PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : MH-057/2016
1. Location of the project/Scheme : Maharashtra
 (i) State / Union Territory : Maharashtra  (ii) District : Nagpur  (iii) Forest Division : Nagpur  (iv) Area of forest land proposed for diversion (in ha.) : 564  (v)

Category of the Proposal: Others
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Nagpur564Reserved Forest
Total 564
Division 1. : Nagpur
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Nagpur564
Total564
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
15640.2Eco 3
Total. 564


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1TeakTectona grandis 05082988800
2Acacia ArabicaBabul03503851055318
3OthersKalam0158105000
4Terminalia ArjunaArjun/Arjuna0127870015800
5Diasporus MelanoxylonTendu021018000
6Dalburgia SisooSisu03535000
7Bombox CeibaKatsavar017512388180
8Terminalia BellaricaBehada0158881800
9Terminalia CatappaPanjara012317521000
10OthersLokhandi0180000
11Acacia leucophloeaHiwar01900140021000
12Aegle MarmelosBel0530000
13OthersUmbar01818000
14Acacia CatechuKhair0119018000
15Albizia ProceraShiras03501800
16Prasophis sinereriaShindi028011201800
17Azadirachta IndicaNeem014053000
18Butea MonospermaPalas0508315175880
19OthersApata (Bauhinia racemosa) 0123351800
20OthersChichva (Abbezia lebeck) 0350000
21OthersAali08818000
22OthersDhavda (Anogeissus latifolia) 01818000
23Tamarindus IndicaChinch0035000
24OthersKardai (Anogeissus pendula) 033312318180
25OthersMurdi0180000
26OthersKumbhi (Careya arborea) 0350000
27Zizyphus JujubaBor0350000
28OthersKau024518000
29Grewia TiliaefoliaDhaman0180000
30OthersVaghati0350000
31Terminalia TomentosaYen07001800
Total 0 81905098 1142177 18
Sub Total (No of Trees.) 14625


5. Working plan prescription for the forest land proposed for diversion : No
6. Brief note on vulnerability of the forest area to erosion : The forest land involved in the project is prone to normal rates of erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : The proposed project area site is required from th
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Nilgai, Chital, Wild boar and Birds
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 684378985.00
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
11191.85Zudpi JungleButiboriNot applicable    View file
22103.83Zudpi JungleKhapaNot applicable    View file
33119.52Zudpi JungleKalmeshwarNot applicable    View file
4443.80Zudpi JungleNorth UmredNot applicable    View file
5527.00Zudpi JungleWardhaNot applicable    View file
6635.00Zudpi JungleArviNot applicable    View file
7760.00Zudpi JungleAshtiNot applicable    View file
8840.00Zudpi JungleBhandaraNot applicable    View file
99328.00Zudpi JungleAdyalNot applicable    View file
1010179.00Zudpi JungleTumsarNot applicable    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Cert. of Dycf regarding Absence of Alternative.
2 Cert from DM Gorewada regarding ArcheologicalImportance.
3 Cert of Dycf regarding annexure furnished in English
4 Documents Verification cert of Dycf.
5 Statement of Itemwise Breck up Land.
6 Nagpur_Division_PART_II of the proposal.
7 NPV_Certificate of DyCF.
8 Complete Tree Enumeration of project area
9 Cert of Dycf regarding Violation/Non Voilation of act.
10 Wildlife_Certificate of Dycf.
11 Cert of Dycf regarding Cutting & Felling of Trees.
12 Cert of Dycf regarding Distance from protected area.
13 Enumeration of Trees (To be Felled)

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Nagpur9931001460790.514546.7261142520.957529/06/2016520.95752742.74
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
NagpurNagpurDFOYesOne28/06/2016
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
NagpurNagpurDFO Recommended-
NagpurCF Recommended
quetiapin ritalin quetiapin mod angst quetiapin wirkstoff
Yes
Nodal Officer Recommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
MaharashtraState SecretaryRecommended05/08/2016 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
NagpurHead Office8-25/2016-FC08/06/2017
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/MH/Others/20037/2016OTHERS200372016835137,368,510.00137,368,510.0012/06/2017MAHBR52017061203802804Corporation BankNEFT/RTGS (Challan)12/06/201712/06/2017
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 170   (iii). No. of Maintenance years: 7   (iv). Total No. of Patches/Parcel: 8
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)20
  Status of CA Land so identified : Forest Area   Site Name : Mouza Tembheri   Location Details : Survey No. 77   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Tembheri Zudpi JungleOther Forest Land
  No. of patches : 2
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
2Block(Polygon)30
  Status of CA Land so identified : Forest Area   Site Name : Mouza Dhawalapeth   Location Details : Survey No. 108   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Dhawalapeth Zudpi JungleOther Forest Land
  No. of patches : 3
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
3Block(Polygon)10
  Status of CA Land so identified : Forest Area   Site Name : Mouza Dhawalapeth   Location Details : Survey No.3   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Dhawalapeth Zudpi JungleOther Forest Land
  No. of patches : 4
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
4Block(Polygon)20
  Status of CA Land so identified : Forest Area   Site Name : Mouza Sirsawadi   Location Details : Survey NO. 192/1   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Sirsawadi Zudpi JungleOther Forest Land
  No. of patches : 5
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
5Block(Polygon)15
  Status of CA Land so identified : Forest Area   Site Name : Mouza Yerla Dhote   Location Details : Survey No. 265   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Yerla Dhote Zudpi JungleOther Forest Land
  No. of patches : 6
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
6Block(Polygon)25
  Status of CA Land so identified : Forest Area   Site Name : Mouza Salai   Location Details : Survey NO. 227   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Salai Zudpi JungleOther Forest Land
  No. of patches : 7
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
7Block(Polygon)25
  Status of CA Land so identified : Forest Area   Site Name : Mouza Ubali   Location Details : Survey No. 485   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Ubali Zudpi JungleOther Forest Land
  No. of patches : 8
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
8Block(Polygon)25
  Status of CA Land so identified : Forest Area   Site Name : Mouza Khursapar   Location Details : Survey No. 7   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Khursapar Zudpi JungleOther Forest Land
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/MH/Others/20037/201611 Jul 2017No DataAbove C.A. Land is verified and found suitable for Compensatory Afforestration.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/MH/Others/20037/201608 Jun 2017
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/MH/Others/20037/201611 Jul 2017
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/MH/Others/20037/201627 Jun 2017APPROVED