PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : MH-0181/2021
1. Location of the project/Scheme : Maharashtra
 (i) State / Union Territory : Maharashtra  (ii) District : Chandrapur  (iii) Forest Division : Chandrapur  (iv) Area of forest land proposed for diversion (in ha.) : 1.19039  (v)

Category of the Proposal: Optical Fibre Cable
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Chandrapur0.93036Reserved Forest
2Chandrapur0.25713Protected Forest
3Chandrapur0.0029Unclassed Forests
Total 1.19039
Division 1. : Chandrapur
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Chandrapur1.19039
Total1.19039
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
11.190390.2Eco 3
Total. 1.19039


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL
5. Working plan prescription for the forest land proposed for diversion : AWC, IWC, SCI, Misc
6. Brief note on vulnerability of the forest area to erosion : The forest area in question being a Flat land is not vulnerable to erosion. It did not form part of eroded area.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): Yes
  Details of Protected Area and comments on the impact of Project on the ESZ : No adverse impact due to the project.
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : Yes
  Details and comments on the impact of Project on such areas : The forest area in question did not form part of any National park, Wild life Sanctuary etc. But proposed OFC line passing through under Eco-sensitive zone of Tadoba-Andhari Tiger Reserve. No adverse impact due to the project.
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 27.67
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
112.40RFChandrapur403    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 CA Google Image
2 Part-II
3 Certificate of Identified Forest
4 Certificate of No Violation
5 Certificate of Project area laying within or outside
6 Certificate of Within 10.00 Km from Boundary of the PA area
7 Site Inspection Report
8 Certificate of Does not harbour any important fauna or flora
9 Certificate of Not a Part of National Park
10 Certificate of Regarding Document Verification
11 List of Identified Forest
12 Working Plan Information
13 Certificate of Barest Minimum Demand
14 Certificate of Chronology Events
15 Certificate of Demarcation by Fixing of Boundary Stone
16 Certificate of Net Present Value
17 Certificate of No Cutting and Felling of Trees
18 Certificate of No Monuments or Sites
19 Certificate of Protected Area
20 Certificate of Scheduled Tribe and Other Traditional
21 RF Notification

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Chandrapur324250.0062385.001605.5526695.3720/12/2021695.37123.10
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
ChandrapurChandrapurDFOYesOne16/12/2021
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
ChandrapurChandrapurDFO RecommendedThis project is essential to provide the people of under developed areas with reliable and high speed media connectivity.
ChandrapurCF RecommendedRecommended for approvalYes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
MaharashtraState SecretaryRecommended15/03/2022Govt. of Maharashtra has accorded in principle approvalState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
NagpurState GovernmentFLD-2022/CR25/F-1014/03/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/MH/OFC/141949/2021OFC14194920218461,839,734.001,839,734.0002/05/2022HDFC512165412969Union Bank Of IndiaNEFT/RTGS (Challan)31/03/202201/04/2022
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 2.84   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)2.84
  Status of CA Land so identified : Forest Area   Site Name : Comptt. No. 403-RF   Location Details : Comptt. No. 403-RF Chandrapur   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Reserved ForestRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/MH/OFC/141949/202118 Jul 2022No DataVerified
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/MH/OFC/141949/202119 Jul 2022EDS: For query compliance21 Dec 2022
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/MH/OFC/141949/2021Recommended10 Oct 2022
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/MH/OFC/141949/2021IN-PRINCIPLENo Data