PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
MH-065/2020
1.
Location of the project/Scheme :
Maharashtra
(i)
State / Union Territory :
Maharashtra
(ii)
District :
Washim
(iii)
Forest Division :
Washim
 (iv)
Area of forest land proposed for diversion (in ha.) :
0.72
 (v)
Category of the Proposal:
Road
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Washim
0.72
Reserved Forest
Total
0.72
Division 1. : Washim
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Washim
0.72
Total
0.72
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
0.72
0.01
Eco 3
Total.
0.72
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
5.
Working plan prescription for the forest land proposed for diversion :
Fodder improvement working circle
6.
Brief note on vulnerability of the forest area to erosion :
Proposed area is not vulnerable to soil erosion
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
wildlife not found during site inspection
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
Yes
(a)Details of violation(s):
Agency had completely excavated 222m of earlier ta
(b) Period of Work done(year) :
2019
(c) Area of forest land involved in violation (in ha.) :
0.222
S. No.
Name of person responsible for violation
Designation & Address of person responsible for violation
Action taken against the person responsible for violation
1
i Ravindra Malwat ii K Baliya iii B S Rao
i Executive Engineer MSRDC Ltd Washim ii Team leader Athority Engineer TASPL Pvt Ltd iii R R Construction and Infrastructure India Pvt Ltd Hyderabad
Disciplinary action against err officer is proposed
12.
Whether work in violation is still in progres(Yes/No) :
No
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
13.0
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
1.5
RF
Karanja
C111
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Washim
517810
39321
402.13
26
0
05/11/2020
0
457
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Washim
Yavatmal
DFO
Yes
One
06/07/2020
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Washim
Yavatmal
DFO
Recommended
Road was already Passing through this portion of Forest Land. no alternative land is available for this hence it is recommended to accept the proposal.
Yavatmal
CF
Recommended
The proposed diversion of 0.72 ha. forest land is required for widening and curve improvement of already existing road in view of the safety and betterment of existing road, the proposal is recommended for sanction under FCA 1980
Yes
Nodal Officer
Recommended
Road was already Passing through this portion of Forest Land. no alternative land is available for this hence it is recommended to accept the proposal.
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Maharashtra
State Secretary
Recommended
10/11/2020
Nodal Officer has recommended the proposal for diversion of forest land
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Nagpur
Regional Office
FC-I/MH-196/2020-NGP
10/11/2020
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/MH/ROAD/45456/2020
ROAD454562020328
1,843,581.65
1,843,582.00
05/04/2021
ICIC409400104448
Union Bank Of India
NEFT/RTGS (Challan)
NA
NA
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
0.72
(iii). No. of Maintenance years:
7
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Strip(Avenue)
0.72
Status of CA Land so identified :
Forest Area
Site Name :
Diversion of forest land for the project "Rehabilitation and Upgradation of newly declared Badnera road Nagzari kharda and Murtizapur to Kherda NH 161 E section from Washim to Dastapure Ch. 0.000 to
Location Details :
Mouje Masola Tq. Mangrulpir Distt. Washim (MS)
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
Mouje Masola Tq. Mangrulpir Distt. Washim, (MS)
RF
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/MH/ROAD/45456/2020
12 Aug 2024
No Data
verified
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/MH/ROAD/45456/2020
16 Aug 2024
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/MH/ROAD/45456/2020
Recommended
20 Aug 2024
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/MH/ROAD/45456/2020
11 Nov 2024
APPROVED
Print
Checklist for State Nodal Officer
×