrandisTeak371100
3Terminalia TomentosaAin172414610
4Rhizopora ApiculataMangrove1268819021691000
5OthersInjayali103112902711324588
Total 13764 3290468 15047 88
Sub Total (No of Trees.) 17807


5. Working plan prescription for the forest land proposed for diversion : No
6. Brief note on vulnerability of the forest area to erosion : Due to high rainfall the forest is prone to soil erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : Yes
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 30620811
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1120.00RFMukhed568 /B/1    View file
2222.00RFHimayatnagar322    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
NIL

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1palghar5944002306241318.176151910.510031/03/2022910.5100164.1200
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
DahanuThaneDFOYesOne14/10/2022
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
DahanuThaneDFO Recommended132 kv D/C LILO on 132 kv Boisar Dahanu MIDC transmission line for 220 kv Palghar Substation. Further, in present scenario there is heavy load sheding due to lack of power. This transmission line for proposed belt is very essential to construct and operate 132 kv D/C LILO on 132 kv Boisar Dahanu transmission line for proposed 220 kv Palgar substation for zero load sheding to be implemented w.e.f. 2021 and for industrial growth of Palghar District for future upcoming Maharashtra government projects. Hence this public infrastructure is of upmost need and the forest land involved is unavoidable due to the existing alignment of the non forest land. Hence, the proposal is recommended for acceptance. The NPV rate to be charged for the forest land is to be at the rate of Eco Class I. The Project Authority should bear the necessary amount for Survey and demarcation, Artificial Bird Nests, along with the accessories necessary for the effective protection of balance forest area.The Project authority should ensure that only minimum number of trees should be felled and maximum trees are to be retained in the ROW.Medicinal plants,Dwarf species and mangrove restoration could be taken up under the transmission line in the diverted area. The proposal is being recommended for acceptance.
ThaneCF RecommendedProposal recommended for acceptance and necessary approval.Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
MaharashtraState SecretaryRecommended23/08/2023RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
NagpurRegional OfficeFC-II/MH-225/2023-NGP06/05/2024
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/MH/TRANS/116830/2020TRANS116830202015287,086,734.0087,086,700.0020/08/2024 TO TRANSFER-INB RTGS UTR NO: SBINR1202408204279Union Bank Of IndiaNEFT/RTGS (Challan)03/08/202405/08/2024
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 42   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 2
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)20
  Status of CA Land so identified : Forest Area   Site Name : Alegaon Tal Mukhed Dist Nanded   Location Details : Alegaon Map   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Reserved ForestRF
  No. of patches : 2
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
2Block(Polygon)22
  Status of CA Land so identified : Forest Area   Site Name : Mangrul Tal Himaytnagar Dist Nanded   Location Details : Mangrul map   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Reserved ForestRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/MH/TRANS/116830/202004 Sep 2024No DataVerified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/MH/TRANS/116830/202006 Sep 2024
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/MH/TRANS/116830/2020Recommended23 Sep 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/MH/TRANS/116830/202008 Oct 2024APPROVED