PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : MH-0211/2019
1. Location of the project/Scheme : Maharashtra
 (i) State / Union Territory : Maharashtra  (ii) District : Satara  (iii) Forest Division : Satara  (iv) Area of forest land proposed for diversion (in ha.) : 0.0979  (v)

Category of the Proposal: Pipeline
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Satara0.0663Reserved Forest
2Satara0.0316Identified Forest
Total 0.0979
Division 1. : Satara
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Satara0.0979
Total0.0979
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.09790.4Eco 3
Total. 0.0979


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersNo tree felling000000
Total 0 00 00 0
Sub Total (No of Trees.) 0


5. Working plan prescription for the forest land proposed for diversion : The working plan for Satara Forest Division was expired on 31 March 2020. New Working Plan for Satara Forest Division yet to be prepared. As per the old working plan, the proposed area for diversion falls under improvement working circle As per old working plan, prescription for improvement working circle is as under - 1. To improve and enrich the condition of existing growing stock. 2. To manage the run off water and to improve the water regime. 3. To maintain and improve soil cove by undertaking plantation and smc works. 4. To meet demands of local people for fuel wood and timber.
6. Brief note on vulnerability of the forest area to erosion : The forest land is degraded type so forest to be diverted is not vulnerable to erosio
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 00
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Indian pangolin, Indian wild boar, peacock, hare Etc. found around the project area.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 8.69
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
111RFWai43    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 certificate 12 to15
2 certificate 1 & 2
3 certificate 17
4 area statement
5 certificate 27 and 29
6 manual part 2
7 certificate 8 to10
8 site inspection report
9 7 12
10 DGPS
11 Georeference map merged
12 Varade Village map
13 Anavadi Village map
14 Mouje anvadi - CA Area markedwith Gut no marking
15 Certificate no 5
16 Kodoli Village map
17 Toposheet
18 Vahagaon village map
19 Village maps
20 CA land toposheet
21 Mouje anvadi - CA Area marked with Topography

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Satara10484001567641062.1791179.4531/03/2021161.46650.59
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
SataraKolhapurDFOYesOne03/02/2022
 KolhapurCFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
SataraKolhapurDFO RecommendedThis proposal is recommended for acceptance.
KolhapurCF RecommendedRecommended for sanction Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
MaharashtraState SecretaryRecommended28/03/2023FLD 2323/C.R.55/F 10, State Govt. accorded In Principle approvalState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
NagpurState GovernmentFLD-2323/C.R.55/F-1027/03/2023
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/MH/Pipeline/43177/2019PIPELINE431772019912963,068.00963,068.0019/04/2023928790Union Bank Of IndiaNEFT/RTGS (Challan)04/04/202306/04/2023
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 1   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)1
  Status of CA Land so identified : Forest Area   Site Name : FC NO 43 ANAWADI FOREST   Location Details : DEGRADED FOREST F C NO 43 AT VILLAGE ANAWADI TAL. WAI DIST. SATARA   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
ANAWADIRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/MH/Pipeline/43177/201925 Apr 2023No DataVerified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/MH/Pipeline/43177/201928 Apr 2023
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/MH/Pipeline/43177/2019Recommended31 May 2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/MH/Pipeline/43177/201915 Sep 2023APPROVED