PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
MH-0211/2019
1.
Location of the project/Scheme :
Maharashtra
(i)
State / Union Territory :
Maharashtra
(ii)
District :
Satara
(iii)
Forest Division :
Satara
 (iv)
Area of forest land proposed for diversion (in ha.) :
0.0979
 (v)
Category of the Proposal:
Pipeline
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Satara
0.0663
Reserved Forest
2
Satara
0.0316
Identified Forest
Total
0.0979
Division 1. : Satara
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Satara
0.0979
Total
0.0979
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
0.0979
0.4
Eco 3
Total.
0.0979
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Others
No tree felling
0
0
0
0
0
0
Total
0
0
0
0
0
0
Sub Total (No of Trees.)
0
5.
Working plan prescription for the forest land proposed for diversion :
The working plan for Satara Forest Division was expired on 31 March 2020. New Working Plan for Satara Forest Division yet to be prepared. As per the old working plan, the proposed area for diversion falls under improvement working circle As per old working plan, prescription for improvement working circle is as under - 1. To improve and enrich the condition of existing growing stock. 2. To manage the run off water and to improve the water regime. 3. To maintain and improve soil cove by undertaking plantation and smc works. 4. To meet demands of local people for fuel wood and timber.
6.
Brief note on vulnerability of the forest area to erosion :
The forest land is degraded type so forest to be diverted is not vulnerable to erosio
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
00
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Indian pangolin, Indian wild boar, peacock, hare Etc. found around the project area.
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
8.69
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
1
RF
Wai
43
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
certificate 12 to15
2
certificate 1 & 2
3
certificate 17
4
area statement
5
certificate 27 and 29
6
manual part 2
7
certificate 8 to10
8
site inspection report
9
7 12
10
DGPS
11
Georeference map merged
12
Varade Village map
13
Anavadi Village map
14
Mouje anvadi - CA Area markedwith Gut no marking
15
Certificate no 5
16
Kodoli Village map
17
Toposheet
18
Vahagaon village map
19
Village maps
20
CA land toposheet
21
Mouje anvadi - CA Area marked with Topography
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Satara
1048400
156764
1062.17
91
179.45
31/03/2021
161.46
650.59
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Satara
Kolhapur
DFO
Yes
One
03/02/2022
Kolhapur
CF
No
No Data
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Satara
Kolhapur
DFO
Recommended
This proposal is recommended for acceptance.
Kolhapur
CF
Recommended
Recommended for sanction
Yes
Nodal Officer
Recommended
Recommended
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Maharashtra
State Secretary
Recommended
28/03/2023
FLD 2323/C.R.55/F 10, State Govt. accorded In Principle approval
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Nagpur
State Government
FLD-2323/C.R.55/F-10
27/03/2023
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/MH/Pipeline/43177/2019
PIPELINE431772019912
963,068.00
963,068.00
19/04/2023
928790
Union Bank Of India
NEFT/RTGS (Challan)
04/04/2023
06/04/2023
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
1
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
1
Status of CA Land so identified :
Forest Area
Site Name :
FC NO 43 ANAWADI FOREST
Location Details :
DEGRADED FOREST F C NO 43 AT VILLAGE ANAWADI TAL. WAI DIST. SATARA
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
ANAWADI
RF
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/MH/Pipeline/43177/2019
25 Apr 2023
No Data
Verified
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/MH/Pipeline/43177/2019
28 Apr 2023
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/MH/Pipeline/43177/2019
Recommended
31 May 2023
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/MH/Pipeline/43177/2019
15 Sep 2023
APPROVED
Print